BSCP504 | Non Half Hourly Data Collection for SVA Metering Systems Registered in SMRS |
BSCP505 | Non Half Hourly Data Aggregation for SVA Metering Systems Registered in SMRS |
Code of Practice 5 | The Metering of Energy transfers with a Maximum Demand of up to (and including) 1MW for Settlement purposes |
Code of Practice 8 | The Metering of Import Active Energy via Low Voltage Circuits for Non Half Hourly Settlement purposes |
Code of Practice10 | Whole Current Metering of Energy via Low Voltage Circuits for Settlement Purposes |
BSCP | Balancing and Settlement Code Procedure |
EMDS | Energy Market Data Specification |
Id | Identifier |
kW | kilo-watts |
LF | Load Factor |
MD | Maximum Demand |
MSID | Metering System Identifier |
MOA | Meter Operator Agent |
NHHDA | Non Half-Hourly Data Aggregator |
NHHDC | Non Half-Hourly Data Collector |
Code | the Balancing and Settlement Code |
REC | Retail Energy Code |
PrA | Profile Administrator |
SMRA | Supplier Meter Registration Agent |
SMRS | Supplier Meter Registration Service |
SSC | Standard Settlement Configuration |
UTC | Co-ordinated Universal Time |
Sample | A group of electricity consumers drawn randomly from a Profile Class designed to be representative of the population of the Profile Class. |
Sample Participant | A consumer of electricity whose consumption of electricity is being measured by the Profile Administrator. |
Stratum | A sub-division of the Sample included in the Sample design that is defined by criteria such as annual consumption, GSP Group or Customer Type. |
Super Stratum | Super Strata are a sub-division of the Sample that is defined by the annual consumption band in KWh from which Sample Participants must be drawn. |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | By 1 October | Provide PrA with target breakdown. | BSCCo | PrA | Total Sample Participants required by GSP Group, Profile Class and Stratum. | via the BSC Service Desk |
3.1.2 | By 1 November | Provide existing Sample Participant details. | PrA | BSCCo | Existing Sample Participant details by GSP Group, Profile Class and Stratum. | via the BSC Service Desk |
3.1.3 | Within 10 WD of 3.1.2 | Provide Sample Participant request by Supplier. | BSCCo | PrA | Sample Participant request by Supplier, MPID, GSP Group, Profile Class and Stratum. | via the BSC Service Desk |
3.1.4 | Within 5 WD of 3.1.3 | Request random selection of Sample Participants by Supplier and request confirmation for each MSID of whether the Supplier shall appoint agents of its choice (for NHH Settlement purposes) and provide half hourly data or appoint the PrA’s nominated agents for NHH Settlement purposes. Where the PrA’s nominated NHH agents are used, the PrA shall also be responsible for half hourly data collection as described in section 1.2.2. Where the Supplier has customers in the Sample as Sample Participants, provide Supplier with details of these Sample Participants as part of the Sample Participant request. Provide details of PrA’s agents. | PrA | Supplier(s) | Dedicated point of contact for Supplier. Sample Participant request in accordance with paragraph 4.1.1 of the appendices. Details of existing Sample Participants that are customers of the Supplier. PrA agent details by MPID. | via the BSC Service Desk |
3.1.5 | Within 20 WD of 3.1.4 | Provide Sample Participant details and confirm for each MSID whether the Supplier shall appoint agents of its choice (for NHH Settlement purposes) and provide half hourly data or appoint the PrA’s nominated agents for NHH Settlement purposes. Where the Supplier appoints the PrA’s nominated NHH agents, the PrA shall be responsible for half hourly data collection as described in section 1.2.2. The Supplier may provide additional Sample Participants for the Sample within the constraints of the request at this point in case any of the Sample Participants provided are found to be unsuitable at a later date. Confirm details of any existing Sample Participants provided by the PrA. in 3.1.4. | Supplier(s) | PrA | Randomly selected Sample Participants and Sample Participant details in accordance with paragraphs 4.1.2 and 4.2 of the appendices. Confirmed details of all Sample Participants. Confirmation of agents to appoint by MPID. | via the BSC Service Desk |
