For the Half Hourly Data Collector (HHDC) and, where appointed in accordance with BSCP602, the Asset Metering Half Hourly Data Collector (AMHHDC) and to carry out the work for data collection (including data retrieval and data processing); and
For Supplier Volume Allocation (SVA) Meter Operator Agent (SVA MOA) or, where appointed in accordance with BSCP602, the Asset Metering Meter Operator Agent (AMMOA) and to carry out the work for meter operations (including, appointment changes, market data activities, connections, disconnections, reconfiguration or changes and where required proving (of Asset Metering Systems)).
be subject to the Qualification Requirements of Section J applicable to an AMMOA or to the functions of a AMMOA (Section J 2.1.2(a)) or in the case of an SVA MOA the equivalent requirements in the Retail Energy Code ;
install, commission, test, maintain, rectify faults and provide a sealing service in respect of Asset Metering Equipment (including if applicable associated Communications Equipment), in accordance with any relevant BSC Procedures and Codes of Practice (Section L 1.2.3A); and
maintain Meter Technical Details and to provide such Details, in accordance with Section L, to the relevant HHDC, AMHHDC, AMVLP or Supplier to enable such Data Collector to read and process data in accordance with the Supplier Volume Allocation Rules, in accordance with BSCP602 and all relevant Code Subsidiary Documents (Section S2.2.1(b) and (c)).
to collect Asset Metering System metered data;
to validate data and provide reports;
to enter validated metered data into the relevant data collection system;
to maintain relevant standing data;
to undertake Meter Advance Reconciliation to reconcile half hourly energy values with meter advances;
to sum register level data to produce Asset Metering System level data (where applicable);
for an AMHHDC, to provide Asset Metering System level data to the relevant HHDC; and
with the exception of AMHHDCs, to provide Asset Metering System level data to SVAA.
BSCP01 | Overview of Trading Arrangements |
BSCP11 | Trading Disputes |
BSCP32 | Metering Dispensations |
BSCP508 | Supplier Volume Allocation Agent |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents, Asset Metering Agents and CVA MOAs. |
BSCP602 | SVA Metering System & Asset Metering System Register |
AMHHDC | Asset Metering Half Hourly Data Collector |
AMMOA | Asset Metering Meter Operator Agent |
AMSID | Asset Metering System Identifier |
AMVLP | Asset Metering Virtual Lead Party |
BSC | Balancing and Settlement Code |
BSCP | BSC Procedure |
CoP | Code of Practice |
CT | Current Transformer |
DC | Data Collector |
DTC | Data Transfer Catalogue |
DTN | Data Transfer Network |
HH | Half Hourly |
HHDC | Half Hourly Data Collector |
HHU | Hand Held Unit |
Id | Identifier |
kV | Kilo Volt |
kWh | Kilowatt hour |
MAR | Meter Advance Reconciliation |
MOA | Meter Operator Agent1 |
MTD | Meter Technical Details |
SMRS | Supplier Meter Registration System |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
SVA MOA | SVA Meter Operator Agent |
UTC | Co-ordinated Universal Time |
VT | Voltage Transformer |
WD | Working Day |
Wh | Watt hour |
General Obligations
The AMMOA shall use systems and processes so approved in accordance with BSCP537 in the operation of Asset Metering Equipment. These systems and processes must also comply with all other applicable requirements set out in the BSC and the BSC Procedures. OR
Notification Requirements to the Supplier Volume Allocation Agent (SVAA) for Asset Metering Equipment
Asset Metering System ID;
Asset Meter Serial Number;
Asset Meter Type;
Date of Asset Meter Installation; and
Date of Asset Meter Removal.
P0304 ‘Rejection of Asset Meter Registration’; or
P0305 ‘Confirmation of Asset Meter Registration’.
Registration Obligations
Metering Obligations
Meter Fault Reporting
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD | |||||
2.1.1.1 | As required | AMVLP or Supplier appoints a Meter Operator and HHDC and, if applicable, an AMHHDC | AMVLP or Supplier
| SVA MOA or AMMOA HHDC and where applicable AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms
P0314 Notification of AMHHDC | Electronic or other method, as agreed. | |||||
2.1.1.2 | If appointment rejected and within 5 WD of 2.1.1.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.1.4) (Go to 2.1.1.1 if required) | SVA MOA or AMMOA HHDC or AMHHDC | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. | |||||
2.1.1.3 | If appointment accepted and within 5 WD of 2.1.1.1 | Send notification of acceptance of appointment. | SVA MOA or AMMOA HHDC or AMHHDC | AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. | |||||
2.1.1.4 | On appointment of agents and within 5 WD of 2.1.1.3 | Send notification of appointed agents | AMVLP or Supplier
| SVA MOA or AMMOA HHDC and where applicable AMHHDC | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. | Electronic or other method, as agreed. | |||||
2.1.1.5 | Following 2.1.1.4 and upon receipt of Asset Metering System details | Record Asset Metering System details | HHDC AMHHDC (if applicable) |
| Sufficient details of HHDC’s and AMHHDC’s appointment in respect of an Asset Metering System to enable the HHDC and AMHHDC to perform its HHDC and AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC and AMHHDC are appointed. | Internal Process. | |||||
2.1.1.6 | Following 2.1.1.3 and at least 10 WD before 2.1.1.105 | Request installation, Commissioning and energisation of Asset Metering System
| AMVLP or Supplier | SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters | Electronic or other method, as agreed. | |||||
2.1.1.7 | Within 2 WD of 2.1.1.6 | Request Site Technical Details. Optional for SVA MOA or AMMOA to request – if not requested continue to 2.1.1.10 | SVA MOA or AMMOA | AMVLP or Supplier | D0170 Request for Metering System Related Details
| Electronic or other method, as agreed. | |||||
2.1.1.8 | If request for Site Technical Details rejected and within 5 WD of 2.1.1.7 | Send Rejection response for request for Site Technical Details including the reasons why the request has been rejected. | AMVLP or Supplier | SVA MOA or AMMOA | P0319 ‘Rejection Response for Request for Asset Metering System Site Technical Details’
| Electronic or other method, as agreed. | |||||
2.1.1.9 | Within 5 WD of 2.1.1.7 | Send Site Technical Details | AMVLP6 or Supplier | SVA MOA or AMMOA | P0315 Provision of Site Technical Details
| Electronic or other method, as agreed. | |||||
2.1.1.10 | On the date requested or agreed in 2.1.1.6 | Install Asset Metering System in accordance with Code of Practice Eleven If requested energise Asset Metering System and note initial Asset Meter register reading (if applicable). | SVA MOA or AMMOA |
|
| Internal Process | |||||
2.1.1.11 | Following 2.1.1.10 | Commission Asset Metering System in accordance with Code of Practice Eleven and sections 2.1.2
| SVA MOA or AMMOA |
|
| Internal Process | |||||
2.1.1.12 | If Asset Metering System cannot be installed or energised, as soon as possible and within 5 WD of 2.1.1.10 | Inform AMVLP | SVA MOA or AMMOA | AMVLP or Supplier | D0221 Notification of Failure to Install or Energise Metering System
| Electronic or other method, as agreed. | |||||
2.1.1.13 | Within 5 WD of 2.1.1.10 or within 2 WD of 2.1.1.17 (as applicable) | Send energisation status, Meter Technical Details and initial Asset Meter register reading (if applicable) | SVA MOA or AMMOA | AMVLP or Supplier HHDC and AMHHDC (if applicable) | D0010 Meter Readings D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. | |||||
2.1.1.14 | Where appropriate, from HHDC or AMHHDC appointment start date | Collect Asset Metered Data | HHDC AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process | |||||
2.1.1.15 | Within 5 WD of 2.1.1.10 and at same time as 2.1.1.13 | Send the relevant Asset Meter information. | AMVLP or Supplier
| SVAA HHDC and AMHHDC (if applicable) | P0303 Asset Meter Registration
| Electronic or other method, as agreed. | |||||
2.1.1.16 | Immediately following 2.1.1.15 or 2.1.1.17 | Perform validation checks and send response
If response is “Accepted”, proceed to 2.1.1.18, otherwise proceed to 2.1.1.17. | SVAA | AMVLP or Supplier
| P0304 Rejection of Asset Meter Registration; or P0305 Confirmation of Asset Meter Registration | Electronic or other method, as agreed. | |||||
2.1.1.17 | Within 5 WD of 2.1.1.16 | Where the rejection is of a type the AMVLP or Supplier can resolve without involving other industry parties, send a corrected flow. Proceed to 2.1.1.16
If the AMVLP or Supplier needs to involve other industry parties to resolve the issue, then reasonable endeavours should apply. Notify SVA MOA or AMMOA of rejection reasons and request new D0268. Proceed to 2.1.1.13 | AMVLP or Supplier
AMVLP or Supplier
| SVAA HHDC and AMHHDC (if applicable)
SVA MOA or AMMOA | P0303 Asset Meter Registration
P0304 Rejection of Asset Meter Registration | Electronic or other method, as agreed.
Electronic or other method, as agreed.
| |||||
2.1.1.18 | In accordance with timescales in Appendix 3.6.5 | Carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | SVA MOA or AMMOA | HHDC AMHHDC (if applicable) | Refer to Appendix 3.6 | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.2.1 | On the date requested or agreed in 2.1.1.6 but no later than 16 WD after energisation | If the SVA MOA or AMVLP or Supplier does not own the Measurement Transformers then Commission Measurement Transformers in accordance with Code of Practice Eleven. (If not applicable, i.e. SVA MOA or AMVLP or Supplier does own the Measurement Transformers or there are no Measurement Transformers in the Asset Metering System go to 2.1.2.3) | Equipment Owner |
|
| Internal Process |
2.1.2.2 | Following 2.1.2.1 and no later than 5 WD of completion of tests in 2.1.2.1 | Send Commissioning information for the Measurement Transformers to the SVA MOA and AMVLP or Supplier.
| Equipment Owner | SVA MOA and AMVLP or Supplier
| D0383 ‘Notification of Commissioning Information’
| Electronic or other method, as agreed. |
2.1.2.3 | On the date requested or agreed in 2.1.1.5 but no later than 32 WD after Energisation | Commission Asset Metering System in accordance with Code of Practice Eleven. | SVA MOA or AMMOA |
|
| Internal Process |
2.1.2.4 | Following 2.1.2.3 | If there has been a defect/omission that has prevented Commissioning7. OR If Commissioning has been completed | SVA MOA or AMMOA |
| Go to 2.1.2.5
OR Go to 2.1.2.8 | Internal Process |
2.1.2.5 | At the earliest opportunity but no later than 5 WD of 2.1.2.4 | Inform the AMVLP or Supplier where there is a defect/omission that has prevented Commissioning. | SVA MOA or AMMOA | AMVLP or Supplier
| D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.2.6 | At the earliest opportunity but no later than 65 WD after energisation | Resolve the defect/omission that has prevented Commissioning8.
