CONTENTS

  • 1. SCOPE
  • 2. REFERENCES
  • 3. DEFINITIONS AND INTERPRETATIONS
    • 3.1 Active Energy *
    • 3.2 Active Power *
    • 3.3 Apparent Energy ‡
    • 3.4 Apparent Power ‡
    • 3.5 Defined Metering Point ‡
    • 3.6 Demand Period ‡
    • 3.7 Demand Values ‡
    • 3.8 electricity *
    • 3.9 Export *
    • 3.10 Import *
    • 3.11 Interrogation Unit ‡
    • 3.12 Maximum Demand †
    • 3.13 Meter *
    • 3.14 Metering Equipment *
    • 3.15 Meter Register ‡
    • 3.16 Outstation *
    • 3.17 Offshore Platform
    • 3.18 Offshore Power Park Module
    • 3.19 Outstation System ‡
    • 3.20 Reactive Energy *
    • 3.21 Reactive Power *
    • 3.22 Registrant *
    • 3.23 Settlement Instation ‡
    • 3.24 SVA Customer *
    • 3.25 UTC *
  • 4. MEASUREMENT CRITERIA
    • 4.1 Measured Quantities and Demand Values
      • 4.1.1 Measured Quantities
      • 4.1.2 Demand Values
    • 4.2 Accuracy Requirements
      • 4.2.1 Overall Accuracy
  • 5. METERING EQUIPMENT CRITERIA
    • 5.1 Current Transformers
    • 5.2 Fusing and Test Facilities
    • 5.3 Meters
    • 5.4 Displays and Facilities for Registrant Information
      • 5.4.1 Displays
    • 5.5 Outstation
      • 5.5.1 Data Storage
      • 5.5.2 Time Keeping
      • 5.5.3 Monitoring Facilities
    • 5.6 Security Regime
    • 5.7 Communications
      • 5.7.1 Local Interrogation
      • 5.7.2 Remote Interrogation
    • 5.8 Appropriate Seals
  • 6. ACCESS TO DATA
    • APPENDIX A DEFINED METERING POINTS

Code of Practice10: The Metering of Energy via Low Voltage Circuits for Settlement Purposes V9.0

Effective From Date:25/02/2016
Status:SUPERSEDED