3.1.6 | Within 5 WD of 3.1.5 | Review Sample Participants and request replacement Sample Participants where proposed Sample Participants are not suitable. | PrA | Supplier(s) | Sample Participant request in accordance with paragraph 4.1 of the appendices. | via the BSC Service Desk |
3.1.7 | Within 5 WD of 3.1.6 | If replacement Sample Participants requested, provide Sample Participants. | Supplier(s) | PrA | Randomly selected Sample Participants by GSP Group, Profile Class, Stratum, Consumption Level and Customer Type in accordance with paragraphs 4.1 and 4.2 of the appendices. | via the BSC Service Desk |
3.1.8 | By 10th WD in January | Confirm Sample Participants. | PrA | Supplier/ BSCCo | Confirmation of agreed Sample Participants. | via the BSC Service Desk |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.1 | Once Sample Participants confirmed | If all Sample Participants have the required Profile Capable Metering Systems (as Settlement meters that also collect half hourly data) and all agents (NHHDC, NHHDA, SVA MOA) are appointed, proceed to Ref (3.3.1) otherwise continue on to Ref (3.2.2). | Supplier | - | Sample Participant details. | - |
3.2.2 | By 10th WD in February | Ensure that all agents (NHHDC, NHHDA, SVA MOA) are appointed, whether these are the PrA’s nominated agents, or agents of the Supplier’s own choice. Confirm appointment of agents (at MSID level) and that the Supplier is able to provide half hourly data. | Supplier | PrA | For the appointment of Settlement agents only (NHHDC, NHHDA and SVA MOA) Confirmation of appointed agents at MPID level in accordance with paragraphs 4.1.3 of the appendices. | Industry methods and the BSC Service Desk |
3.2.3 | By 10th WD in March | For confirmed Sample Participants and as required, replace existing equipment with Profile Capable Metering Systems in accordance with existing industry processes as set out in the REC. | Supplier | SVA MOA | Sample Participant details and information required in accordance with paragraphs 4.1.2 and 4.3 of the appendices and the REC. | Email or other electronic means |
3.2.4 | By 10th WD in March | Confirm Metering equipment replaced successfully. If Metering equipment not replaced successfully, propose replacement Sample Participants. | Supplier | PrA | Confirmation of successful installation or proposed replacement Sample Participants in accordance with paragraphs 4.1 and 4.2 of the appendices. Confirmation of successful installation in accordance with paragraph 4.1.4 of the appendices. | via the BSC Service Desk |
3.2.5 | Within 2 WD of 3.2.3 | Confirm proposed replacement Sample Participants. | PrA | Supplier | Confirmation of final Sample Participants. | via the BSC Service Desk |
3.2.6 | By 31 March | For confirmed Sample Participants replace existing equipment with Profile Capable Metering Systems in accordance with existing industry processes as set out in the REC as required. | Supplier | MOA | Sample Participant details and information required in accordance with the REC. | Email or other electronic means |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | By 10th WD in March | Instruct the relevant agent to begin half hourly data collection (or begin half hourly data collection if this will be conducted by the Supplier or PrA itself). | Supplier or PrA | agent | Sample Participant details. | Email or other electronic means |