Inform the SVA MOA or AMMOA that the defect/omission that has prevented Commissioning has been resolved. |
AMVLP or Supplier
|
SVA MOA or AMMOA |
D0384 Notification of Commissioning Status
|
Electronic or other method, as agreed. |
2.1.2.7 | When defect/omission has been resolved, but no later than 80 WD after energisation | Commission Asset Metering System in accordance with Code of Practice Eleven. | SVA MOA or AMMOA |
|
| Internal Process |
2.1.2.8 | Within 5 WD of 2.1.2.3 or 2.1.2.7, as applicable | Inform the AMVLP or Supplier that Commissioning has been completed | SVA MOA or AMMOA | AMVLP or Supplier
| D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.2.9 | Following 2.1.2.8 | Create internal record of Commissioning information | SVA MOA or AMMOA |
| D0383 ‘Notification of Commissioning Information’
| Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.3.1 | As required | AMVLP or Supplier appoints a Meter Operator and HHDC and, if applicable, an AMHHDC | AMVLP or Supplier
| SVA MOA or AMMOA HHDC and where applicable AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.3.2 | If appointment rejected and within 5 WD of 2.1.3.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.3.4) (Go to 2.1.3.1 if required) | SVA MOA or AMMOA HHDC or AMHHDC | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.3.3 | If appointment accepted and within 5 WD of 2.1.3.1 | Send notification of acceptance of appointment. | SVA MOA or AMMOA HHDC or AMHHDC | AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.3.4 | On appointment of agents and within 5 WD of 2.1.3.3 | Send notification of appointed agents | AMVLP or Supplier
| SVA MOA or AMMOA HHDC and where applicable AMHHDC | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
2.1.3.5 | Following 2.1.3.4 and upon receipt of Asset Metering System details | Record Asset Metering System details | HHDC AMHHDC (if applicable) |
| Sufficient details of HHDC’s and AMHHDC’s appointment in respect of an Asset Metering System to enable the HHDC and AMHHDC to perform its HHDC and AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC and AMHHDC are appointed. | Internal Process. |
2.1.3.6 | Following 2.1.3.3 and at least 10 WD before 2.1.3.79 | Request confirmation of compliance as an Asset Metering System and if applicable installation, Commissioning and energisation of Asset Metering System | AMVLP10 or Supplier
| SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters P0315 Provision of Site Technical Details D0268 Half Hourly Meter Technical Details D0383 ‘Notification of Commissioning Information’ If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.3.7 | Following receipt of information in 2.1.3.6 | Determine if Asset Metering System is compliant with Code of Practice Eleven, determine Overall Accuracy of Metering System and Risk to Settlement. Where Asset Metering System compliant continue to 2.1.3.9; or Where Asset Metering System in non-compliant continue to 2.1.3.8 | SVA MOA or AMMOA |
|
| Internal Process |
2.1.3.8 | Following 2.1.3.7 | Inform the AMVLP or Supplier that verification checks have been completed and that the Asset Metering System is non-compliant, the reasons for non-compliance must be detailed. If applicable, continue to 2.2.4 where Asset Meter System to be reconfigured or replaced If applicable, continue to 2.1.2 where Asset Metering System to be re-commissioned.
END PROCESS | SVA MOA or AMMOA | AMVLP or Supplier
| D0384 Notification of Commissioning Status P0318 Metering Non-Compliance Notification | Electronic or other method, as agreed. |
2.1.3.9 | Following 2.1.3.7 and within 5 WD of receipt of Site Technical Details in 2.1.3.7 | Send energisation status, Meter Technical Details and initial Asset Meter register reading (if applicable) | SVA MOA or AMMOA | AMVLP or Supplier
HHDC and AMHHDC (if applicable) | D0010 Meter Readings D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.3.10 | Where appropriate, from HHDC or AMHHDC appointment start date | Collect Asset Metered Data | HHDC AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.3.11 | At same time as 2.1.3.9 | Send the relevant Asset Meter information. | AMVLP or Supplier
| SVAA HHDC and AMHHDC (if applicable) | P0303 Asset Meter Registration
| Electronic or other method, as agreed. |
2.1.3.12 | Immediately following 2.1.3.11 | Perform validation checks and send response
If response is “Accepted”, proceed to 2.1.3.14, otherwise proceed to 2.1.3.13. | SVAA | AMVLP or Supplier | P0304 Rejection of Asset Meter Registration or P0305 Confirmation of Asset Meter Registration | Electronic or other method, as agreed. |
2.1.3.13 | Within 5 WD of 2.1.3.12 | Where the rejection is of a type the AMVLP or Supplier can resolve without involving other industry parties, send a corrected flow. Proceed to 2.1.3.12
If the AMVLP or Supplier needs to involve other industry parties to resolve the issue, then reasonable endeavours should apply. Notify MOA of rejection reasons and request new D0268. Proceed to 2.1.3.9 | AMVLP
AMVLP or Supplier
| SVAA HHDC and AMHHDC (if applicable)
SVA MOA or AMMOA | P0303 Asset Meter Registration
P0304 Rejection of Asset Meter Registration | Electronic or other method, as agreed.
Electronic or other method, as agreed. |
2.1.3.14 | In accordance with timescales in Appendix 3.6.5 | Carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | SVA MOA or AMMOA | HHDC AMHHDC (if applicable) | Refer to Appendix 3.6 | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.4.1 | As required | New AMVLP or Supplier notifies the Meter Operator and HHDC, and AMHHDC (if applicable) | New AMVLP or Supplier
| SVA MOA or AMMOA HHDC and where applicable AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.4.2 | If appointment rejected and within 5 WD of 2.1.4.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.4.4) (Go to 2.1.4.1 if required) | SVA MOA or AMMOA HHDC AMHHDC (if applicable) | New AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.4.3 | If appointment accepted and within 5 WD of 2.1.4.1 | Send notification of acceptance of appointment. | SVA MOA or AMMOA HHDC AMHHDC (if applicable) | New AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.4.4 | Within 5 WD of notification or by last date of AMVLP or Supplier appointment | Send notification of termination of appointment. | Current AMVLP or Supplier
| SVA MOA or AMMOA HHDC AMHHDC (if applicable) | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by the Registrant (AMVLP or Supplier) | Electronic or other method, as agreed. |
2.1.4.5 | Within 10 WD after the end of HHDC or AMHHDC appointment to old AMVLP or Supplier. | Complete Asset Metered Data collection activities for old AMVLP or Supplier. | HHDC AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.4.6 | On appointment of agents and within 5 WD of 2.1.4.3 | Send notification of appointed agents | New AMVLP or Supplier
| SVA MOA or AMMOA HHDC and and where applicable AMHHDC | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
2.1.4.7 | Within 1 WD of 2.1.4.6 | Request Meter Technical Details | New AMVLP or Supplier
| SVA MOA or AMMOA | D0170 Request for Metering System Related Details
| Electronic or other method, as agreed. |
2.1.4.8 | Within 5 WD of 2.1.4.7 | Send Meter Technical Details | SVA MOA or AMMOA | New AMVLP or New Supplier HHDC and AMHHDC (if applicable) | D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.5.1 | As required | AMVLP or Supplier appoints a SVA MOA or AMMOA | AMVLP or Supplier
| New SVA MOA or New AMMOA | D0155 Notification of Meter Operator or Data Collector Appointment and Terms
| Electronic or other method, as agreed. |
2.1.5.2 | If appointment rejected and within 5 WD of 2.1.5.1 | Send notification of rejection of appointment including the reason why the request has been rejected. (Go to 2.1.5.1 if required) | New SVA MOA or New AMMOA | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.5.3 | If appointment accepted and within 5 WD of 2.1.5.1 | Send notification of acceptance of appointment. | New SVA MOA or New AMMOA | AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.5.4 | Within 5 WD of 2.1.5.3 | Send de-appointment | AMVLP or Supplier
| Current SVA MOA or Current AMMOA | D0151 Termination of Appointment or Contract by Supplier
| Electronic or other method, as agreed. |
2.1.5.5 | If de-appointment rejected and within 5 WD of 2.1.5.4 | Send notification of rejection of de-appointment. | Current SVA MOA or Current AMMOA | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.5.6 | On appointment of new SVA MOA / AMMOA and within 5 WD of 2.1.5.4 | Send notification of SVA MOA / AMMOA appointment / de-appointment | AMVLP or Supplier
| New SVA MOA or New AMMOA HHDC and and where applicable AMHHDC | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
2.1.5.7 | Within 2 WD of 2.1.5.6 | Instruct current SVA MOA / AMMOA to send Meter Technical Details to new SVA MOA/ AMMOA | AMVLP or Supplier
| Current SVA MOA or Current AMMOA | D0170 Request for Metering System Related Details
| Electronic or other method, as agreed. |
2.1.5.8 | Within 5 WD of 2.1.5.7 | Send Meter Technical Details. | Current SVA MOA or Current AMMOA | New SVA MOA or New AMMOA | D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.5.9 | Following 2.1.5.8 | Send Commissioning information | Current SVA MOA or Current AMMOA | New SVA MOA or New AMMOA | D0383 ‘Notification of Commissioning Information’ D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.5.10 | Within 5 WD of 2.1.5.8 | Send Meter Technical Details | New SVA MOA or New AMMOA | AMVLP or Supplier
HHDC and AMHHDC (if applicable) | D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.5.11 | Following 2.1.5.10 | Send Commissioning information | New SVA MOA or New AMMOA | AMVLP or Supplier
| D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.5.12 | Following 2.1.5.11 and in accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | New SVA MOA or New AMMOA | HHDC AMHHDC (if applicable) | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.6.1 | As required | AMVLP or Supplier appoints a SVA MOA or an AMMOA
| New AMVLP or Supplier | New SVA MOA or New AMMOA | D0155 Notification of Meter Operator or Data Collector Appointment and Terms
| Electronic or other method, as agreed. |
2.1.6.2 | If appointment rejected and within 5 WD of 2.1.6.1 | Send notification of rejection of appointment including the reason why the request has been rejected. (Go to 2.1.6.1 if required)
| New SVA MOA or New AMMOA | New AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.6.3 | If appointment accepted and within 5 WD of 2.1.6.1 | Send notification of acceptance of appointment.
| New SVA MOA or New AMMOA | New AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.6.4 | Within 5 WD of notification from SVAA or by last date of AMVLP or Supplier Appointment | Send notification of termination of appointment.
| Current AMVLP or Supplier
| Current SVA MOA or Current AMMOA | D0151 Termination of Appointment or Contract by Supplier
| Electronic or other method, as agreed. |
2.1.6.5 | Within 5 WD of 2.1.6.311 | Send notification of appointed HHDC and AMHHDC (if applicable), and current SVA MOA or AMMOA. | New AMVLP or Supplier
| New SVA MOA or New AMMOA HHDC and and where applicable AMHHDC | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
2.1.6.6 | Within 2 WD of 2.1.6.5 | Request Meter Technical Details | New SVA MOA or New AMMOA | Current SVA MOA or Current AMMOA | D0170 Request for Metering System Related Details
| Electronic or other method, as agreed. |
2.1.6.7 | Within 5 WD of 2.1.6.6 | Send Meter Technical Details | Current SVA MOA or Current AMMOA | New SVA MOA or New AMMOA | D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.6.8 | Following 2.1.6.7 | Send Commissioning information | Current SVA MOA or Current AMMOA | New SVA MOA or New AMMOA | D0383 ‘Notification of Commissioning Information’ D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.6.9 | Within 5 WD of receipt of Meter Technical Details in 2.1.6.7 | Send Meter Technical Details | New SVA MOA or New AMMOA | New AMVLP or Supplier
HHDC and AMHHDC (if applicable) | D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.6.10 | Following 2.1.6.9 | Send Commissioning information | New SVA MOA or New AMMOA | New AMVLP or Supplier
| D0384 Notification of Commissioning Status
| Electronic or other method, as agreed. |
2.1.6.11 | Following 2.1.6.10 and in accordance with timescales in Appendix 3.6.5 | If Meter Technical Details manually intervened or there has been a key field change carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | New SVA MOA or New AMMOA | HHDC and AMHHDC (if applicable) | Refer to Appendix 3.6 | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.7.1 | As required on appointment of new HHDC | AMVLP or Supplier appoints an HHDC | AMVLP or Supplier
| New HHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms | Electronic or other method, as agreed. |
2.1.7.2 | If appointment rejected and within 5 WD of 2.1.7.1 | Send notification of rejection of appointment including the reason why the request has been rejected. (Go to 2.1.7.1 if required) | New HHDC | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.7.3 | If appointment accepted and within 5 WD of 2.1.7.1 | Send notification of acceptance of appointment. | New HHDC | AMVLP or Supplier
| D0011 Agreement of Contractual Terms | Electronic or other method, as agreed. |
2.1.7.4 | On appointment of new HHDC and within 5 WD of 2.1.7.3 | Send notification of appointed SVA MOA or AMMOA, HHDC and, if applicable, AMHHDC; and Asset Meter Registration details P0303 only needs sent to new HHDC | AMVLP or Supplier
| New HHDC and where applicable AMMHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. P0303 Asset Meter Registration
| Electronic or other method, as agreed. |
2.1.7.5 | Following 2.1.7.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New HHDC |
| Sufficient details of HHDC’s appointment in respect of an Asset Metering System to enable the HHDC to perform its HHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC is appointed. | Internal Process. |
2.1.7.6 | Within 5 WD of notification of appointment of new HHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New HHDC | D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.7.7 | On appointment of new HHDC | Send notification of termination of appointment for Asset Metering System.
| AMVLP or Supplier
| Old HHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by AMVLP rather than Supplier | Electronic or other method, as agreed. |
2.1.7.8 | Within 10 WD after end of old HHDC appointment to AMVLP | Complete data collection activities for the AMVLP or Supplier. | Old HHDC AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.7.9 | In accordance with timescales in Appendix 3.6.5 | Where no AMHHDC is appointed, Prove Asset Metering System in accordance with Section 2.4, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | New HHDC
| Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.7.10 | Where appropriate, from new HHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading.
