Metering Equipment for Supplier Volume Allocation (SVA) which is covered by BSCP514; and
Detailed requirements and intervals for carrying out inspection, testing and calibration of meters, which are covered in Code of Practice Four.
MOA to understand its obligations in relation to CVA Meter operations;
MOA to notify work which requires seals to be broken;
MOA for the breaking of Metering Equipment seals and their resealing, and also for ensuring the necessary audit trail is maintained through the reading of Meters for reconciliation purposes;
MOA for the sealing of new metering equipment;
MOA for maintaining a local register of sealing pliers and a local register of seals applied;
CDCA for maintaining a register of sealing pliers;
CDCA for breaking and remaking Metering Equipment seals, where necessary, in order to perform any manual on-site interrogation of the Outstation(s) (in accordance with Section R1.4.3).
CDCA to update local on-site register of seals applied;
CDCA for notifying the MOA which Metering Equipment seals it has broken, where necessary, and remade following on-site interrogation of the Outstation(s); and
BSCCo for maintaining a central register of MOA and the CDCA sealing IDs.
BSCP03 | Data Estimation and Substitution for Central Volume Allocation |
BSCP05 | Meter Advance Reconciliation for Central Volume Allocation |
BSCP20 | Registration of Metering System for Central Volume Allocation |
BSCP25 | Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points |
BSCP27 | Technical Assurance of Half Hourly Metering Systems for Settlement Purposes |
BSCP38 | Authorisations |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs. |
Reseal the Metering Equipment immediately following the manual on-site interrogation of the Outstation(s);
Update the local on-site copy of the register of seals applied;
Notify the MOA which Metering Equipment seal(s) has been broken and remade, within 2WD following the manual on-site interrogation of the Outstation(s). Details to include are:
MSID
Circuit name;
Metering Equipment sealed;
Date seals applied;
Sealing pliers number; and
The name of the CDCA operative who applied the seal(s); and
Keep a record of such notification for audit purposes.
The CDCA may only break and remake seals necessary in order to gain access to the local communication port.
Is not associated with the CVA Metering Equipment but requires secondary metering VT isolation. This type of work is usually circuit planned outages.
Associated with the CVA Metering Equipment which is not due to a fault. This type of work is usually replacement of Outstation battery, calibration of Meters, accuracy tests of Meters.
Circuit name;
Metering Equipment sealed;
Date seals applied;
Sealing pliers number; and
Signature of person applying seals.
BSCCo | Balancing and Settlement Code Company |
CDCA | Central Data Collection Agent |
CMRS | Central Meter Registration Service |
CVA | Central Volume Allocation |
LDSO | Licensed Distribution System Operator |
MOA | Meter Operator Agent |
MSID | Metering System Identifier |
MSSY | Metering Sub System Identifier |
NETSO | National Electricity Transmission System Operator as the holder of the Transmission Licence and any reference to "NETSO", "NGESO", "National Grid Company" or "NGC" in the Code or any Subsidiary Document shall have the same meaning. |
SVA | Supplier Volume Allocation |
TAA | Technical Assurance Agent |
UTC | Co-ordinated Universal Time |
WD | Working Day |
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.1.1 | For routine work, prior to the day work is to be carried out, or, for work carried out in respect of a metering fault | If MOA wishes to carry out some work give notification of date, time and place where work required, or, Proceed to step 3.1.3 | MOA1 | Registrant | Details of the work to be completed, including date, time and place. | Letter / Fax / Email |
3.1.2 | Following 3.1.1, and prior to the day work is to be carried out. | If Registrant wishes to attend the site, they provide confirmation. | Registrant | MOA | Confirmation of attendance | Letter / Fax / Email |
3.1.3 | Day work carried out | Give notification of work to be carried out and where appropriate request CDCA to remotely interrogate Outstation(s)2. | MOA | CDCA |
| Phone / Fax / Email |
|
| Where appropriate, take “before” Meter readings. | MOA |
| BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet This form must be signed by an authorised person as registered under BSCP38. | Internal |
|
| Break seal(s). | MOA |
|
| Internal |
3.1.4 | On the day when work has been completed | Where appropriate, take “after” Meter readings, reseal Metering Equipment. | MOA |
| BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet | Internal |
|