3.3.2 | By 10th WD following the end of each month. | Provide validated half hourly data for the previous month. | PrA | half hourly data file (1 file for all MSIDs) with validation in accordance with paragraphs 4.1.5 and 4.4 of the Appendices. | via the BSC Service Desk | |
3.3.3 | Within 10th WD of any problems identified | If a Supplier is unable to provide validated half hourly data for a Sample Participant, the Supplier shall inform the PrA as appropriate and investigate and rectify the problem.3 Resubmit validated half hourly data where appropriate. | Supplier2 | PrA | Sample Participant details and problem details. Validated half hourly data where appropriate. | via the BSC Service Desk |
3.3.4 | Within 5 WD of 3.3.2 or 3.3.3 | Acknowledge receipt of validated half hourly data and notify Supplier of any discrepancies. | PrA | Supplier | Acknowledgement of validated half hourly data and details of any discrepancies. | via the BSC Service Desk |
3.3.5 | Within 10 WD of 3.3.4 | Resolve any discrepancies reported by the PrA. | Supplier | PrA | Details of any discrepancy and revised validated half hourly data. | via the BSC Service Desk |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | By 10th WD in June4 | Calculate Supplier Metering and data collection rebate (Profile Sum) in accordance with paragraph 1.2.4 and submit calculation to BSCCo. Where no Metering Systems have been installed or no half hourly data has been collected, a rebate shall not be required. | PrA | BSCCo | Number of meters installed by Supplier, number of months data collection has taken place. | via the BSC Service Desk |
3.4.2 | Within 5 WD of 3.4.1 | Review submitted calculation. Approve calculation or request changes. | BSCCo | PrA | Profile Sum calculation. | via the BSC Service Desk |
3.4.3 | If change requested: within 5 WD of 3.4.2 | Submit revised calculation. | PrA | BSCCo | Revised Profile Sum calculation. | via the BSC Service Desk |
3.4.4 | Within 5 WD of 3.4.3 | Approve revised calculation. | BSCCo | PrA | Revised Profile Sum calculation. | via the BSC Service Desk |
3.4.5 | Within 10 WD of 3.4.2 or 3.4.4 | Pay Suppliers by BACS or other agreed means. | PrA | Supplier | Approved Profile Sum and payment details. | Electronic or other agreed means |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.1 | Within 5WD of expected half hourly data not received. | Investigate cause of missing data and inform the Supplier of the affected MSIDs. | PrA | Supplier | MSIDs of affected Sample Participants. | via the BSC Service Desk |
3.5.2 | Within 10 WD of 3.5.1 | Inform the PrA where: a) a Change of Supplier has occurred5; or b) the Supplier’s agent cannot collect data. Proceed to Ref (3.3.3). | Supplier | PrA | MSIDs of missing Sample Participants with missing data. | via the BSC Service Desk |
3.5.3 | Within 5 WD of 3.5.2 | If change of Supplier confirmed, retire Sample Participant from sample. | PrA |
| MSIDs of Sample Participants that have had a Change of Supplier. | via the BSC Service Desk |
REF | WHEN | DESCRIPTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | By 1 June | Provide Supplier with list of Sample Participants in Sample to confirm whether any changes have occurred. | PrA | Supplier | Details of current Sample Participants in Sample in accordance with the paragraph 4.1.6 of the Appendices | via the BSC Service Desk |
3.6.2 | Within 10 WD of 3.6.1 | Confirm existing Sample Participant details.6 | Supplier | PrA | Confirmation of Sample Participant details including date of any changes in accordance with paragraph 4.1.6 of the Appendices. | via the BSC Service Desk |
3.6.3 | Within 5 WD of 3.6.2 | Review target requirements for next BSC year and inform BSCCo. | PrA | BSCCo | Sample Participant information. | via the BSC Service Desk |
Supplier | SUPX |
|
|
MPID | XXXX |
|
|
|
|
|
|
Total Requirements |
|
|
|
Profile Class | MSIDs |
|
|
2 | 0 |
|
|
|
|
|
