BSC Procedure 04 relating to BM Unit Metered Volumes for Interconnector Users
1. Reference is made to the Balancing and Settlement Code and, in particular, to the definition of “BSC Procedure” in Section X, Annex X-1 thereof.
2. This is BSC Procedure 04 Version 5.0 relating to BM Unit Metered Volumes for Interconnector Users.
3. This BSC Procedure is to be effective from the BETTA Effective Date.
4. This BSC Procedure has been approved by the Panel.
For and on behalf of the Panel
1.1 Purpose and Scope of the Procedure
This procedure defines the process by which the Settlement Administration Agent (SAA) receives BM Unit metered data for each Interconnector User (IU) from the Interconnector Administrator (IA).
This procedure does not cover the following Interconnector activities:-
(a) The provision of BM Unit Metered Volumes for Interconnector Error Administrators.
(b) The collection of Interconnector Metered Volumes by the Central Data Collection Agent (CDCA).
(c) The interfaces between IUs and IAs
(d) The calculation of Expected Transfers for each IU by the IA
1.2 Main Users of the Procedure and their Responsibilities
This BSCP is to be used by IAs and the SAA.
Throughout this procedure timetables are referred to in relation to the number of working days after a Settlement Day (SD) e.g. SD + 4 is 4 working days after SD.
1.3 Balancing and Settlement Code Provisions
This BSCP has been produced in accordance with the provisions of the Code. In the event of an inconsistency between the provisions of this BSCP and the Code, the provisions of the Code shall prevail.
1.4 Associated BSC Procedures
BSCP01 Overview of Trading Arrangements
2 Acronyms and Definitions
The acronyms used in this BSCP are defined below.
CDCA | Central Data Collection Agent |
IU | Interconnector User |
SAA | Settlement Administration Agent |
SD | Settlement Day |
UTC | Co-ordinated Universal Time |
Full definitions of the above acronyms in
Section 2.1, and other terms used in this Procedure are, where appropriate, included in the
Code.
3 Interface and Timetable Information
3.1 BM Unit Volumes for Interconnector Users
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | By the end of the next WD following SD | Determine and submit BM Unit Metered Volumes | IA | SAA | Expected Transfer for each Interconnector BM Unit for each IU for each Interconnector ID | Electronic Data File |
3.1.2 | Following 3.1.1 | Ascertain whether BM Unit Metered Volumes have been received If missing go to step 3.1.3 Received process complete | SAA | | | Internal |
3.1.3 | By end of the WD next following SD | If missing, request resubmission of data from IA | SAA | IA | Expected Transfer for each Interconnector BM Unit for each IU for each Interconnector ID | Telephone / Email |
3.1.4 | Following 3.1.3 | Submit BM Unit Metered Volumes | IA | SAA | Expected Transfer for each Interconnector BM Unit for each IU for each Interconnector ID | Electronic Data File |
3.1.5 | By 10:00 hrs on the 3rd WD following SD | If BM Unit Metered Volumes are still missing, contact BSCCo for resolution of the issue | SAA | BSCCo | | Telephone |
3.1.6 | After the Interim Information Settlement Run following SD, if required by the IA. | Notify BSCCo of intention to submit revised BM Unit Metered Volumes | IA | BSCCo | Details of requirement to revise BM Unit Metered Volumes | Telephone / Email |
3.1.7 | Following 3.1.6, if required | Submit revised BM unit Metered Volumes | IA | SAA | Revised BM Unit Metered Volumes | Electronic Data File |
AMENDMENT RECORD – BSCP04
VERSION | DATE | DESCRIPTION OF CHANGES | CRs INCLUDED | MODS PANEL REF |
1.0 | Code Effective Date | Designated Version | n/a | n/a |
2.0 | 30/11/2000 | Work outstanding at Go Active, resolution of inconsistencies, inclusion of consultation comments | 218 | 08/009 |
3.0 | 13/08/2002 | Change Proposal for BSC Systems Release 2 | CP598 | ISG 16/166 |
4.0 | 30/06/2004 | Change Proposal for the CVA Programme June 04 Release | CP916 | ISG/40/003 |
4.1 | 01/04/2005 | Feb05 Release stage 3 | BETTA 6.3 | |
5.0 | BETTA Effective Date | BETTA 6.3 rebadging for the CVA Feb 05 Release | BETTA 6.3 | |
Intellectual Property Rights and Copyright - This document contains materials the copyright and other intellectual property rights in which are vested in ELEXON Limited or which appear with the consent of the copyright owner. These materials are made available for you to review and to copy for the purposes of your establishment or operation of or participation in electricity trading arrangements under the Balancing and Settlement Code ("BSC"). All other commercial use is prohibited. Unless you are a person having such an interest in electricity trading under the BSC you are not permitted to view, download, modify, copy, distribute, transmit, store, reproduce or otherwise use, publish, licence, transfer, sell or create derivative works (in whatever format) from this document or any information obtained from this document otherwise than for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the original material must be retained on any copy that you make. All other rights of the copyright owner not expressly dealt with above are reserved.
Disclaimer - No representation, warranty or guarantee is made that the information provided is accurate, current or complete. Whilst care is taken in the collection and provision of this information, ELEXON Limited will not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or any decision made or action taken in reliance on this information.