HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice10 The Metering of Energy Via ...Code of Practice10 The Metering of Energy Via ... V 10 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy *
- 3.2 Active Power *
- 3.3 Apparent Energy ‡
- 3.4 Apparent Power ‡
- 3.5 Defined Metering Point ‡
- 3.6 Demand Period ‡
- 3.7 Demand Values ‡
- 3.8 electricity *
- 3.9 Export *
- 3.10 Import *
- 3.11 Interrogation Unit ‡
- 3.12 Maximum Demand †
- 3.13 Meter *
- 3.14 Metering Equipment *
- 3.15 Meter Register ‡
- 3.16 Outstation *
- 3.17 Offshore Platform
- 3.18 Offshore Power Park Module
- 3.19 Outstation System ‡
- 3.20 Reactive Energy *
- 3.21 Reactive Power *
- 3.22 Registrant *
- 3.23 Settlement Instation ‡
- 3.24 SVA Customer *
- 3.25 UTC *
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values
- 4.1.1 Measured Quantities
- 4.1.2 Demand Values
- 4.2 Accuracy Requirements
- 4.2.1 Overall Accuracy
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Current Transformers
- 5.2 Fusing and Test Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant Information
- 5.4.1 Displays
- 5.5 Outstation
- 5.5.1 Data Storage
- 5.5.2 Time Keeping
- 5.5.3 Monitoring Facilities
- 5.6 Security Regime
- 5.7 Communications
- 5.7.1 Local Interrogation
- 5.7.2 Remote Interrogation
- 5.8 Appropriate Seals
- 6. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
Code of Practice10: The Metering of Energy via Low Voltage Circuits for Settlement Purposes V10.0
Effective From Date:02/11/2017
Status:SUPERSEDED
Other versions
Download