Where an AMHHDC has been appointed END PROCESS
Where the HHDC collects data from the Asset Meter continue to 2.1.7.11 | New HHDC or AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.7.11 | Before Final Reconciliation Volume Allocation Run12 | Request 14 months of historic Asset Metered Data | New HHDC | Old HHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.7.12 | Within 5 WD of request in 2.1.7.11 | Send historic Asset Metered Data as available | Old HHDC | New HHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.7.13 | As required | Request final Asset Meter reading | New HHDC | Old HHDC | D0005 Instruction on Action | Electronic or other method, as agreed. |
2.1.7.14 | Within 5 WD of 2.1.7.13 | Send final Asset Meter reading (if available in Asset Meter)13
| Old HHDC | New HHDC | D0010 Meter Readings
| Electronic or other method, as agreed. |
2.1.7.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the HHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New HHDC | Old HHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation – Asset Metering Systems14. |
Email. |
2.1.7.16 | Within 5 WD of 2.1.7.15 | Send final physical Asset Meter reading (if available in Asset Meter)12 | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.8.1 | As required on appointment of new AMHHDC | AMVLP or Supplier appoints a new AMHHDC | AMVLP or Supplier
| New AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms
| Electronic or other method, as agreed. |
2.1.8.2 | If appointment rejected and within 5 WD of 2.1.8.1 | Send notification of rejection of appointment including the reason why the request has been rejected. (Go to 2.1.8.1 if required) | New AMHHDC | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.8.3 | If appointment accepted and within 5 WD of 2.1.8.1 | Send notification of acceptance of appointment. | New AMHHDC | AMVLP or Supplier
| D0011 Agreement of Contractual Terms | Electronic or other method, as agreed. |
2.1.8.4 | On appointment of new AMHHDC and within 5 WD of 2.1.8.3 | Send notification of appointed SVA MOA or AMMOA and HHDC, and if applicable AMHHDC; and Asset Meter Registration details P0303 only needs sent to new AMHHDC | AMVLP or Supplier
| New AMHHDC HHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. P0303 Asset Meter Registration | Electronic or other method, as agreed. |
2.1.8.5 | Following 2.1.8.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New AMHHDC |
| Sufficient details of AMHHDC’s appointment in respect of an Asset Metering System to enable the AMHHDC to perform its AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the AMHHDC is appointed. | Internal Process. |
2.1.8.6 | Within 5 WD of notification of appointment of new AMHHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New AMHHDC | D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.8.7 | On appointment of new AMHHDC | Send notification of termination of appointment for Asset Metering System. | AMVLP or Supplier
| Old AMHHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by AMVLP rather than Supplier | Electronic or other method, as agreed. |
2.1.8.8 | Within 10 WD after end of old AMHHDC appointment to AMVLP or Supplier. | Complete data collection activities for the AMVLP or Supplier. | HHDC Old AMHHDC (if applicable) |
| Refer to Section 2.3.2 | Internal Process |
2.1.8.9 | In accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | HHDC New AMHHDC | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.8.10 | Where appropriate, from new AMHHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading. | HHDC or New AMHHDC |
| Refer to Section 2.3.2 | Internal Process |
2.1.8.11 | Before Final Reconciliation Volume Allocation Run15 | Request 14 months of historic Asset Metered Data | New AMHHDC | Old AMHHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.8.12 | Within 5 WD of request in 2.1.8.11 | Send historic Asset Metered Data as available | Old AMHHDC | New AMHHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.8.13 | As required | Request final Asset Meter reading | New AMHHDC | Old AMHHDC | D0005 Instruction on Action | Electronic or other method, as agreed. |
2.1.8.14 | Within 5 WD of 2.1.8.13 | Send final Asset Meter reading (if available in Asset Meter)16
| Old AMHHDC | New AMHHDC | D0010 Meter Readings
| Electronic or other method, as agreed. |
2.1.8.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the AMHHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New AMHHDC | Old AMHHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation – Asset Metering Systems17. |
Email. |
2.1.8.16 | Within 5 WD of 2.1.8.15 | Send final physical Asset Meter reading (if available in Asset Meter)12 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.9.1 | As required | AMVLP or Supplier appoints a new HHDC and a new AMHHDC | AMVLP or Supplier
| New HHDC New AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.9.2 | If appointment rejected and within 5 WD of 2.1.9.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.9.4) (Go to 2.1.9.1 if required) | New HHDC New AMHHDC | AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.9.3 | If appointment accepted and within 5 WD of 2.1.9.1 | Send notification of acceptance of appointment. | New HHDC New AMHHDC
| AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.9.4 | On appointment of Data Collector(s) and within 5 WD of 2.1.9.3 | Send notification of appointed SVA MOA or AMMOA, HHDC and if applicable AMHHDC; and Asset Meter Registration details P0303 only needs sent to new AMHHDC and HHDC | AMVLP or Supplier
| New HHDC New AMHHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. P0303 Asset Meter Registration
| Electronic or other method, as agreed. |
2.1.9.5 | Following 2.1.9.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New HHDC New AMHHDC |
| Sufficient details of HHDC’s and AMHHDC’s appointment in respect of an Asset Metering System to enable the HHDC and AMHHDC to perform its HHDC and AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC and AMHHDC are appointed. | Internal Process. |
2.1.9.6 | Within 5 WD of notification of appointment of new HHDC and new AMHHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New HHDC New AMHHDC AMVLP or Supplier
| D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.9.7 | On appointment of new HHDC and new AMHHDC | Send notification of termination of appointment for Asset Metering System. | AMVLP or Supplier
| Old HHDC Old AMHHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by AMVLP rather than Supplier | Electronic or other method, as agreed. |
2.1.9.8 | Within 10 WD after end of old HHDC and old AMHHDC appointment to AMVLP or Supplier. | Complete data collection activities for the AMVLP or Supplier. | Old HHDC Old AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.9.9 | In accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | New HHDC New AMHHDC | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.9.10 | Where appropriate, from new HHDC and AMHHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading. | New HHDC New AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.9.11 | Before Final Reconciliation Volume Allocation Run18 | Request 14 months of historic Asset Metered Data | New AMHHDC | Old AMHHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.9.12 | Within 5 WD of request in 2.1.9.11 | Send historic Asset Metered Data as available | Old AMHHDC | New AMHHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.9.13 | As required | Request final Asset Meter reading | New AMHHDC | Old AMHHDC | D0005 Instruction on Action
| Electronic or other method, as agreed. |
2.1.9.14 | Within 5 WD of 2.1.9.13 | Send final Asset Meter reading (if available in Asset Meter)19 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
2.1.9.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the AMHHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New AMHHDC | Old AMHHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation20. |
|
2.1.9.16 | Within 5 WD of 2.1.9.15 | Send final physical Asset Meter reading (if available in Asset Meter)21 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.10.1 | As required | New AMVLP or Supplier appoints a new HHDC | New AMVLP or Supplier
| New HHDC and where applicable AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.10.2 | If appointment rejected and within 5 WD of 2.1.10.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset MeteringAgent(s) prior to step 2.1.10.4) (Go to 2.1.10.1 if required) | New HHDC AMHHDC (if applicable) | New AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.10.3 | If appointment accepted and within 5 WD of 2.1.10.1 | Send notification of acceptance of appointment. | New HHDC
| New AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.10.4 | On appointment of Data Collector(s) and within 5 WD of 2.1.10.3 | Send notification of appointed SVA MOA or AMMOA, HHDC and if applicable AMHHDC; and Asset Meter Registration details P0303 only needs sent to new AMHHDC and HHDC | New AMVLP or Supplier
| New HHDC and where applicable AMHHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC
D0302 Notification of Customer Details.
P0303 Asset Meter Registration | Electronic or other method, as agreed. |
2.1.10.5 | Following 2.1.10.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New HHDC |
| Sufficient details of HHDC’s appointment in respect of an Asset Metering System to enable the HHDC to perform its HHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC are appointed. | Internal Process. |
2.1.10.6 | Within 5 WD of notification of appointment of new HHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New HHDC AMHHDC (if applicable) New AMVLP or Supplier
| D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.10.7 | On appointment of new AMVLP or Supplier and new HHDC | Send notification of termination of appointment for Asset Metering System. | Old AMVLP or Supplier
| Old HHDC AMHHDC (if applicable) | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by the Registrant (AMVLP or Supplier) | Electronic or other method, as agreed. |
2.1.10.8 | Within 10 WD after end of old HHDC and if applicable AMHHDC appointment to old AMVLP or Supplier | Complete data collection activities for the old AMVLP or Supplier | Old HHDC AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.10.9 | In accordance with timescales in Appendix 3.6.5 | Where no AMHHDC is appointed, Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | New HHDC
| Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.10.10 | Where appropriate, from new HHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading.
Where an AMHHDC has been appointed END PROCESS
Where the HHDC collects data from the Asset Meter continue to 2.1.10.11 | New HHDC AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.10.11 | Before Final Reconciliation Volume Allocation Run21 | Request 14 months of historic Asset Metered Data | New HHDC | Old HHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.10.12 | Within 5 WD of request in 2.1.10.11 | Send historic Asset Metered Data as available | Old HHDC | New HHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.10.13 | As required | Request final Asset Meter reading | New HHDC | Old HHDC | D0005 Instruction on Action
| Electronic or other method, as agreed. |
2.1.10.14 | Within 5 WD of 2.1.10.13 | Send final Asset Meter reading (if available in Asset Meter)22 | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
2.1.10.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the HHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New HHDC | Old HHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation23. |
|
2.1.10.16 | Within 5 WD of 2.1.10.15 | Send final physical Asset Meter reading (if available in Asset Meter)21 | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.11.1 | As required | New AMVLP or Supplier sends notification of a new AMHHDC | New AMVLP or Supplier
| HHDC New AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.11.2 | If appointment rejected and within 5 WD of 2.1.11.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.11.4) (Go to 2.1.11.1 if required) | HHDC New AMHHDC | New AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.11.3 | If appointment accepted and within 5 WD of 2.1.11.1 | Send notification of acceptance of appointment. | New AMHHDC
| New AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.11.4 | On appointment of Data Collector(s) and within 5 WD of 2.1.11.3 | Send notification of appointed SVA MOA or AMMOA, HHDC and if applicable AMHHDC; and Asset Meter Registration details P0303 only needs sent to new AMHHDC and HHDC | New AMVLP or Supplier
| HHDC New AMHHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details.
