Declaration of SVA Non-Final Demand Facility for Exclusion from BSUoS |
Guidance Note |
An Electricity Storage Facility is a facility that performs Electricity Storage as its sole function.
An Electricity Generation Facility is a facility where Electricity Generation occurs as its sole function.
A combined Electrical Generation and Storage Facility is a facility that performs both Electrical Generation and Electrical Storage as its only functions.
An Eligible Services Facility is a facility that provides any Balancing Service or Ancillary Service which imports or exports Reactive Energy but does not result in the production or export of any Active Power to the Transmission System.
Is operated by a Non-Final Demand Facility Operator
For an Electricity Storage Facility the Non-Final Demand Facility Operator holds a Generation Licence;
Has its Imports and Exports, measured only by Half Hourly Metering Systems which are registered in the Supplier Meter Registration Service (SMRS) as part of a Supplier BM Unit, and where those Half Hourly Metering Systems only measure activities necessary for performing Electricity Non-Final Demand; and
Is the subject of a valid Declaration.
The SVA Non-Final Demand Facility Operator can submit SVA Non-Final Demand Declaration details using an on-line web form via the BSC Website. This is completed with the assistance from the Supplier as appropriate. Once submitted by the SVA Non-Final Demand Facility Operator, it is sent to the Supplier for them to complete their information and authorise via the Self-Service Gateway (Elexon Kinnect Customer Solution).
Where the Metering Systems at an SVA Non-Final Demand Facility are registered by more than one Supplier, the SVA Non-Final Demand Facility Operator can submit a SVA Non-Final Demand Declaration document via the on-line SVA Non-Final Demand Declaration website form for each Supplier by using the submit and clone option. This will replicate the details entered for the Facility and allow the SVA Non-Final Demand Facility Operator to enter the details for the other Supplier. Once submitted this would send a SVA Non-Final Demand Declaration to each of the Suppliers in the Self-Service Gateway (Elexon Kinnect Customer Solution) for them to approve.
The Supplier can submit SVA Non-Final Demand Declaration details on behalf of SVA Non-Final Demand Facility Operator using Self-Service Gateway (Elexon Kinnect Customer Solution). Please note that only Category A Supplier Authorised Signatories can submit an SVA Non-Final Demand Declaration. Other members of the organisation can be registered as Assistants in the Self-Service Gateway (Elexon Kinnect Customer Solution) and can fill out the SVA Non-Final Demand Declaration form, save it as draft and send it to a Category A Authorised Signatory to submit.
SVA Non-Final Demand Facility Operators via their Suppliers can submit a SVA Non-Final Demand Declaration Form (F602/01) via e-mail. The SVA Non-Final Demand Facility Operator needs to complete sections B, C and D of form 602/01 (with assistance from the Supplier as appropriate) and send this to the Supplier who will add their authorisation details16 in part A and send it onto the SVAA (bscservicedesk@cgi.com).