|
Super Stratum 1 | 0 - 5,999 kWh |
|
|
Super Stratum 2 | 6,000 - 13,999 kWh |
|
|
Super Stratum 3 | >14,000 kWh |
|
|
GSP GROUP | Super Stratum | Stratum | Requirement |
_C | 1 | 1 | 0 |
_J | 1 | 2 | 0 |
_H | 1 | 3 | 0 |
_L | 1 | 4 | 0 |
_A | 1 | 5 | 0 |
_B | 1 | 6 | 0 |
_E | 1 | 7 | 0 |
_K | 1 | 8 | 0 |
_D | 1 | 9 | 0 |
_M | 1 | 10 | 0 |
_F | 1 | 11 | 0 |
_G | 1 | 12 | 0 |
_C | 2 | 13 | 0 |
_J | 2 | 14 | 0 |
_H | 2 | 15 | 0 |
_L | 2 | 16 | 0 |
_A | 2 | 17 | 0 |
_B | 2 | 18 | 0 |
_E | 2 | 19 | 0 |
_K | 2 | 20 | 0 |
_D | 2 | 21 | 0 |
_M | 2 | 22 | 0 |
_F | 2 | 23 | 0 |
_G | 2 | 24 | 0 |
_C | 3 | 25 | 0 |
_J | 3 | 26 | 0 |
_H | 3 | 27 | 0 |
_L | 3 | 28 | 0 |
_A | 3 | 29 | 0 |
_B | 3 | 30 | 0 |
_E | 3 | 31 | 0 |
_K | 3 | 32 | 0 |
_D | 3 | 33 | 0 |
_M | 3 | 34 | 0 |
_F | 3 | 35 | 0 |
_G | 3 | 36 | 0 |
Total |
|
| 0 |
Supplier | SUPX |
|
|
MPID | XXXX |
|
|
|
|
|
|
Total Requirements |
|
|
|
MSIDs |
|
|
|
Profile Class | Requirement |
|
|
3 | 0 |
|
|
|
|
|
|
Super Stratum 1 | 0-4,999 kWh |
|
|
Super Stratum 2 | 5,000-9,999 kWh |
|
|
Super Stratum 3 | 10,000-19,999 kWh |
|
|
Super Stratum 4 | 20,000-34,999 kWh |
|
|
Super Stratum 5 | 35,000-69,999 kWh |
|
|
Super Stratum 6 | >70,000 |
|
|
|
|
|
|
Super Stratum | Stratum | Customer Type | Requirement |
1 | 1 | commercial | 0 |
1 | 2 | industrial | 0 |
2 | 3 | commercial | 0 |
2 | 4 | industrial | 0 |
3 | 5 | commercial | 0 |
3 | 6 | industrial | 0 |
4 | 7 | commercial | 0 |
4 | 8 | industrial | 0 |
5 | 9 | commercial | 0 |
5 | 10 | industrial | 0 |
6 | 11 | commercial | 0 |
6 | 12 | industrial | 0 |
Total |
|
| 0 |
GSP GROUP | Requirement |
|
|
|
|
|
|
_C | 0 |
|
|
_J | 0 |
|
|
_H | 0 |
|
|
_L | 0 |
|
|
_A | 0 |
|
|
_B | 0 |
|
|
_E | 0 |
|
|
_K | 0 |
|
|
_D | 0 |
|
|
_M | 0 |
|
|
_F | 0 |
|
|
_G | 0 |
|
|
_N | 0 |
|
|
_P | 0 |
|
|
Total | 0 |
|
|
Supplier | SUPX |
|
MPID | XXXX |
|
|
|
|
Total Requirements |
|
|
Profile Class | MSIDs |
|
4 | 0 |
|
|
|
|
Super Stratum 1 | 0 - 9,999 kWh |
|
Super Stratum 2 | 10,000 - 24,999 kWh |
|
Super Stratum 3 | 25,000 - 49,999 kWh |
|
Super Stratum 4 | 50,000 - 99,000 kWh |
|
Super Stratum 5 | >100,000 kWh |
|
|
|
|
Super Stratum | Stratum | Requirement |
1 | 1 | 0 |
2 | 2 | 0 |
3 | 3 | 0 |
4 | 4 | 0 |
5 | 5 | 0 |
Total |
| 0 |
GSP GROUP | Requirement |
_C | 0 |
_J | 0 |
_H | 0 |
_L | 0 |
_A | 0 |
_B | 0 |
_E | 0 |
_K | 0 |
_D | 0 |
_M | 0 |
_F | 0 |
_G | 0 |
Total | 0 |
MPID | MSID | Will Supplier use PrA’s agents? (Y/N) | Sample Participant Name | Site Addr 1 | Site Addr 2 | Site Addr 3 | Site Addr 4 | Post code | Sample Participant Contact 1 | Sample Participant Contact 2 | GSP Group | Profile Class | Super Stratum | Stratum | Annual Consumption8 | Customer Type D=Domestic I=Industrial C=Commercial | Does Sample Participant have PCMS installed? (Y/N) | SSC | SIC Code |
M | M | M | MC | M | M | M | M | M | MC | OC | M | M | M | M | M | M | M | M | O |
4 char | 13 char | 1 char | 50 char | 50 char | 50 char | 50 char | 50 char | 7 char | 50 char | 50 char | 2 char | 2 char | 2 char | 2 char | 10 char | 1 char | 1 char | 4 char | 8 char |
MPID | MSID | Appointed NHHMO | NHHMOA Contact | Appointed NHHDC | NHHDC Contact | Appointed NHHDA | NHHDA Contact | GSP Group |
M | M | O | O | O | O | O | O | M |
4 char | 13 char | 4char | 100char | 4char | 100 char | 100 char | 100 char | 2 char |
MPID | MSID | NHHMO MPID | NHHDC MPID | Installation Date |
M | M | M | M | M |
Record Position | Item Name | Format | Description |
1 | Record Identifier | Char (1) | ‘D’ |
2-9 | Date of Readings | Date | GMT with the format YYYYMMDD |
10-11 | Source Id | Char (2) | Required for identification, suggested characters “PA” for Profile Administration. |
12-24 | MSID | Char (13) |
|
25-224 | Register Values | Int (10) | 20 instances of register values (optional, leave blank if not collected). |