P0303 Asset Meter Registration | Electronic or other method, as agreed. |
2.1.11.5 | Following 2.1.11.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New AMHHDC |
| Sufficient details of AMHHDC’s appointment in respect of an Asset Metering System to enable the AMHHDC to perform its AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the AMHHDC are appointed. | Internal Process. |
2.1.11.6 | Within 5 WD of notification of appointment of new AMHHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New AMHHDC New AMVLP or Supplier
| D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.11.7 | On appointment of new AMVLP or Supplier and new AMHHDC | Send notification of termination of appointment for Asset Metering System. | Old AMVLP or Supplier
| Old AMHHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by the Registrant of the Asset Metering System (Supplier or AMVLP). | Electronic or other method, as agreed. |
2.1.11.8 | Within 10 WD after end of old HHDC and AMHHDC appointment to old AMVLP or Supplier. | Complete data collection activities for the old AMVLP or Supplier. | HHDC Old AMHHDC (if applicable) |
| Refer to Section 2.3.2 | Internal Process |
2.1.11.9 | In accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | HHDC New AMHHDC (if applicable) | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.11.10 | Where appropriate, from new AMHHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading. | HHDC New AMHHDC (if applicable) |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.11.11 | Before Final Reconciliation Volume Allocation Run24 | Request 14 months of historic Asset Metered Data | New AMHHDC | Old AMHHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.11.12 | Within 5 WD of request in 2.1.11.11 | Send historic Asset Metered Data as available | Old AMHHDC | New AMHHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.11.13 | As required | Request final Asset Meter reading | New AMHHDC | Old AMHHDC | D0005 Instruction on Action | Electronic or other method, as agreed. |
2.1.11.14 | Within 5 WD of 2.1.11.13 | Send final Asset Meter reading (if available in Asset Meter)25
| Old AMHHDC | New AMHHDC | D0010 Meter Readings
| Electronic or other method, as agreed. |
2.1.11.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the AMHHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New AMHHDC | Old AMHHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation – Asset Metering Systems26. |
Email. |
2.1.11.16 | Within 5 WD of 2.1.11.15 | Send final physical Asset Meter reading (if available in Asset Meter)12 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.12.1 | As required | New AMVLP or Supplier appoints a new HHDC and a new AMHHDC | New AMVLP or Supplier
| New HHDC New AMHHDC | D0155 Notification of Meter Operator or Data Collector Appointment and Terms P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.12.2 | If appointment rejected and within 5 WD of 2.1.12.1 | Send notification of rejection of appointment including the reason why the request has been rejected. Where HHDC and AMHHDC required and one of them rejects the appointment the AMVLP or Supplier must resolve the issue and appoint all Asset Metering Agent(s) prior to step 2.1.12.4) (Go to 2.1.12.1 if required) | New HHDC New AMHHDC | New AMVLP or Supplier
| D0261 Rejection of Agent Appointment
| Electronic or other method, as agreed. |
2.1.12.3 | If appointment accepted and within 5 WD of 2.1.12.1 | Send notification of acceptance of appointment. | New HHDC New AMHHDC
| New AMVLP or Supplier
| D0011 Agreement of Contractual Terms
| Electronic or other method, as agreed. |
2.1.12.4 | On appointment of Data Collector(s) and within 5 WD of 2.1.12.3 | Send notification of appointed SVA MOA or AMMOA, HHDC and if applicable AMHHDC; and Asset Meter Registration details P0303 only needs sent to new AMHHDC and HHDC | New AMVLP or Supplier
| New HHDC New AMHHDC SVA MOA or AMMOA | D0148 Notification of Change to Other Parties P0314 Notification of AMHHDC D0302 Notification of Customer Details. P0303 Asset Meter Registration
| Electronic or other method, as agreed. |
2.1.12.5 | Following 2.1.12.4 and upon receipt of Asset Metering System details | Record Asset Metering System details
| New HHDC New AMHHDC |
| Sufficient details of HHDC’s and AMHHDC’s appointment in respect of an Asset Metering System to enable the HHDC and AMHHDC to perform its HHDC and AMHHDC functions. These details shall include the relevant Asset Meter AMSID and the Identifiers for the SVA MOA or AMMOA. The details shall also include the Settlement Days for which the HHDC and AMHHDC are appointed. | Internal Process. |
2.1.12.6 | Within 5 WD of notification of appointment of new HHDC and new AMHHDC | Send Meter Technical Details and details of any current faults. | SVA MOA or AMMOA | New HHDC New AMHHDC New AMVLP or Supplier
| D0002 Fault Resolution Report or Request for Decision on Further Action D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.1.12.7 | On appointment of new AMVLP or Supplier, new HHDC and new AMHHDC | Send notification of termination of appointment for Asset Metering System. | Old AMVLP Supplier
| Old HHDC Old AMHHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by the Registrant of the Asset Metering System (Supplier or AMVLP). | Electronic or other method, as agreed. |
2.1.12.8 | Within 10 WD after end of old HHDC and old AMHHDC appointment to old AMVLP or Supplier. | Complete data collection activities for the old AMVLP or Supplier. | Old HHDC Old AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.12.9 | In accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | New HHDC New AMHHDC | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.12.10 | Where appropriate, from new HHDC and AMHHDC appointment start date | Collect Asset Metered Data including an initial Asset Meter reading. | New HHDC New AMHHDC |
| Refer to Section 2.3.1 or 2.3.2 as applicable | Internal Process |
2.1.12.11 | Before Final Reconciliation Volume Allocation Run27 | Request 14 months of historic Asset Metered Data | New AMHHDC | Old AMHHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.12.12 | Within 5 WD of request in 2.1.12.11 | Send historic Asset Metered Data as available | Old AMHHDC | New AMHHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.12.13 | As required | Request final Asset Meter reading | New AMHHDC | Old AMHHDC | D0005 Instruction on Action
| Electronic or other method, as agreed. |
2.1.12.14 | Within 5 WD of 2.1.12.13 | Send final Asset Meter reading (if available in Asset Meter)28 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
2.1.12.15 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the AMHHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | New AMHHDC | Old AMHHDC | This reading is required for use in the Meter Advance Reconciliation process – Appendix 3.8 - Meter Advance Reconciliation29. |
|
2.1.12.16 | Within 5 WD of 2.1.12.15 | Send final physical Asset Meter reading (if available in Asset Meter)21 | Old AMHHDC | New AMHHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.13.1 | As required on de-appointment of AMHHDC | Send notification of termination of appointment for Asset Metering System. | AMVLP or Supplier
| AMHHDC | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by AMVLP rather than Supplier | Electronic or other method, as agreed. |
2.1.13.2 | Within 10 WD after end of AMHHDC appointment to AMVLP or Supplier. | Complete data collection activities for the AMVLP or Supplier. | HHDC AMHHDC |
| Refer to Section 2.3.2 | Internal Process |
2.1.13.3 | On de-appointment of AMHHDC and within 5 WD of 2.1.13.1 | Send notification of AMHHDC de-appointment to HHDC | AMVLP or Supplier
| HHDC | P0314 Notification of AMHHDC | Electronic or other method, as agreed. |
2.1.13.4 | In accordance with timescales in Appendix 3.6.5 | Prove Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | HHDC | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
2.1.13.5 | Where appropriate, from AMHHDC de-appointment date | Collect Asset Metered Data including an initial Asset Meter reading. | HHDC |
| Refer to Section 2.3.1 | Internal Process |
2.1.13.6 | Before Final Reconciliation Volume Allocation Run30 | Request 14 months of historic Asset Metered Data | AMHHDC | HHDC | D0170 Request for Metering System Related Details | Electronic or other method, as agreed. |
2.1.13.7 | Within 5 WD of request in 2.1.13.6 | Send historic Asset Metered Data as available | AMHHDC | HHDC | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix | Electronic or other method, as agreed. |
2.1.13.8 | As required | Request final Asset Meter reading | HHDC | AMHHDC | D0005 Instruction on Action | Electronic or other method, as agreed. |
2.1.13.9 | Within 5 WD of 2.1.13.8 | Send final Asset Meter reading (if available in Asset Meter)31
| AMHHDC | HHDC | D0010 Meter Readings
| Electronic or other method, as agreed. |
2.1.13.10 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the HHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by AMVLP or Supplier. | Request final physical Asset Meter reading | HHDC | AMHHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 3.8 - Meter Advance Reconciliation – Asset Metering Systems32. |
Email. |
2.1.13.11 | Within 5 WD of 2.1.13.10 | Send final physical Asset Meter reading (if available in Asset Meter)12 | AMHHDC | HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.1.1 | As required | Send request to energise Asset Metering System | AMVLP or Supplier
| SVA MOA or AMMOA | D0134 Request to Change Energisation Status
| Electronic or other method, as agreed. |
2.2.1.2 | If request rejected and within 2 WD of 2.2.1.1 | Send notification of rejection including the reason why the request has been rejected. (Go to 2.2.1.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| D0139 Confirmation or Rejection of Energisation Status Change or D0221 Notification of Failure to Install or Energise Metering System or P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.1.3 | On the date requested or agreed in 2.2.1.1 | Energise Asset Metering System and note initial Asset Meter register reading (If available). | SVA MOA or AMMOA |
|
| Internal Process |
2.2.1.4 | Within 5 WD of attempting to change energisation status OR Following the SVA MOA / AMMOA becoming aware of a discrepancy between the energisation status on site and that held by the AMVLP Supplier / HHDC / AMHHDC. | Send change of energisation status and the initial Asset Meter register reading (if available). | SVA MOA or AMMOA
| AMVLP or Supplier
HHDC and AMHHDC (if applicable) | D0139 Confirmation or Rejection of Energisation Status Change D0010 Meter Readings
| Electronic or other method, as agreed. |
2.2.1.5 | Following receipt of notification in 2.2.1.4 | Record notification by SVA MOA or AMMOA of Asset Metering Systems which have been energised, and the date on which they were energised. | HHDC AMHHDC |
| Details of Asset Metering Systems which have been energised and the dates on which they were energised. | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.2.1 | As required and at least 10 WD before 2.2.2.6 | Send request to de-energise Asset Metering System | AMVLP or Supplier
| SVA MOA or AMMOA | D0134 Request to Change Energisation Status
| Electronic or other method, as agreed. |
2.2.2.2 | If request rejected and within 2 WD of 2.2.2.1 | Send notification of rejection including the reason why the request has been rejected. (Go to 2.2.2.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| D0139 Confirmation or Rejection of Energisation Status Change or D0221 Notification of Failure to Install or Energise Metering System or P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.2.3 | If request accepted and within 3 WD of 2.2.2.1 and before planned date for de-energisation. | Arrange with HHDC or AMHHDC (if applicable) to collect final Metered Data from Asset Meter. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0005 Instruction on Action Date and time of Settlement Periods to be collected | Electronic or other method, as agreed. |
2.2.2.4 | On the date and time agreed in 2.2.2.3 | Collect final Metered Data from Asset Meter. | HHDC or AMHHDC (if applicable) |
|
| Internal Process |
2.2.2.5 | Immediately following 2.2.2.4 | Confirm final Metered Data from Asset Meter collected. | HHDC or AMHHDC (if applicable) | SVA MOA or AMMOA | The MOA will telephone the HHDC/AMHHDC when the MOA is on site.
Following the HHDC/AMHHDC collecting the data, the HHDC/AMHHDC will provide confirmation to the SVA MOA.
Where telephone communication is not possible33 another agreed method may be used.
| Telephone or Electronic or other method, as agreed. |
2.2.2.6 | Immediately following 2.2.2.5 | Note final Asset Meter register reading (if available). If final Metered Data from Asset Meter was not collected in 2.2.2.4, download Metered Data from the Asset Meter, if available. De-energise Asset Metering System | SVA MOA or AMMOA |
|
| Internal Process |
2.2.2.7 | Within 5 WD of attempting to change energisation status OR Following the SVA MOA becoming aware of a discrepancy between the energisation status on site and that held by the AMVLP/Supplier/HHDC. | Send change of energisation status and the final Asset Meter register reading (if available). | SVA MOA or AMMOA | AMVLP or Supplier
HHDC and AMHHDC (if applicable) | D0139 Confirmation or Rejection of Energisation Status Change D0010 Meter Readings
| Electronic or other method, as agreed. |
2.2.2.8 | Following receipt of notification in 2.2.2.7 | Record notification by SVA MOA or AMMOA of Asset Metering Systems, which have been de-energised and the date on which they were de-energised. | HHDC AMHHDC |
| Details of Asset Metering Systems which have been de-energised, and the dates on which they were de-energised. | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.3.1 | As required | Send request to remove an Asset Metering System | AMVLP or Supplier
| SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters
| Electronic or other method, as agreed. |
2.2.3.2 | If request rejected and within 2 WD of 2.2.3.1 | Send notification of rejection including the reason why the request has been rejected.