Field | Guidance |
SVA Non-Final Demand Declaration Type: | Choose only one from: New –SVA Non-Final Demand Facility declared for the first time or redeclared after being withdrawn. CoS – Change of Supplier - identifies that at least one MSID related to the SVA Non-Final Demand Facility has been the subject of a change of Supplier. CoA – Change of Agent – identifies that at least one MSID related to the SVA Non-Final Demand Facility is now managed by a different HHDA CoM – Change of Metering System - identifies that the SVA Non-Final Demand Facility has had at least one MSID added or removed from a SVA Non-Final Demand Declaration(s) Withdraw – identifies that the SVA Non-Final Demand Declaration(s) should be end-dated |
Declaration Set Id: | A unique value (up to 80 characters) assigned by the SVA Non-Final Demand Facility Operator and used to identify a single SVA Non-Final Demand Declaration or unite multiple SVA Non-Final Demand Declarations in respect of different Suppliers, submitted in SVA Non-Final Demand Declaration Document(s) at a particular point in time for an SVA Non-Final Demand Facility. The SVA Non-Final Demand Facility Operator should assign a new SVA Non-Final Demand Declaration Set ID when it updates a single SVA Non-Final Demand Declaration or multiple SVA Non-Final Demand Declarations for an SVA Non-Final Demand Facility, other than for SVA Non-Final Demand Declaration Type CoA, where the same Set id should be used. |
Declaration Id (where known): | This is a value generated and assigned by SVAA. For new SVA Non-Final Demand Declarations, leave blank. For CoS, CoA, CoM or withdraw, the SVA Non-Final Demand Declaration Id assigned by the SVAA on successful processing of the previous SVA Non-Final Demand Declaration. Note that this field is blank in the Self-Service Gateway (Elexon Kinnect Customer Solution). |
Declaration Set Effective From Date: | The date an SVA Non-Final Demand Declaration first takes effect or the date on which a change to an existing SVA Non-Final Demand Declaration takes effect, e.g. the date on which a new Supplier is the registrant for one of the Facility’s Metering Systems. |
SVA Non-Final Demand Facility Operator Participant ID | A unique, up to eight character ID chosen by the SVA Non-Final Demand Facility Operator. This cannot be the same as any other SVA Non-Final Demand Facility Operator Participant IDs. Nor can it be the same as any existing BSC Party Id unless the SVA Non-Final Demand Facility Operator and the BSC Party are the same entity. Please check the BSC Signatories and Qualified Persons webpage to ensure that your Participant Id is not currently in use by a BSC Party. The SVA Non-Final Demand Facility Operator Participant IDs are not published but the SVAA will ask you to change your ID if it is already in use. |
SVA Non-Final Demand Facility Operator Company Number | SVA Non-Final Demand Facility Operator’s Company Number as registered with Companies House |
SVA Non-Final Demand Facility Operator Company Name | SVA Non-Final Demand Facility Operator’s Company Name as registered with Companies House and with Ofgem as a Generation Licence holder. |
SVA Non-Final Demand Facility Operator Company Address | SVA Non-Final Demand Facility Operator’s Company Address as registered with Companies House |
SVA Non-Final Demand Facility Operator Company Director | SVA Non-Final Demand Facility Operator Company Director as registered with Companies House and the director who signed the SVA Non-Final Demand Declaration Document. |
SVA Non-Final Demand Facility Operator Director Email | The email address of the SVA Non-Final Demand Facility Operator Director |
SVA Non-Final Demand Facility Operator Contact Name | The name of the person dealing with the SVA Non-Final Demand Declaration on a day to day basis who may be the director or another person |
SVA Non-Final Demand Facility Operator Contact Phone | The phone number of the SVA Non-Final Demand Facility Operator Contact |
SVA Non-Final Demand Facility Operator Contact Email |
The email address of the SVA Non-Final Demand Facility Operator Contact |
Non-Final Demand Facility Id
| A unique up to 30 Character code assigned by the SVA Non-Final Demand Facility Operator. Where possible it should be a simple reference (ideally numerical) to reduce the risk of error when reading/processing SVA Non-Final Demand Declarations. |
Non-Final Demand Facility Name | The legal or operational name of the SVA Non-Final Demand Facility. |
Non-Final Demand Facility Address/Location: | The address and/or location (e.g. grid reference) at which the SVA Non-Final Demand Facility is located. This must include the postcode and country of the SVA Non-Final Demand Facility. |
Non-Final Demand Facility Description | A short description of the SVA Non-Final Demand Facility including the type of technology |