225-1520 | kWh/kWh Flag | NUM(7,4)/Text (1) x3 | 48 recurring instances9,10 In all instances this shall be actual data and Text(1) will state ‘A’. (for actual data). Each interval (kWh/lag/lead) is 9 characters long (8 characters for the reading, 1 character for the decimal point and 1 character for the text flag). Where no lag and lead channels are collected, these should be left blank after the kWh interval data. |
MPID |
MSID | Will Supplier use PrA’s Agents? (Y/N) | Sample Participant Name | Site Addr 1 | Site Addr 2 | Site Addr 3 | Site Addr 4 | Post code | Sample Participant Contact 1 | Sample Participant Contact 2 | GSP Group | Profile Class | Super Stratum | Stratum | Customer Type D=Domestic I=Industrial C=Commercial | Does Sample Participant have PCMS installed? (Y/N) | SSC | SIC Code |
M | M | M | C | M | M | M | M | M | C | C | M | M | M | M | M | M | M | O |
4 char | 13 char | 1 char | 50 char | 50 char | 50 char | 50 char | 50 char | 7 char | 50 char | 50 char | 2 char | 2 char | 2 char | 2 char | 1 char | 1 char |
| 8 char |
NHHMOA MPID | NHHDC MPID | Installation Date | Date of change of tenancy |
M | M | M | M |
Area of Requirement | Document | Sections |
Accuracy | CoP8 Issue 1 | 4.2 and 5.2 |
Measurement Criteria | CoP8 Issue 1 | 4.1, 5.1 and 6.3.1 |
Displays | CoP8 Issue 1 | 6.3 |
Sealing arrangements | CoP8 Issue 1 | 5.2.6, 5.2.8 and 7.3 |
Communications | CoP5 Issue 6 or CoP10 Issue 1 | 5.6 in CoP5 or 5.5 in CoP10 |
Security requirements | CoP5 Issue 6 or CoP10 Issue 1 | 5.6 in CoP5 or 5.4 in CoP10 |
Data Storage | CoP5 Issue 6 or CoP10 Issue 1 | 5.5.1 in CoP5 or 5.3.1 in CoP10 |
Time keeping | CoP5 Issue 6 or CoP10 Issue 1 | 5.5.2 in CoP5 or 5.3.2 in CoP10 |
Monitoring Facilities | CoP5 Issue 6 or CoP10 Issue 1 | 5.5.3 in CoP5 or 5.3.3 in CoP10 |
Version | Date | Description of Changes | Changes Included | Mods Panel Ref |
D0.1 | 27 March 2001 | Re-Badged |
|
|
D0.2 | 27 March 2001 | Incorporates review comments arising from NETA CMC00042 | NCR313 |
|
1.0 | 27 March 2001 | Approved for use by the Panel 22/02/01 |
| P/013/008 |
2.0 | BETTA Effective Date | SVA February 2005 Release and BETTA 6.3 | CP1091 and BETTA 6.3 | SVG/48/004 |
3.0 | 1 December 2009 | Modification P223 | P223 | SVG101/03 Panel 144/04 |
|
|
| CP1176 (part) | ISG68/02 SVG67/02 |
4.0 | 28 February 2013 | February 2013 Release | CP1380 | SVG141/07 |
5.0 | 26 June 2014 | June 2014 Release | CP1394 | SVG152/07 |
6.0 | 28 June 2018 | June 2018 Release | CP1502 | SVG206/07 |
7.0 | 1 September 2021 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 If the Supplier changes agents it must inform the PrA.
2 This may be provided either by the Supplier or the relevant agent.
3 If a Sample Participant site has been disconnected or if the Supplier has confirmed site disconnection the PrA shall retire the Sample Participant. If it has been de-energised and the Supplier has appointed the PrA’s agents, the Supplier shall appoint new NHH agents. The PrA shall retire that Sample Participant.
4 The first rebate following implementation of Modification P223 will not take effect until June 2011.
5 Where the Supplier is aware of a Change of Supplier event, it may inform the PrA at any time before it receives a request from the PrA to investigate any affected MPANs.
6 Where the Supplier is aware of any change of details, it may inform the PrA at any time before it receives a request from the PrA to confirm whether any changes have occurred.
7 The Supplier shall use its best endeavours in determining the Customer Type e.g. whether a Sample Participant is an industrial or commercial customer.
8 Either Settlement Data (EAC/AA) or billing data may be used in the calculation of the annual consumption.
9 This format supports up to three streams of interval data for each interval (kWh, lag and lead).
10 All data should be returned in GMT to avoid losing data on clock change days.