| Update register of seals applied and ensure the details are available for inspection on and off site. |
|
| Register of seals applied | Phone / Fax / Email |
|
| Where appropriate, request CDCA to remotely interrogate Outstation(s). | MOA | CDCA | Request to remotely interrogate Outstation(s) |
|
3.1.5 | Within 3 WD of 3.1.4 | Send confirmation and details of work carried out, along with “before” and “after” readings. | MOA | CDCA, Registrant | BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet | Letter / Fax / Email |
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.2.1 | Prior to the Effective From Date of the Metering System | Take “initial” Meter readings, seal all Metering Equipment and update register of seals applied. | MOA |
| BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet Signing witness must be an authorised person as registered under BSCP38. | Internal |
3.2.2 | Within 3 WD of 3.2.1 | Provide initial Meter readings. | MOA | CDCA, Registrant | BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet | Letter / Fax / Email |
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.3.1 | On date agreed under BSCP20 |
|
|
| BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet Signing witness must be an authorised person as registered under BSCP38 | Internal |
3.3.2 | Within 3 WD of 3.3.1 | Provide final Meter readings. | MOA | CDCA, Registrant | BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet | Letter / Fax / Email |
3.3.3 | Following 3.3.2 | Perform Meter Advance Reconciliation in accordance with BSCP05. | CDCA |
|
| Internal |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | As soon as aware of inconsistency or possible fault. | Send notification of inconsistencies or possible fault and request investigation. | CDCA3 or BSCCo or any Party | Registrant BSCCo MOA LDSO or NETSO as appropriate | BSCP06/4.5 Part A ‘Metering Equipment Fault Report’. | Fax / Letter / Email |
3.4.2 | As soon as possible after 3.4.1 | Investigate problem: a) Resolve the issue; or b) Send request to MOA to inspect and test suspect metering. | Registrant |
a) Internal; b) MOA | Details of inconsistency. | Fax / Letter / Email |
3.4.3 | Within 3 WD of receipt of request in 3.4.2 | Investigate suspect metering and send report of findings. | MOA | CDCA Registrant | BSCP06/4.5 Part B ‘Metering Equipment Fault Report' | Fax / Letter / Email |
3.4.4 | Following 3.4.3 and where the report of findings indicates that the CDCA needs to carry out on-site interrogation of the Outstation(s) until the fault is resolved | Agree frequency of on-site manual interrogation of Outstation(s) required. | CDCA | Registrant MOA | Agreed frequency of on-site manual interrogation of Outstation(s) required. | Phone / Fax / Email |
3.4.5 | On the date(s) agreed in 3.4.4 | Carry out on-site interrogation of the Outstation(s) using approved protocol. Update local on-site register of seals applied. If the CDCA needs to break a Metering Equipment seal(s) to enable access to the local interrogation port on the Outstation(s) and remake Metering Equipment seal(s), then additional step 3.4.6 is required. When fault is resolved go to 3.4.7 | CDCA |
|
| Internal |
3.4.6 | Within 2WD of breaking and remaking a Metering Equipment seal(s) to enable access to local interrogation port on the Outstation(s) in 3.4.5 | Notify the MOA (and Registrant if required) of the details of any Metering Equipment seals broken and remade by the CDCA in order to gain access to the local interrogation port on the Outstation(s) to enable on-site interrogation of the Outstation(s). | CDCA | MOA, Registrant (if required) | Details of MSID, circuit name, Metering Equipment sealed, date seals applied, sealing pliers ID and number; and the name of CDCA operative who applied the seal(s). | Fax/Letter/Email |
3.4.7 | As soon as possible after receipt of data in 3.4.3 if fault is resolved or, in the case where the CDCA needs to carry out on-site interrogation of the Outstation(s), when the fault is resolved. | Report resolution of problem. | Registrant | BSCCo LDSO or NETSO as appropriate | Details of findings and resolution of problem | Fax / Letter / Email |
3.4.8 | As soon as possible after receipt of data in 3.4.3 | Where an investigation indicates that a fault has caused incorrect Metered Data to be recorded, estimate Metered Data in accordance with BSCP03. | CDCA | Registrant LDSO or NETSO as appropriate | Details of estimated Metered Data. | Fax / Letter / Electronic |
Circuit Name | Metering Equipment Sealed (e.g. Meter, Data Collector, Meter Panel Door, Meter Cabinet Rear Door, Potential Fuses, Test Terminal Block, etc) | Date Seals Applied | Sealing Pliers Number | Signature of Person Applying Seals |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Registrant: |