Non-Final Demand Facility Maximum Import Capacity (MW) | The rated Import capacity (MW) of the SVA Non-Final Demand Facility. |
Non-Final Demand Facility Maximum Export Capacity (MW) | The rated Export capacity (MW) of the SVA Non-Final Demand Facility. |
Non-Final Demand Facility Effective From Date: | For new SVA Non-Final Demand Declarations: The date from which the Non-Final Demand Facility should be treated as an SVA Non-Final Demand Facility. Where updating a SVA Non-Final Demand Declaration e.g. for CoS, CoA, CoM or the withdrawal of the SVA Non-Final Demand Declaration, the Facility EFD should be the date the Facility was first declared to SVAA. This date cannot be earlier than the submission date of the form without prior agreement from Elexon. |
Non-Final Demand Facility Effective To Date: | For withdrawals: The last date that the SVA Non-Final Demand Facility should be treated as an SVA Non-Final Demand Facility. |
Non-Final Demand Facility Total MSIDs Count: | The total number of Metering Systems measuring Imports to and Exports from the SVA Non-Final Demand Facility which may be registered by one or more Suppliers. e.g. if a SVA Non-Final Demand Facility has a total of four MSIDs, two registered by one Supplier and two registered by another, the total MSID count on each Supplier’s SVA Non-Final Demand Declaration would be four but each Supplier would only provide the details relating to two MSIDs. |
MSID | The unique market wide reference for a Metering System. Also known as Metering Point Administration Number (MPAN) |
Import/Export Indicator | Identifies whether a Metering System is an Import Metering System or Export Metering System |
GSP Group | The GSP Group within which the SVA Non-Final Demand Facility is connected (_A, _B, _C, _D, _E, _F, _G, _H, _J _K, _L, _M, _N or _P). |
MSID EFD (Non-Final Demand Facility) | The date from which an MSID is associated with an SVA Non-Final Demand Facility for the purpose of this SVA Non-Final Demand Declaration process. |
MSID ETD (Non-Final Demand Facility) | The date from which an MSID’s association with an SVA Non-Final Demand Facility ends for the purpose of this SVA Non-Final Demand Declaration process. |
Supplier MPID | The Market Participant ID for the Supplier. The SVA Non-Final Demand Facility Operator may need to liaise with its Supplier(s) to identify the Supplier MPIDs to include in its SVA Non-Final Demand Declaration Document. |
MSID Supplier EFD | The date from which an MSID is registered by a Supplier in SMRS17. |
HHDA MPID | The Market Participant ID for the Half Hourly Data Aggregator appointed by a Supplier to a Metering System. The SVA Non-Final Demand Facility Operator may need to liaise with its Supplier(s) to identify the HHDA MPIDs to include in its SVA Non-Final Demand Declaration Document. |
HHDA EFD | The date from which a Supplier appoints/appointed a Half Hourly Data Aggregator to a Metering System. This date should correspond with the HHDA’s EFD for the Metering System in SMRS. Note that the HHDA EFD may predate the SVA Non-Final Demand Declaration Set EFD18 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 CUSC ‘Connection Use of System Code’
2 CMP281 ‘Removal of BSUoS Charges From Energy Taken From the National Grid System by Storage Facilities’ – approved by Ofgem on 14 May 2020
3 CMP308 Removal of BSUoS charges from Generation – approved by Ofgem on 25 April 2022.
4 P383 ‘Enhanced reporting of demand data to the NETSO to facilitate CUSC Modifications CMP280 and CMP281. (CMP280 ‘Creation of a New Generator TNUoS Demand Tariff which Removes Liability for TNUoS Demand Residual Charges from Generation and Storage Users’ – rejected by Ofgem on 30 June 2021)
5 P419 ‘Extension of P383 to include non-final Demand’
6 SVA ‘Supplier Volume Allocation
7 SVAA ‘Supplier Volume Allocation Agent’
8 NETSO ‘National Electricity Transmission System Operator’
9 TUoS ‘Transmission Use of System’
10 BSUoS ‘Balancing Use of System’
11 MSIDs ‘Metering System Identifiers’
12 Supplier BM Unit gross HH demand is reported as Period BMU Gross HH Demand in the P0210. This represents all gross HH Imports attributed to the Supplier BMU, irrespective of whether Imports are to an SVA Non-Final Demand Facility. A ‘corrected’ value of Period BMU Gross HH Demand is also reported which is Period BMU Gross HH Demand less any Imports to SVA Non-Final Demand Facilities (separately reported as Period BMU Gross Non-Final Demand Demand). The ‘corrected’ value is reported as Corrected Period BMU Gross HH Demand.
13 CVA ‘Central Volume Allocation’
14 SF ‘Initial Settlement Run’
15 RF ‘Final Reconciliation Settlement Run’
16 Part A must be completed by a Supplier’s Category A or F authorised person.
17 Note that the Supplier and HHDA EFD may predate the Facility and MSID EFDs.