(Go to 2.2.3.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.3.3 | If request accepted and within 3 WD of request and before data collection date or as the SVA MOA/AMMOA sees necessary. | Arrange with HHDC or AMHHDC (if applicable) to collect final Metered Data from Asset Meter. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0005 Instruction on Action Date and time of Settlement Periods to be collected | Electronic or other method, as agreed. |
2.2.3.4 | On date and time agreed in 2.2.3.3 | Collect final Metered Data from Asset Meter. | HHDC or AMHHDC (if applicable) |
|
| Internal Process |
2.2.3.5 | Following 2.2.3.4 | Confirm final Metered Data from Asset Meter collected. | HHDC or AMHHDC (if applicable) | SVA MOA or AMMOA | The MOA will telephone the HHDC/AMHHDC when the MOA is on site.
Following the HHDC/AMHHDC collecting the data, the HHDC/AMHHDC will provide confirmation to the SVA MOA or AMMOA.
Where telephone communication is not possible34 another agreed method may be used.
| Telephone or Electronic or other method, as agreed. |
2.2.3.6 | Following 2.2.3.5 | Note final Asset Meter register reading, if available.
If final Metered Data from Asset Meter was not collected in 2.2.3.4, download Metered Data from the Asset Meter, if available.
Remove Asset Metering System. | SVA MOA or AMMOA |
|
| Internal Process |
2.2.3.7 | Within 5 WD of the removal of the Asset Metering System or within 2 WD of 2.2.3.10 (as applicable) | Send final Asset Meter register reading for removed Asset Metering System or notification that Asset Meter register reading not obtainable.
Send Meter Technical Details and notification that the Asset Metering System has been removed. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) AMVLP or Supplier
| D0010 Meter Readings or D0002 Fault Resolution Report or Request for Decision on Further Action and D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.2.3.8 | At same time as 2.2.3.7 | Send the relevant Asset Meter information. | AMVLP or Supplier | SVAA | P0303 Asset Meter Registration | Electronic or other method, as agreed. |
2.2.3.9 | Immediately following 2.2.3.8 or 2.2.3.10 | Perform validation checks and send response
If response is “Accepted”, proceed to 2.2.3.11, otherwise proceed to 2.2.3.10. | SVAA | AMVLP or Supplier
| P0304 Rejection of Asset Meter Registration Or P0305 Confirmation of Asset Meter Registration | Electronic or other method, as agreed. |
2.2.3.10 | Within 5 WD of 2.2.3.9 | Where the rejection is of a type the AMVLP or Supplier can resolve without involving other industry parties, send a corrected flow. Proceed to 2.2.3.9
If the AMVLP or Supplier needs to involve other industry parties to resolve the issue, then reasonable endeavours should apply. Notify SVA MOA or AMMOA of rejection reasons and request new D0268. Proceed to 2.2.3.7 | AMVLP or Supplier
AMVLP or Supplier
| SVAA
SVA MOA or AMMOA | P0303 Asset Meter Registration
P0304 Rejection of Asset Meter Registration | Electronic or other method, as agreed.
Electronic or other method, as agreed.
|
2.2.3.11 | On confirmation from SVAA of disconnection | Send end date for Asset Metering System | AMVLP or Supplier
| HHDC AMHHDC (if applicable) | D0151 Termination of Appointment or Contract by Supplier In this instance this is Termination of Appointment or Contract by AMVLP rather than Supplier | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.4.1 | As required | Send request to reconfigure or replace Asset Metering System | AMVLP or Supplier
| SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters | Electronic or other method, as agreed. |
2.2.4.2 | If request rejected and within 2 WD of 2.2.4.1 | Send notification of rejection including the reason why the request has been rejected.
(Go to 2.2.4.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.4.3 | If request accepted and within 3 WD of request and before data collection date or as the SVA MOA/AMMOA sees necessary. | Arrange with HHDC or AMHHDC (if applicable) to collect final Metered Data from Asset Meter. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0005 Instruction on Action Date and time of Settlement Periods to be collected | Electronic or other method, as agreed. |
2.2.4.4 | On date and time agreed in 2.2.4.3 | Collect final Metered Data from Asset Meter. | HHDC or AMHHDC (if applicable) |
|
| Internal Process |
2.2.4.5 | Following 2.2.4.4 | Confirm final Metered Data from Asset Meter collection. | HHDC or AMHHDC (if applicable) | SVA MOA or AMMOA | The MOA will telephone the HHDC/AMHHDC when the MOA is on site.
Following the HHDC/AMHHDC collecting the data, the HHDC/AMHHDC will provide confirmation to the SVA MOA or AMMOA.
Where telephone communication is not possible35 another agreed method may be used. | Telephone or Electronic or other method, as agreed. |
2.2.4.6 | Following 2.2.4.5 | Note final Asset Meter register reading, if available.
If final Metered Data from Asset Meter was not uploaded by the HHDC/AMHHDC, download final HH Metered Data, if available.
Reconfigure Asset Metering System or replace and energise Asset Metering System36,37.
Note initial Asset Meter register reading. | SVA MOA or AMMOA |
|
| Internal Process |
2.2.4.7 | Within 5 WD of the replacement / reconfiguration of the Asset Metering System or within 2 WD of 2.2.4.10 (as applicable) | Send final Asset Meter register reading for replaced / reconfigured Asset Metering System or notification that Asset Meter register reading not obtainable.
Send initial Asset Meter register reading for replacement Asset Metering System / new configuration.
Send Meter Technical Details for replacement Asset Metering System / new configuration.
| SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) AMVLP or Supplier
| D0010 Meter Readings or D0002 Fault Resolution Report or Request for Decision on Further Action and D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.2.4.8 | Following 2.2.4.7 | Send the relevant Asset Meter information. | AMVLP or Supplier
| SVAA
| P0303 ‘Asset Meter Registration
| Electronic or other method, as agreed. |
2.2.4.9 | Immediately following 2.2.4.8 or 2.2.4.10 | Perform validation checks and send response
If response is “Accepted”, proceed to 2.2.4.11, otherwise proceed to 2.2.4.10. | SVAA | AMVLP or Supplier
| P0304 Rejection of Asset Meter Registration
Or P0305 Confirmation of Asset Meter Registration | Electronic or other method, as agreed. |
2.2.4.10 | Within 5 WD of 2.2.4.9 | Where the rejection is of a type the AMVLP or Supplier can resolve without involving other industry parties, send a corrected flow. Proceed to 2.2.4.9
If the AMVLP or Supplier needs to involve other industry parties to resolve the issue, then reasonable endeavours should apply. Notify SVA MOA or AMMOA of rejection reasons and request new D0268. Proceed to 2.2.4.7 | AMVLP or Supplier
AMVLP or Supplier
| SVAA
SVA MOA or AMMOA | P0303 Asset Meter Registration
P0304 Rejection of Asset Meter Registration | Electronic or other method, as agreed.
Electronic or other method, as agreed.
|
2.2.4.11 | After planned date for replacement / reconfiguration of the Asset Metering System | Collect Asset Metered Data for replacement Asset Metering System / new configuration | HHDC or AMHHDC |
| Refer to 2.3.1 or 2.3.2 as applicable | Internal Process |
2.2.4.12 | In accordance with timescales in Appendix 3.6.5 | Carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | SVA MOA or AMMOA | HHDC and AMHHDC (if applicable) | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.5.1 | As required | Send request to change the status of an Asset feeder of an Asset | AMVLP or Supplier
| SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters | Electronic or other method, as agreed. |
2.2.5.2 | If request rejected and within 2 WD of 2.2.5.1 | Send notification of rejection including the reason why the request has been rejected.
(Go to 2.2.5.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.5.3 | On date requested or agreed in 2.2.5.1 or as the SVA MOA/AMMOA sees necessary | Change Asset feeder status. Note Asset Meter register reading (if available). | SVA MOA or AMMOA |
|
| Internal Process |
2.2.5.4 | Within 5 WD of change to Asset feeder status | If available, send Asset Meter register reading.
Send Meter Technical Details | SVA MOA or AMMOA | AMVLP or Supplier
HHDC and AMHHDC (if applicable)
| D0010 Meter Readings D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.2.5.5 | Following 2.2.5.4 and in accordance with timescales in Appendix 3.6.5 | If feeder for the Asset has been energised for the first time carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven | SVA MOA or AMMOA | HHDC and AMHHDC (if applicable) | Refer to Appendix 3.6 | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.2.6.1 | As required | Send request to change the status of an Asset feeder of an Asset | AMVLP or Supplier
| SVA MOA or AMMOA | D0142 Request for Installation or Change to a Metering System Functionality or the Removal of All Meters | Electronic or other method, as agreed. |
2.2.6.2 | If request rejected and within 2 WD of 2.2.6.1 | Send notification of rejection including the reason why the request has been rejected.
(Go to 2.2.6.1 if required) | SVA MOA or AMMOA | AMVLP or Supplier
| P0211 Site Visit Rejection | Electronic or other method, as agreed. |
2.2.6.3 | If request accepted and within 3 WD of request and before data collection date or as the SVA MOA/AMMOA sees necessary. | Arrange with HHDC or AMHHDC (if applicable) to collect final Metered Data from Asset Meter. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0005 Instruction on Action Date and time of Settlement Periods to be collected | Electronic or other method, as agreed. |
2.2.6.4 | On date and time agreed in 2.2.6.3 | Collect final Metered Data from Asset Meter. | HHDC or AMHHDC (if applicable) |
|
| Internal Process |
2.2.6.5 | Following 2.2.6.4 | Confirm final Metered Data from Asset Meter collection. | HHDC or AMHHDC (if applicable) | SVA MOA or AMMOA | The SVA MOA or AMMOA will telephone the HHDC/AMHHDC when the SVA MOA or AMMOA is on site.
Following the HHDC/AMHHDC collecting the data, the HHDC/AMHHDC will provide confirmation to the SVA MOA or AMMOA.
Where telephone communication is not possible38 another agreed method may be used.
| Telephone or Electronic or other method, as agreed. |
2.2.6.6 | Following 2.2.6.5 | Note final Asset Meter register reading, if available.
If final Metered Data from Asset Meter was not uploaded by the HHDC/AMHHDC, download final HH Metered Data, if available.
Change Asset feeder status | SVA MOA or AMMOA |
|
| Internal Process |
2.2.6.7 | Within 5 WD of changing Asset feeder status in 2.2.6.6 | If available, send Asset Meter register reading.
