CONTENTS
- Purpose
- BSC requirements
- Which flows of electricity need to be measured for Settlement purposes?
- What is a Boundary Point?
- What is a Systems Connection Point?
- Who is responsible for an Import/Export at a Boundary Point?
- Who is responsible for flows of electricity at an Offshore Transmission Connection Point?
- Where exactly are measurements required to be made for Settlements purposes?
- Additional information on Primary BM Units and Trading Units
- Transmission System Connected Offshore Wind Farm
- Distribution System Connected Offshore Wind Farm
- CoP1 (single busbar): using busbar voltage transformers at a Transmission System Connected Offshore Wind Farm
- CoP1 (electrically split busbar): using busbar voltage transformers at a Transmission System Connected Offshore Wind Farm
- CoP2 (single busbar): using busbar voltage transformers at a Transmission System Connected Offshore Wind Farm
- CoP2 (electrically split busbar): using busbar voltage transformers at a Transmission System Connected Offshore Wind Farm
- Need more information?
Settlement Metering for Offshore Wind Farms V5.0
Effective From Date:16/06/2023
Status:SUPERSEDED
Other versions
Download