CONTENTS

  • 1. SCOPE
  • 2. REFERENCES
  • 3. DEFINITIONS AND INTERPRETATIONS
    • 3.1 Active Energy
    • 3.2 Active Power
    • 3.3 Actual Metering Point
    • 3.4 Apparent Energy
    • 3.5 Apparent Power
    • 3.6 CTN
    • 3.7 CVA
    • 3.8 CVA Customer
    • 3.9 Defined Metering Point
    • 3.10 Demand Period
    • 3.11 Demand Values
    • 3.12 electricity
    • 3.13 Export
    • 3.14 Import
    • 3.15 Interrogation Unit
    • 3.16 Maximum Aggregated Capacity
    • 3.17 Meter
    • 3.18 Metering Equipment
    • 3.19 Meter Register
    • 3.20 Outstation
    • 3.21 Outstation System
    • 3.22 PARh Meter
    • 3.23 Password
    • 3.24 PSTN
    • 3.25 Rated Measuring Current
    • 3.26 Reactive Energy
    • 3.27 Reactive Power
    • 3.28 Registrant
    • 3.29 Settlement Instation
    • 3.30 SVA
    • 3.31 SVA Customer
    • 3.32 UTC
  • 4. MEASUREMENT CRITERIA
    • 4.1 Measured Quantities and Demand Values
      • 4.1.1 Measured Quantities
      • 4.1.2 Demand Values
    • 4.2 Accuracy Requirements
      • 4.2.1 Overall Accuracy
      • 4.2.2 Compensation for Measurement Transformer Error
      • 4.2.3 Compensation for Power Transformer and Line Losses
  • 5. METERING EQUIPMENT CRITERIA
    • 5.1 Measurement Transformers
      • 5.1.1 Current Transformers
      • 5.1.2 Voltage Transformers
      • 5.1.3 Monitoring of Voltage Transformers
      • 5.1.4 Measurement Transformers Installed on Existing Circuits
    • 5.2 Testing Facilities
    • 5.3 Meters
    • 5.4 Displays and Facilities for Registrant or Supplier Information
      • 5.4.1 Displays
      • 5.4.2 Facilities
    • 5.5 Outstation
      • 5.5.1 Data Storage
      • 5.5.2 Time Keeping
      • 5.5.3 Monitoring Facilities
    • 5.6 Communications
      • 5.6.1 Local Interrogation
      • 5.6.2 Remote Interrogation
    • 5.7 Sealing
  • 6. ASSOCIATED FACILITIES
    • 6.1 Interrogation Unit
    • 6.2 Additional Features
  • 7. ACCESS TO DATA
    • APPENDIX A DEFINED METERING POINTS
    • APPENDIX B LABELLING OF METERS FOR IMPORT AND EXPORT
    • APPENDIX C FUSING
    • APPENDIX D PASSWORDS
    • APPENDIX E GUIDANCE FOR THE USE OF MULTI CORE METERING CABLES

Code of Practice 2: The Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes V3.0

Effective From Date:23/02/2006
Status:SUPERSEDED
Other versions