Send Meter Technical Details. | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) AMVLP or Supplier
| D0010 Meter Readings D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.3.1.1 | As required | Collect and validate Half Hourly Metered Data from an Asset Metering System. Data from the Asset Meter shall be retrieved as soon as possible before historical data is overwritten. This can be data in other formats where it can be converted to Half Hourly Metered Data by the HHDC. | HHDC |
| Refer to Appendix 3.1, Appendix 3.2, Appendix 3.3, and where relevant Appendix 3.8. | Internal Process |
2.3.1.2 | Following 2.3.1.1 and in accordance with timescales in Appendix 3.1 and 3.8 | Provide relevant reports | HHDC | AMVLP or Supplier
SVA MOA or AMMOA | Refer to Appendix 3.1 and where relevant Appendix 3.8. D0008 Meter Advance Reconciliation Report in accordance with Appendix 3.8 | Electronic or other method, as agreed. |
2.3.1.3 | When fault suspected with metering or communications equipment. | Investigate and report any faults detected. | HHDC |
| Refer to Section 2.3.3 | Internal Process |
2.3.1.4 | Within 2 WD of detecting consumption on de-energised metering or if maximum permissible energy exceeds that allowed. | Report any consumption detected on de-energised metering and escalate any occurrences where the energy recorded, for any Settlement Period, exceeds the maximum permissible on energised metering. | HHDC. | AMVLP or Supplier SVA MOA or AMMOA | Refer to Appendix 3.1 D0001 Request Metering System Investigation.
| Internal Process. Electronic or other method, as agreed. |
2.3.1.5 | When maximum permissible energy exceeds that allowed. | Send notification of action to be taken. | AMVLP or Supplier . | HHDC. | D0005 Instruction on Action. The HHDC will be instructed to validate the actual data or to replace the actual data with estimated successfully validated data. | Electronic or other method, as agreed. |
2.3.1.6 | Following 2.3.1.5. | Undertake action requested by AMVLP or Supplier or if no response provided by AMVLP or Supplier apply the rules defined in Appendix 3.1. | HHDC. |
|
| Internal Process. |
2.3.1.7 | If no response received from AMVLP or Supplier and following 2.3.1.6. | Report any occurrences where estimated consumption data used because energy recorded exceeds that allowed and AMVLP or Supplier has not provided an appropriate course of action. | HHDC. | BSCCo. | P0208 Estimation Due To High Energy Recorded. | Manual. |
2.3.1.8 | Where required. | Provide operational data or additional information where the exceptions identified in Appendix 3.2 are met. | AMVLP or Supplier. | HHDC. | In accordance with Appendix 3.2. | Electronic or other method, as agreed. |
2.3.1.9 | When data is invalid or cannot be retrieved or if requested by AMVLP or Supplier to estimate consumption or if energy exceeds that allowed by more than the limit defined in 2.3.1.4. | Estimate consumption data. Send estimated consumption data report. | HHDC. | AMVLP or Supplier
| Refer to Appendix 3.2. D0022 Estimated Half Hourly Data Report.
| Internal Process. Electronic or other method, as agreed. |
2.3.1.10 | Prior to next Volume Allocation Run | Validate consumption data for estimated data and actual data where not done in 2.3.1.1.
Send valid consumption data39 | HHDC
HHDC |
SVAA AMVLP or Supplier
| Refer to Appendix 3.1.
D0390 ‘Asset Metering System Half Hourly Metered Data’40 | Internal Process
Electronic or other method, as agreed. |
2.3.1.11 | 2WDs Before invoking run | Where available: Load and validate incoming HHDC files.
If D0390 file expected but not received or if estimated data41 has been received, ask HHDC to send file with actual data. OR If file fails any validation check for reasons other than standing data mismatch, ask HHDC to assess if file is valid. | SVAA
SVAA
SVAA |
HHDC AMVLP or Supplier
HHDC |
P0310 Missing Metering System Data
P0311 Invalid Metering System Data
| Internal Process
Electronic or other method, as agreed.
Electronic or other method, as agreed |
2.3.1.12 | Within 2 working hours of notification received from SVAA. | If file is valid, notify the SVAA via a BSC Service Desk call; or Send corrected file to SVAA. Where corrected file sent to SVAA also send to AMVLP or Supplier.. |
HHDC |
SVAA AMVLP or Supplier |
D0390 ‘Asset Metering System Half Hourly Metered Data’ |
Electronic or other method, as agreed. |
2.3.1.13 | On receipt of a corrected file up until the Volume Allocation Run is invoked | Re-load and validate HHDC file | SVAA |
|
| Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.3.2.1 | As required | Collect and validate Half Hourly Metered Data from an Asset Metering System. Data from the Asset Meter shall be retrieved as soon as possible before historical data is overwritten. This can be data in other formats where it can be converted to Half Hourly Metered Data by the AMHHDC. | AMHHDC |
| Refer to Appendix 3.1, Appendix 3.2, Appendix 3.3, and where relevant Appendix 3.8. | Internal Process |
2.3.2.2 | Following 2.3.2.1 and in accordance with timescales in Appendix 3.1 and 3.8 | Provide relevant reports | AMHHDC | AMVLP or Supplier SVA MOA or AMMOA | Refer to Appendix 3.1 and where relevant Appendix 3.8. D0008 Meter Advance Reconciliation Report in accordance with Appendix 3.8 | Electronic or other method, as agreed. |
2.3.2.3 | When fault suspected with metering or communications equipment. | Investigate and report any faults detected. | AMHHDC |
| Refer to Section 2.3.3 | Internal Process |
2.3.2.4 | Within 2 WD of detecting consumption on de-energised metering or if maximum permissible energy exceeds that allowed. | Report any consumption detected on de-energised metering and escalate any occurrences where the energy recorded, for any Settlement Period, exceeds the maximum permissible on energised metering. | AMHHDC. | AMVLP or Supplier
SVA MOA or AMMOA | Refer to Appendix 3.1 D0001 Request Metering System Investigation.
| Internal Process. Electronic or other method, as agreed. |
2.3.2.5 | When maximum permissible energy exceeds that allowed. | Send notification of action to be taken. | AMVLP. or Supplier
| AMHHDC. | D0005 Instruction on Action. The AMHHDC will be instructed to validate the actual data or to replace the actual data with estimated successfully validated data. | Electronic or other method, as agreed. |
2.3.2.6 | Following 2.3.2.5. | Undertake action requested by AMVLP or Supplier or if no response provided by AMVLP or Supplier apply the rules defined in Appendix 3.1. | AMHHDC. |
|
| Internal Process. |
2.3.2.7 | If no response received from AMVLP or Supplier and following 2.3.2.6. | Report any occurrences where estimated consumption data used because energy recorded exceeds that allowed and AMVLP or Supplier has not provided an appropriate course of action. | AMHHDC. | BSCCo. | P0208 Estimation Due To High Energy Recorded. | Manual. |
2.3.2.8 | Where required. | Provide operational data or additional information where the exceptions identified in Appendix 4.2A are met. | AMVLP or Supplier. | AMHHDC. | In accordance with Appendix 3.2. | Electronic or other method, as agreed. |
2.3.2.9 | When data is invalid or cannot be retrieved or if requested by AMVLP or Supplier to estimate consumption or if energy exceeds that allowed by more than the limit defined in 2.3.2.4. | Estimate consumption data. Send estimated consumption data report. | AMHHDC. | AMVLP or Supplier
| Refer to Appendix 3.2. D0022 Estimated Half Hourly Data Report.
| Internal Process. Electronic or other method, as agreed. |
2.3.2.10 | 3WD prior to next Volume Allocation Run | Validate consumption data for estimated data and actual data where not done in 2.3.2.1
Send valid consumption data42
Where issue with data suspected and data estimated notify HHDC of the nature of the issue | AMHHDC
AMHHDC |
HHDC | Refer to Appendix 3.1
D0390 ‘Asset Metering System Half Hourly Metered Data’ P0313 Consumption Data Issue Notification | Internal Process
Electronic or other method, as agreed. |
2.3.2.11 | Following 2.3.2.10 | If D0390 file expected but not received or if estimated data43 has been received, ask AMHHDC to send file with actual data | HHDC | AMHHDC | P0310 Missing Metering System Data
| Electronic or other method, as agreed. |
2.3.2.12 | Within 2 working hours of notification received from HHDC. | Where possible send valid consumption data
Where P0313 has not been sent in 2.3.2.10 where issue with data suspected and data estimated notify HHDC of the nature of the issue | AMHHDC | HHDC | D0390 ‘Asset Metering System Half Hourly Metered Data’ P0313 Consumption Data Issue Notification | Electronic or other method, as agreed |
2.3.2.13 | Prior to next Volume Allocation Run | Send valid consumption data44
| HHDC | SVAA AMVLP or Supplier | D0390 ‘Asset Metering System Half Hourly Metered Data’45 | Electronic or other method, as agreed. |
2.3.2.14 | 2WDs Before invoking run | Where available: Load and validate incoming HHDC files.
If D0390 file expected but not received or if estimated data46 has been received, ask HHDC to send file with actual data. OR If file fails any validation check for reasons other than standing data mismatch, ask HHDC to assess if file is valid. | SVAA
SVAA
SVAA |
HHDC AMVLP or Supplier
HHDC AMVLP |
P0310 Missing Metering System Data
P0311 Invalid Metering System Data
| Internal Process
Electronic or other method, as agreed.
Electronic or other method, as agreed |
2.3.2.15 | Within 2 working hours of notification received from SVAA. | If file is valid, notify the SVAA via a BSC Service Desk call. Where the fault is continuous the HHDC is only required to raise one BSC Service Desk call and not one for each day or for each impacted Settlement Run; or Send corrected file to SVAA. Where corrected file sent to SVAA also send to AMVLP or Supplier. |
HHDC |
SVAA AMVLP or Supplier |
D0390 ‘Asset Metering System Half Hourly Metered Data’ |
Electronic or other method, as agreed. |
2.3.2.16 | On receipt of a corrected file up until the Volume Allocation Run is invoked | Re-load and validate HHDC file | SVAA |
|
| Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.3.3.1 | As required | Send notification of inconsistencies. | Any Participant | AMVLP or Supplier | Details of inconsistencies (e.g. invalid data, faulty metering, invalid Meter Technical Details etc.). P0316 Details of Asset Metering Fault | Electronic or other method, as agreed. |
2.3.3.2 | Within 2 WD of 2.3.3.1 (if applicable), or as required | Send notification of inconsistencies and request investigation. | AMVLP or Supplier | HHDC AMHHDC (as applicable) | D0001 Request Metering System Investigation
| Electronic or other method, as agreed. |
2.3.3.3 | Within 5 WD of 2.3.3.2 | Investigate inconsistencies. Take corrective action if possible. Go to 2.3.3.4 if an Asset Metering System investigation is required OR Go to 2.3.3.5 if inconsistencies have been resolved and an Asset Metering System investigation was not required OR Go to 2.3.3.10 if inconsistencies remain unresolved and an Asset Metering System investigation was not required. | HHDC AMHHDC (as applicable) |
|
| Internal Process |
2.3.3.4 | Following 2.3.3.3 | Initiate process in Section 2.4 | HHDC AMHHDC (as applicable) |
|
|
|
2.3.3.5 | Within 5 WD of resolution of inconsistencies | Report resolution of inconsistencies. | HHDC or AMHHDC | AMVLP or Supplier
| D0002 Fault Resolution Report or Request for Decision on Further Action
| Electronic or other method, as agreed. |
2.3.3.6 | Within 5 WD of 2.3.3.5 | Report resolution of inconsistencies. | AMVLP or Supplier | Relevant Participant | D0002 Fault Resolution Report or Request for Decision on Further Action
| Electronic or other method, as agreed. |
2.3.3.7 | If appropriate, following 2.3.3.5 | If a problem has caused incorrect consumption to be recorded correct consumption data. If AMHHDC collects data continue to 2.3.3.8 or If HHDC collects data directly continue to 2.3.3.9 | HHDC AMHHDC (as applicable) |
| Refer to Appendix 3.2 | Internal Process |
2.3.3.8 | As soon as possible following 2.3.3.7 | Send corrected data
As required where data estimated, send estimated consumption data report | AMHHDC
AMHHDC | HHDC
AMVLP or Supplier | D0390 ‘Asset Metering System Half Hourly Metered Data’
D0022 Estimated Half Hourly Data Report.
| Electronic or other method, as agreed.
Electronic or other method, as agreed.
|
2.3.3.9 | As soon as possible following 2.3.3.7 or 2.3.3.8 as applicable | Send corrected data
As required where data estimated, and where HHDC communicates directly with Asset Meter directly send estimated consumption data report.
| HHDC
HHDC | SVAA AMVLP or Supplier
AMVLP or Supplier | D0390 ‘Asset Metering System Half Hourly Metered Data’
D0022 Estimated Half Hourly Data Report.
| Electronic or other method, as agreed.