|
|
|
MOA: |
|
|
|
MSID(s): |
|
|
|
Date: |
|
|
|
CDCA Fault Ref: |
|
Communications |
| |
Outstation Id: |
| |
Comms Address: |
| |
Device Type: |
| |
Last Successful Call: |
| |
Comms Test: |
| |
Comments:
|
Data Quality |
| |
Type: |
| |
Outstation Id(s): |
| |
Subsystem Id: |
| |
Channel(s) Affected: |
| |
Comments:
|
Time Tolerance |
| |
Outstation Id: |
| |
Time Difference (secs): |
| |
Fast/Slow: |
| |
Comments:
|
Meter Advance Reconciliation |
| |
Meter Serial No: |
| |
Outstation Id: |
| |
Outstation Channel: |
| |
Other Details: |
| |
Comments:
|
Other |
|
Comments:
|
Date: |
|
|
|
MOA Fault Ref: |
|
|
|
CDCA Fault Ref: |
|
|
|
MSID(s) |
|
Action Taken:
|
Other Comments:
|
To: ______________________________ | Date Sent: __________ | |
From: Participant Details | ||
MOA ID: ______________________________ | Name of Sender: _________________________ | |
Contact email address: __________________________________________ | ||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | |
Name of Authorised Signatory: __________________________________ | ||
Authorised Signature: ______________________ | Password: ___________________ |
Before Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
After Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
Before Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
After Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
Before Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
After Reading |
| Physical Meter |
| Outstation (Primary)_ |
| Outstation (Secondary) | ||||||
Serial No.: |
|
|
| |||||||||
Import MWh |
| . |
|
| . |
|
| . |
| |||
Export MWh |
| . |
|
| . |
|
| . |
| |||
Import MVarh |
| . |
|
| . |
|
| . |
| |||
Export MVarh |
| . |
|
| . |
|
| . |
|
The equipment to be sealed;
The types of seal to be used and their purpose;
General sealing practice; and
Particular procedures for the control of specified seals and dies.
Measurement Technique | Metering Equipment to be sealed | MOA | LDSO/ NETSO/ Generation Co |
CT operated Low voltage | Primary voltage fuse only if no secondary fuse | S |
|
CT chamber | I | P | |
Meter terminal cover | S |
| |
Meter case (cover) | S |
| |
CT terminal cover | S |
| |
Test terminal block | S |
| |
Switch (controlling supply) | I | P | |
Secondary voltage fuse | S |
| |
Communications port | S |
| |
Metering Equipment connections to Load control equipment | S |
| |
Bus bar chamber | I | P | |
CT/VT operated High voltage (additional to LV) | VT racking | I | P |
VT fuses (on switchgear) | I | P | |
VT Marshalling box | I | P | |
VT fuse (on panel) | S |
| |
Auxiliary fuses | S |
| |
CT Marshalling box | I | P |
A security seal shall be used where both protection to avoid danger (to make opening of the equipment difficult) and indication of any interference are required. Where applied to Metering Equipment by a CVA MOA it shall be a specified seal as defined under ‘Specified Seal, Wire Rope and Associated Sealing Equipment’ below;
An indicative seal or label shall be used where only an indicative warning is required that work on the equipment could compromise the operation of Metering Equipment; and
A padlock shall be used to protect and to avoid danger on certain types of distribution/transmission equipment (to make opening of the equipment very difficult except to authorised persons having keys for the purposes of carrying out operations under required Safety Rules).
be a tin-plated, annealed, copper ferrule;
not be less than 5.0mm nor more than 7.0mm long;
have an internal diameter which is not less than 1.98mm nor more than 2.28mm;
be of some constant cross-section of such a size and shape so that its external perimeter lies within a circle whose diameter is not less than 4.06mm nor more than 4.6mm and the wall is nowhere less than 0.72mm thick; and
be crimped and marked on one side with the identification symbol appropriate to the MOA and on the other side with the 3-digit identification number of the Meter Operative. Alternatively, the specified seal can be crimped with up to 3 digits on each side to identify the Meter Operative and the identification symbol appropriate to the MOA, or the MOA's company name, may be impressed on a seal's flange or protuberance, provided that the design of the flange or protuberance is one approved by the BSCCo, from time to time.
be manufactured from 7 strands of drawn, class Z, zinc-coated wire complying with BS 2763:1982;
have a diameter of not less than 0.914mm; and
have a breaking load of not less than 880N.
No MOA shall retain any duplicate sets of dies.
Sealing pliers, dies or specified seals shall not be used other than for sealing Metering Equipment.
Sealing pliers with dies that do not make legible marks shall not be used.
