BSC Procedure 128 Appendix 2 relating to Methodology Self Assessment Document (MSAD) for Embedded LDSOs that Mirror

1. Reference is made to the Balancing and Settlement Code (the Code) for the Electricity Industry in Great Britain and, in particular, to the definition of "BSC Procedure".

2. This is BSCP128 Appendix 2, Version 2.0 relating to the Methodology Self Assessment Document (MSAD) for Embedded LDSOs that Mirror.

3. This BSC Procedure Appendix is effective from 24 June 2010.

4. This BSC Procedure has been approved by the Panel.

1. Introduction

Objectives of the MSAD

The Audit of Line Loss Factors seeks to provide additional transparency and consistency regarding the calculation and application of Line Loss Factors (LLFs) used in Settlement by creating a set of high level principles, which all LLF methodologies (created by Licensed Distribution System Operators (LDSOs)) must adhere to. The principles are detailed in BSCP128 ‘Production, Submission, Audit and Approval of Line Loss Factors’.

Licensed Distribution System Operators require a review of the methodologies used to calculate LLFs to ensure that they are consistent with the principles. This Methodology Self Assessment Document (MSAD) is for Embedded LDSOs that Mirror the HOST LDSO’s methodology (or another Embedded LDSO that has its own methodology. It is designed to gather factual information about the GSP Groups and therefore which LLF Methodology(ies) the Embedded LDSO is Mirroring.

Guidance for completing the MSAD

The MSAD has been split into two sections as follows:

1.1 General Information

This section should be completed in full in respect of all questions.

1.2 Methodology Applicability Section.

LDSOs should provide information for each GSP Group in which it operates and the methodology it is Mirroring for the relevant GSP Group. Where the Embedded LDSO does not operate in a GSP Group, the Host LDSO field should be marked as N/A and other fields for that GSP Group left blank.

1.3 Generic Supporting Information

LDSOs should provide the information requested in the table for each GSP Group in which it operates.

1.1 General Information

Distribution Company Name

We confirm that:

  • the Line Loss Factor Methodology Self-Assessment Document (MSAD) is true, complete and accurate and not misleading because of any omission or ambiguity or for any other reason; and

  • in our opinion, the arrangements as documented are adequate and appropriate for the provisions under the Balancing and Settlement Code Section K and BSCP128 ‘Production, Submission, Audit and Approval of Line Loss Factors.

Authorised Signature

Name of Authorised Signatory

(Category X as per BSCP38 ‘Authorisations’)

Password

Date

VERIFICATION OF DETAILS To be completed by BSCCo

DATE RECEIVED _________________________

NAME AND PASSWORD/SIGNATURE VALID (Y/N) _________________________

1.2 Methodology Applicability by GSP Group

GSP Group

Do you have any Metering Systems within this GSP Group?

Will you Mirror the Host LDSO LLFs?

If you are not Mirroring the Host LDSO LLFs please complete BSCP128 Appendix 1 instead of this Appendix 2.

_A Eastern

Yes/No

Yes/No

_B East Midlands

Yes/No

Yes/No

_C London

Yes/No

Yes/No

_D Merseyside and North Wales

Yes/No

Yes/No

_E Midlands

Yes/No

Yes/No

_F Northern

Yes/No

Yes/No

_G North Western

Yes/No

Yes/No

_H Southern

Yes/No

Yes/No

_J South Eastern

Yes/No

Yes/No

_K South Wales

Yes/No

Yes/No

_L South Western

Yes/No

Yes/No

_M Yorkshire

Yes/No

Yes/No

_N South Scotland

Yes/No

Yes/No

_P North Scotland

Yes/No

Yes/No

Note: Where an Embedded LDSO proposes to use their own methodology to calculate any LLFs the MSAD document ‘MSAD for Host LDSOs and Embedded LDSOs that do not Mirror’ (BSCP128 Appendix 1 to BSCP128) should be completed.

1.3 Generic supporting information

GSP Group

LLFC Group Description

Voltage (EHV/HV/LV)

Applicable LLFCs

No. of Metering Point Identification Numbers (MPANs)1

AMENDMENT RECORD – BSCP128 APPENDIX 2

Version

Date

Description of Changes

Changes Included

Mods/ Panel/ Committee Refs

1.0

20/04/09

First Published

P216

153/04

2.0

24/06/10

June 10 Release

CP1326

ISG111/03

SVG111/01

Intellectual Property Rights, Copyright and Disclaimer

The copyright and other intellectual property rights in this document are vested in ELEXON or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make.

All other rights of the copyright owner not expressly dealt with above are reserved.

No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it.

1 Approximate numbers are acceptable at date of submission.