Electronic or other method, as agreed. |
2.3.3.10 | Following 2.3.3.3 and as soon as possible, if inconsistencies remain unresolved but an Asset Metering System investigation was not required. | Report action required | HHDC or AMHHDC | AMVLP or Supplier
| AMSID; Details of Action Required; P0317 Report Action Required | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.4.1.1 | As required | Send request to investigate an Asset Metering System | Any Participant47 | AMVLP or Supplier
| Details of fault P0316 Details of Asset Metering Fault
| Electronic or other method, as agreed. |
2.4.1.2 | Within 2 WD of 2.4.1.1 or as required | Send request to investigate an Asset Metering System | AMVLP or Supplier
HHDC or AMHHDC (if applicable)48 | SVA MOA or AMMOA
| D0001 Request Metering System Investigation
| Electronic or other method, as agreed. |
2.4.1.3 | Within 5 WD of 2.4.1.2 | Investigate Asset Metering System. Attempt to resolve fault.
| SVA MOA or AMMOA |
|
| Internal Process |
2.4.1.4 | As required following 2.4.1.3 | If the resolution involves a site visit, take a register reading of the Asset Meter (if possible). Following resolution of the fault. | SVA MOA or AMMOA | HHDC or AMHHDC | D0010 Meter Readings
| Electronic or other method, as agreed. |
2.4.1.5 | If fault resolved within 5 WD of receipt of notification in 2.4.1.2 | Go to 2.4.1.13 Note nature of fault | SVA MOA or AMMOA |
|
|
|
2.4.1.6 | If fault remains unresolved 5 WD after receipt of notification in 2.4.1.2 | Send notification that the fault cannot be resolved within 5WD, and send a corresponding fault resolution plan (if required) detailing the actions that need to be taken to resolve the fault and the proposed timescales or update on proposed next steps. Request decision on further action if appropriate49.
| SVA MOA or AMMOA | HHDC or AMHHDC or AMVLP or Supplier
(as appropriate) | D0005 Instruction on Action50 Or equivalent communication, by other means, with the AMVLP or Supplier.. Fault resolution plan (if required).
| Electronic or other method, as agreed. |
2.4.1.7 | As soon as possible after 2.4.1.6, if appropriate | Send decision on further action | HHDC or AMHHDC or AMVLP or Supplier (as appropriate)
| SVA MOA or AMMOA
| D0005 Instruction on Action Or equivalent communication, by other means, with the AMVLP or Supplier. | Electronic or other method, as agreed. |
2.4.1.8 | Following 2.4.1.6 or 2.4.1.7, as applicable | Attempt to resolve fault | SVA MOA or AMMOA |
|
| Internal Process |
2.4.1.9 | If fault resolved within 15WD of receipt of notification in 2.4.1.2 | Go to 2.4.1.13 | SVA MOA or AMMOA |
|
| Internal Process |
2.4.1.10 | If fault remains unresolved 15WD after receipt of notification in 2.4.1.2 | Notify that the fault remains unresolved | SVA MOA or AMMOA | HHDC or AMHHDC or AMVLP or Supplier (as appropriate) | D0005 Instruction on Action Or equivalent communication, by other means, with the AMVLP or Supplier. | Electronic or other method, as agreed. |
2.4.1.11 | As soon as possible following 2.4.1.10 | Progress resolution of outstanding fault | SVA MOA or AMMOA |
| As appropriate: D0005 Instruction on Action Fault resolution plan | Internal Process |
2.4.1.12 | If and when appropriate following 2.4.1.11 | Consult and / or update HHDC or AMHHDC, or AMVLP or Supplier as appropriate, regarding investigation on regular basis (as agreed) until fault resolved. | SVA MOA or AMMOA | HHDC or AMHHDC or AMVLP or Supplier (as appropriate) | D0005 Instruction on Action Or equivalent communication, by other means, with the AMVLP or Supplier. | Electronic or other method, as agreed. |
2.4.1.13 | Within 5 WD of resolving fault | Send fault resolution report and undertake any steps in Section 2.2.4 which may be appropriate. | SVA MOA or AMMOA | AMVLP or Supplier
HHDC or AMHHDC | D0002 Fault Resolution Report or Request for Decision on Further Action
| Electronic or other method, as agreed. |
2.4.1.14 | Within 5 WD of 2.4.1.13 | Report resolution of fault | AMVLP or Supplier
| Relevant Participant (instigator in 2.4.1.1) | D0002 Fault Resolution Report or Request for Decision on Further Action Details of resolution | Electronic or other method, as agreed. |
2.4.1.15 | If appropriate, at the same time as 2.4.1.13 | Send Meter Technical Details if changed or corrected | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) AMVLP or Supplier
| D0268 Half Hourly Meter Technical Details If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.4.1.16 | If appropriate and within 10 WD of resolving fault | Send the relevant Asset Meter information. | AMVLP or Supplier
| SVAA
| P0303 Asset Meter Registration | Electronic or other method, as agreed. |
2.4.1.17 | Immediately following 2.4.1.16 or 2.4.1.18 | Perform validation checks and send response
If response is “Accepted”, proceed to 2.4.1.19, otherwise proceed to 2.4.1.17. | SVAA | AMVLP or Supplier
| P0304 Rejection of Asset Meter Registration Or P0305 Confirmation of Asset Meter Registration | Electronic or other method, as agreed. |
2.4.1.18 | Within 5 WD of 2.4.1.17 | Where the rejection is of a type the AMVLP or Supplier can resolve without involving other industry parties, send a corrected flow. Proceed to 2.4.1.17
If the AMVLP or Supplier needs to involve other industry parties to resolve the issue, then reasonable endeavours should apply. Notify SVA MOA or AMMOA of rejection reasons and request new D0268. Proceed to 2.4.1.15 | AMVLP or Supplier
AMVLP or Supplier
| SVAA
SVA MOA or AMMOA | P0303 Asset Meter Registration
P0304 Rejection of Asset Meter Registration | Electronic or other method, as agreed.
Electronic or other method, as agreed.
|
2.4.1.19 | In accordance with timescales in Appendix 3.6.5 | Carry out a Proving Test on the Asset Metering System in accordance with Section 2.5, Appendix 3.6 and Code of Practice Eleven. | SVA MOA or AMMOA | HHDC AMHHDC (if applicable) | Refer to Appendix 3.6 | Internal Process |
2.4.1.20 | If appropriate, following 2.4.1.13 | If a problem has caused incorrect consumption to be recorded correct consumption data. If AMHHDC collects data continue to 2.4.1.21 or If HHDC collects data directly continue to 2.4.1.22 | HHDC AMHHDC (if applicable) |
| Refer to Appendix 3.2 | Internal Process |
2.4.1.21 | As soon as possible following 2.4.1.20 | Send corrected data
As required where data estimated, send estimated consumption data report
Continue to 2.4.1.22 | AMHHDC
AMHHDC | HHDC
AMVLP or Supplier | D0390 ‘Asset Metering System Half Hourly Metered Data’
D0022 Estimated Half Hourly Data Report.
| Electronic or other method, as agreed.
Electronic or other method, as agreed. |
2.4.1.22 | As soon as possible following 2.4.1.20 or 2.4.1.22 as applicable | Send corrected data
As required where data estimated, and where HHDC communicates directly with Asset Meter directly send estimated consumption data report.
| HHDC
HHDC | SVAA
AMVLP or Supplier | D0390 ‘Asset Metering System Half Hourly Metered Data’
D0022 Estimated Half Hourly Data Report.
| Electronic or other method, as agreed.
Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.5.1.1 | As required | When Asset Metering System is installed, existing Metering System used as an Asset Metering System, reconfigured or replaced commission to Section 2.1.2 and Code of Practice Eleven, record Asset Meter Technical Details and carry out a Proving Test in accordance with Code of Practice Eleven and Appendix 3.6. (Refer to Appendix 3.6) | SVA MOA or AMMOA |
|
| Internal Process |
2.5.1.2 | Following 2.5.1.1 | Send request for Proving Test (indicating which Settlement Periods to be collected) | SVA MOA or AMMOA | HHDC AMHHDC (if applicable) | D0268 Half Hourly Meter Technical Details D0005 Instruction on Action Date and time of Settlement Periods to be collected; If site is Complex, send Asset Metering Complex Site Supplementary Information Form. Refer to Appendix 3.9 Guide to Asset Metering Complex Sites; | Electronic or other method, as agreed. |
2.5.1.3 | Following 2.5.1.2 | Download Asset Meter for the same Half Hourly Settlement Period as requested by the MOA.
If Asset Meter downloaded directly by HHDC continue to 2.5.1.5 | HHDC or AMHHDC (if applicable) |
| As a minimum the HHDC or AMHHDC shall collect the data required by the SVA MOA or AMMOA, but may also collect and send more data than requested. | Internal Process |
2.5.1.4 | Following 2.5.1.3 | Send raw Half Hourly Metered Data or notification that Metered Data cannot be collected for the Settlement Periods requested48. If unable to collect Metered Data for Settlement Period requested, send alternative Settlement Period Half Hourly Metered Data. | HHDC or AMHHDC (if applicable) | SVA MOA or AMMOA | D0003 Half Hourly Advances OR D0001 Request Metering System Investigation
| Electronic or other method, as agreed. |
2.5.1.5 | Following 2.5.1.4 | If data received from HHDC or AMHHDC (if applicable), proceed to 2.5.1.6 to undertake a comparison and issue the results. If data not received from HHDC or AMHHDC (if applicable) proceed to 2.5.1.2 to undertake a re-test | SVA MOA or AMMOA |
|
| Internal Process |
2.5.1.6 | Following 2.5.1.5 and receipt of data from HHDC or AMHHDC | Compare SVA MOA or AMMOA Half Hourly Metered Data with HHDC or AMHHDC Half Hourly Metered Data for the same Settlement Period. | SVA MOA or AMMOA |
|
| Internal Process |
2.5.1.7 | Following 2.5.1.6 and where Proving Test is successful and in accordance with timescales in Appendix 3.6.5 | Send notification of successful Proving Test | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0214 Confirmation of Proving Tests
| Electronic or other method, as agreed. |
2.5.1.8 | Following 2.5.1.6 and where Proving Test is unsuccessful and in accordance with timescales in Appendix 3.6.5 | Send notification that Proving Test failed | SVA MOA or AMMOA | HHDC or AMHHDC (if applicable) | D0002 Fault Resolution Report or Request for Decision on Further Action
| Electronic or other method, as agreed. |
2.5.1.9 | Following 2.5.1.8 and in accordance with timescales in Appendix 3.6.5 | Investigate problem and take corrective action. | SVA MOA or AMMOA |
|
| Internal Process |
CoP11 Asset Metering Type | Max. kW | Max kWh / Half Hour | Permissible Allowed: kWh per Half Hour |
1 | 675,000 | 337,500 | 400,000 |
2 | 100,000 | 50,000 | 50,000 |
3 | 10,000 | 5,000 | 5,000 |
4 | 1,000 | 500 | 600 |
5 | 100 | 50 | 50 |
use actual consumption data if the energy has exceeded the permissible allowed by no more than 20%; or
use estimated consumption data, rather than the actual consumption data if the energy exceeded the permissible allowed by more than 20%.
1. |
|
2. |
|
3. |
|
4. |
|
for the Initial Volume Allocation the AMHHDC sends data for all Asset Meter periods for all relevant AMSIDs; the data may be actual or estimated.
for subsequent reconciliation(s) the AMHHDC shall send updates only for this data.
for the Initial Volume Allocation the HHDC sends data for all Asset Meter periods for all relevant AMSIDs; the data may be actual or estimated.
for subsequent reconciliation(s) the HHDC shall send updates only for this data.
Data Flag | Description |
A | Actual data (read automatically or manually) |
C | Long day / short day indicator |
E | Estimated data |
Outstation Id;
Asset Meter Id (serial number);
Outstation number of channels;
Measurement Quantity Id;
Asset Meter multiplier;
Pulse multiplier;
CT and / or VT Ratios; and
Access to Asset Metering Equipment at Password level 3.
Following a change of HHDC, or AMHHDC, appointment but only in the event that the MTD was manually intervened;
Following a change of SVA MOA, or AMMOA, appointment but only in the event that the MTD was manually intervened;
Following a concurrent Change of AMVLP or Supplier and HHDC, or AMHHDC, but only in the event that the MTD was manually intervened;
When an Asset Metering System is reconfigured / replaced;
When there is a key field change (refer to Appendix 3.5);
Where there has been a key field change (refer to Appendix 3.5) whilst a site has been de-energised and the Asset Metering System becomes energised; or
Where a feeder is energised for the first time.