Serial | Sender | Process | Sub-process / Data Flow | Recipient | Performance Measure | Service Levels | Reporting Method |
1 | Meter Operator Agent | Fault repairs | Meter Operator Agent | Time to rectify faults which would constitute a category 1 or category 2 non compliance as defined in BSCP27 | (i) 95% rectified within 5 working days of receipt of notification; (ii) 99% rectified within 15 working days of notification. | Provision of data under 10.1.1 of PSL100 | |
2 | Meter Operator Agent | Meter Technical Details | Incoming Meter Operator Agent | Complete, valid, correct format and accurate within Timescales | (i) 95% within 5 working days in accordance with this BSCP; (ii) 99% within 10 working days in accordance with this BSCP06. | Provision of data under 10.1.1 of PSL100 | |
3 | Meter Operator Agent | Meter Technical Details | CDCA | Complete, valid, correct format and accurate within Timescales | (i) 95% within 5 working days in accordance with BSCP02 (ii) 99% within 15 working days in accordance with BSCP02. | Provision of data under 10.1.1 of PSL100 | |
4 | Meter Operator Agent | Fault Resolution Reports | Registrant
CDCA | Complete, valid, correct format and accurate within Timescales | (i) 95% within 5 working days in accordance with this BSCP06; (ii) 99% within 15 working days in accordance with this BSCP06. | Provision of data under 10.1.1 of PSL100 |
To: BSCCo Date Sent:_______________________ |
From: Participant Details MOA ID:____________________________ Name of Sender:___________________ |
Our Ref:_____________________________ Contact Tel. No.:___________________ |
Name of Authorised Signatory: ___________________________________ Authorised Signature: ___________________ Password:________________________ |
Metering System Component | Impact on Data Quality | Method of Controlling Risk |
Primary Plant |
|
|
CTs and VTs |
|
|
Cabling and Marshalling Boxes |
|
|
Metering Panel |
|
|
Meters |
|
|
Outstations |
|
|
Auxiliary Power Supplies |
|
|
Communications Equipment |
|
|
Other |
|
|
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
1.0 | Code Effective Date | Designated Version | n/a | n/a |
2.0 | 14/12/00 | Work outstanding at Go Active resolution of inconsistencies inclusion of consultation comments | NCR 221 & 220 | 09/006 |
3.0 | 10/12/02 | CDCA Improvement Project CP | CP780 | n/a |
4.0 | 24/06/03 | Change Proposal for CVA Programme June 03 Release | CP821 |
|
5.0 | 24/06/03 | Approved Modification P62 | P62 |
|
6.0 | 30/06/04 | Change Proposals for CVA Programme June 04 Release | CP964, CP998 | ISG40/003 |
7.0 | 23/02/05 | CVA Programme Feb 05 Release | BETTA 6.3, CP1049, CP1054, CP1091 | ISG42/003 ISG46/002 |
8.0 | 28/06/06 | June 06 Release | P190 CP1152 |
ISG64/001 |
9.0 | 23/08/07 | P197 Release | P197 |
|
10.0 | 06/11/08 | November 08 Release | CP1242 | ISG88/01 SVG88/02 PAB88/03 |
11.0 | 24/06/10 | June 10 Release | CP1324 | ISG111/03 |
12.0 | 03/11/16 | November 16 Release | CP1462 | ISG184/05 |
13.0 | 29/03/19 | 29 March 2019 Standalone Release | P369 | P285/12 |
14.0 | 29/06/23 | 26 June 2023 Release | CP1580 | P339/04 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 Where the Registrant and MOA are the same, the Registrant can initiate the process but only in the role of MOA.
2 In the case of metering faults , located Offshore at Offshore Power Park Modules where access has been prevented for health and safety reasons for more than 5 WD of 3.1.3, the MOA shall notify BSCCo using Form BSCP06/4.9 ‘Risk Assessment of Metering Equipment Fault at Offshore Power Park Module’. BSCCo shall monitor progress and if necessary inform the relevant Panel Committee of any unsatisfactorily controlled risk.
3 In addition to informing the Registrant, BSCCo and LDSO or the NETSO, as appropriate, the CDCA shall also inform the MOA
4 In order to perform on-site interrogation of the Outstation(s) the CDCA may break and remake a Metering Equipment seal(s) in order to access the local communications port. In this circumstance, where reference is made in this Appendix 4.7 to the MOA or its operative(s) such relevant reference(s) shall apply equally to the CDCA or its operative(s).