CONTENTS

  • Purpose
    • BSC requirements
      • Which flows of electricity need to be measured for Settlement purposes?
      • What is a Boundary Point?
      • What is a Systems Connection Point?
      • Who is responsible for an Import/Export at a Boundary Point?
      • Who is responsible for flows of electricity at an Offshore Transmission Connection Point?
      • Where exactly are measurements required to be made for Settlements purposes?
      • Additional information on Primary BM Units and Trading Units
      • Transmission System Connected Offshore Wind Farm
      • Distribution System Connected Offshore Wind Farm
    • Need more information?

Settlement Metering for Offshore Wind Farms V4.0

Effective From Date:28/02/2019
Status:SUPERSEDED
Other versions
Download