Record the HH Metered Data reading while on site; or
Use the Asset Meter manufacturer’s software to download the HH Metered Data; or
Use software which has a relevant protocol approval in accordance with BSCP601 ‘Metering Protocol Approval and Compliance Testing’ to download the HH Metered Data.
CoP11 Asset Metering Type | WDs to Complete Proving Test53 | WDs to Complete Re-Test | Total |
One | 5 | 5 | 10 |
Two | 5 | 5 | 10 |
Three | 10 | 10 | 20 |
Four | 15 | 15 | 30 |
Five | 15 | 15 | 30 |
MAR confirmation;
MAR failure; and
MAR overdue,
System Losses – Where the Asset Meter is subject to a Metering Dispensation and is not located at the Defined Metering at the Asset Point and an electrical loss factor has been applied to account for equipment and cabling between the Actual Metering at the Asset Point and the Defined Metering at the Asset Point; and
Inverter and Rectifier Losses – Where the location of the Asset Meter, where it is Asset Metering Type 5, is in such a place that it does not account for the losses of the inverter or rectifier.
Serial | Sender | Process | Sub-Process | Recipient | Performance Measure | Service Levels | Reporting Method |
AC01 | HHDC or AMHHDC | 2.3 Collection Activities | HH Estimates at RF | SVAA;
or in the case of an AMHHDC the HHDC | Extent of estimated data submitted for Final Reconciliation | 100% of estimated data at RF to be based upon techniques (a) – (e) as described in BSCP502 Section 4.2A | Provision of data under Appendix 3.12 |
AC02 | Old HHDC or Old AMHHDC | 2.1 Registration Activities | HH Read History to New HHDC | New HHDC or New AMHHDC | D0036 issued within timescales | 100% issued within 5WD of request | Provision of data under Appendix 3.12 |
AM11 | SVA MOA or AMMOA | 2.4 Interface to Other Party Agents | Timely Sending of HH Asset Meter MTDs to HHDCs and AMHHDCs | HHDC, AMHHDC
| D0268, transferred within timescales | 100% of D0268s, received by HHDCs and AMHHDCs within 5 WD of the HHDC and AMHHDC EFD | [HHDC/AMHHDC] |
AM12 | SVA MOA or AMMOA | 2.4 Interface to Other Party Agents | Missing HH Asset Meter MTDs | New HHDC, new AMHHDC, current HHDC current AMHHDC, or new SVA MOA or new AMMOA | D0268 transferred within timescales | 100% of D0268s, received by New and current HHDCs or AMHHDCs and New SVA MOAs or AMMOAs within 5 WD of agents EFD following a change of Agent. | [New SVA MOA/AMMOA or HHDC/AMHHDC] |
AM13 | SVA MOA or AMMOA | 2.4 Interface to Other Party Agents | Quality of Asset Meter MTDs | HHDC, AMHHDC | Accurate D0268s, sent | None | [HHDC/AMHHDC] |
AM14 | SVA MOA or AMMOA | 2.4 Interface to Other Party Agents | Timely Asset Meter Investigation Requests | HHDC, AMHHDC | Total number of D0002s, received since Date Fault Suspected/Detected | 100% of D0001 flows, resolved within +15 WD | [HHDC/AMHHDC] |
Version | Date | Description of Change | Changes Included | Mods/Panel/Committee Refs. |
1.0 | 30 June 2022 | June 2022 Standard Release | P375, P433 | P309/06 P332/05 |
2.0 | 02 November 2023 | November 2023 Standard Release | P395 | P340/05 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 References to MOA include both an SVA MOA and an AMMOA.
2 Where a Supplier is the Registrant of an Asset Metering System, it is responsible for these activities.
3 An AMMOA can only be appointed to an Asset Metering Type 4 (“whole current” (direct connected) only) and Asset Metering Type 5 site
4 Asset Metering Types are defined on Code of Practice Eleven
5 This step could be completed in shorter timescales where the AMVLP and SVA MOA or AMMOA, as applicable, have reached mutual agreement.
6 The AMVLP may have to consult the Equipment Owner where they do not own the Measurement Transformers (i.e. Current Transformers and Voltage Transformers) for the required information
7 A defect or omission in the completion of the processes is set out in Code of Practice Eleven and will also include that the Commissioning information has not been received from the Equipment Owner
8 It shall be the responsibility of the Registrant to ensure that all Asset Metering Equipment is appropriately Commissioned. If the Registrant believes that there is a risk to Settlement it shall, where appropriate, consult with the relevant Equipment Owner and agree the appropriate steps to be taken to minimise the risks to Settlement. Such agreements shall also be recorded and made available on request to the BSC Panel.
9 This step could be completed in shorter timescales where the AMVLP and SVA MOA or AMMOA, as applicable, have reached mutual agreement.
10 The AMVLP may have to consult the Equipment Owner where they do not own the Measurement Transformers (i.e. Current Transformers and Voltage Transformers) for the required information in the P0315
11 Note that if there is also a concurrent Change of HHDC or AMHHDC, the New AMVLP shall send the D0148 once the D0011 from both the SVA MOA or AMMOA and the HHDC and if applicable AMHHDC has been received and within 5WD of the receipt of the latter D0011
12 The new HHDC should not send the D0170 flow prior to the HHDC Effective From Date on their D0155 ‘Notification of Meter Operator or Data Collector Appointment and Terms’ flow received from their associated AMVLP
13 If a register reading not available in Asset Meter notify new HHDC
14 This Meter Advance Reconciliation will require historic Asset Metered Data from the old HHDC, and the new HHDC shall therefore ensure that step 2.1.7.11 is carried out in time for this data to be received.
15 The new AMHHDC should not send the D0170 flow prior to the AMHHDC Effective From Date on their P0314 ‘Notification of AMHHDC’ flow received from their associated AMVLP
16 If a register reading not available in Asset Meter notify new AMHHDC
17 This Meter Advance Reconciliation will require historic Asset Metered Data from the old AMHHDC, and the new AMHHDC shall therefore ensure that step 2.1.8.11 is carried out in time for this data to be received.
18 The new AMHHDC should not send the D0170 flow prior to the AMHHDC Effective From Date on their P0314 ‘Notification of AMHHDC’ flow received from their associated AMVLP
19 If a register reading not available in Asset Meter notify new AMHHDC
20 This Meter Advance Reconciliation will require historic Asset Metered Data from the old AMHHDC, and the new AMHHDC shall therefore ensure that step 2.1.9.11 is carried out in time for this data to be received.
21 The new HHDC should not send the D0170 flow prior to the HHDC Effective From Date on their D0155 ‘Notification of Meter Operator or Data Collector Appointment and Terms’ flow received from their associated AMVLP
22 If a register reading not available in Asset Meter notify new HHDC
23 This Meter Advance Reconciliation will require historic Asset Metered Data from the old HHDC, and the new HHDC shall therefore ensure that step 2.1.10.11 is carried out in time for this data to be received.
24 The new AMHHDC should not send the D0170 flow prior to the AMHHDC Effective From Date on their P0314 ‘Notification of AMHHDC’ flow received from their associated AMVLP
25 If a register reading not available in Asset Meter notify new AMHHDC
26 This Meter Advance Reconciliation will require historic Asset Metered Data from the old AMHHDC, and the new AMHHDC shall therefore ensure that step 2.1.11.11 is carried out in time for this data to be received.
27 The new AMHHDC should not send the D0170 flow prior to the AMHHDC Effective From Date on their P0314 ‘Notification of AMHHDC’ flow received from their associated AMVLP
28 If a register reading not available in Asset Meter notify new AMHHDC
29 This Meter Advance Reconciliation will require historic Asset Metered Data from the old AMHHDC, and the new AM HHDC shall therefore ensure that step 2.1.12.11 is carried out in time for this data to be received.
30 The HHDC should not send the D0170 flow prior to the AMHHDC Effective To Date on their P0314 ‘Notification of AMHHDC’ flow received from their associated AMVLP
31 If a register reading not available in Asset Meter notify HHDC
32 This Meter Advance Reconciliation will require historic Asset Metered Data from the AMHHDC, and the HHDC shall therefore ensure that step 2.1.13.6 is carried out in time for this data to be received.
33 For example due to the remoteness no mobile communication being possible or site restrictions on the use of mobile communications.
34 For example due to the remoteness no mobile communication being possible or site restrictions on the use of mobile communications.
35 For example due to the remoteness no mobile communication being possible or site restrictions on the use of mobile communications.
36 If the Asset Metering System cannot be reconfigured or replaced at the appointed time, the SVA MOA or AMMOA, as applicable, shall liaise with the AMVLP to agree the way forward.
37 If replacement includes Measurement Transformers, commission in accordance with Code of Practice Eleven and proceed as per section 2.1.2.
38 For example due to the remoteness no mobile communication being possible or site restrictions on the use of mobile communications.
39 The HHDC shall send actual data to the SVAA as soon as it is available, but shall send estimated data for the SF VAR if actual data is not available. The HHDC shall not be required to resend data for subsequent VARs after submitting actual data, unless more accurate data has become available.
40 J0020 ‘Actual/Estimated Indicator’ should only include the J0020 populated with ‘A’ or ‘E’, and not include the J0020 populated with ‘C’
41 Estimated data in the D0390 identified in the J0020 ‘Actual/Estimated Indicator’ Data Item containing “E”
42 The AMHHDC shall send actual data to the HHDC as soon as it is available but shall send estimated data for the SF VAR if actual data is not available. The AMHHDC shall not be required to resend data for subsequent VARs after submitting actual data, unless more accurate data has become available.
43 Estimated data in the D0390 identified in the J0020 ‘Actual/Estimated Indicator’ Data Item containing “E”.
44 The HHDC shall send actual data to the SVAA as soon as it is available, but shall send estimated data provided by the AMHHDC for the SF VAR if actual data is not available. The HHDC shall not be required to resend data for subsequent VARs after submitting actual data, unless more accurate data has become available.
45 J0020 ‘Actual/Estimated Indicator’ should only include the J0020 populated with ‘A’ or ‘E’, and not include the J0020 populated with ‘C’
46 Estimated data in the D0390 identified in the J0020 ‘Actual/Estimated Indicator’ Data Item containing “E”
47 Any Participant other than the HHDC, AMHHDC or AMVLP wishing to request that the SVA MOA or AMMOA carries out an Asset Metering System investigation shall do so via the VLP
48 Where the HHDC or AMHHDC (if applicable) raises the fault, it should send the notification to the AMVLP for information purposes only. Where the AMVLP raises the fault, it should send the notification to the HHDC or AMHHDC (if applicable) for information purposes only
49 The SVA MOA or AMMOA should contact and liaise with the AMVLP if appropriate
50 The D0005 ‘Instruction on Action’ should always be sent containing the high level points so that an audit trail can be maintained. For complex cases where the D0005 is not sufficient, or where requested by the HHDC or AMHHDC, further details can be given in the fault resolution plan. In these instances the sending of the fault resolution plan should be referred to in the D0005. Any other correspondence between the AMVLP, SVA MOA or AMMOA and HHDC or AMHHDC which is required to resolve the fault should be sent in a format and by a method agreed by those Participants involved.
51 Described as performing a mini-MAR.
52 For the avoidance of doubt, the data estimation method may be provided using the D0022 Additional Information Field, or by any other method agreed between the HHDC or AMHHDC (as applicable), AMVLP and SVAA (e.g. spreadsheets, emails) providing that an audit trail of such information is maintained.
53 The starting date for this time is either the Date of Asset Meter Installation, the Date of Commissioning, the Effective From Date of the Asset Meter, the Effective Date of a Change of Agent as described in Section 3.6.1, or the date when an Asset Metering System becomes energised where there has been a key field change whilst the Asset Metering System was de-energised, whichever is the later.