CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
      • 1.1.1 MSID Pair allocation
      • 1.1.2 Supporting the calculation of network charges
      • 1.1.3 Baselined BM Units
    • 1.2 Main Users of the Procedure
    • 1.3 Use of Procedure
    • 1.4 Balancing and Settlement Code Provisions
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
  • 2. Interface and Timetable Information
    • 2.1 MSID Pair Allocation Notification
    • 2.1A AMSID Pair Allocation to a Secondary BM Unit
    • 2.2B MSID Pair Delivered Volume Notification by the NETSO
    • 2.3 Disputed MSID Pair Allocation or Disputed AMSID Pair Allocation Resolution
    • 2.5 SVA Non-Final Demand Facilities – voluntary withdrawal of an SVA Non-Final Demand declaration17
    • 2.6 SVA Non-Final Demand Facilities – enforced withdrawal of an SVA Non-Final Demand Facility’s declaration20
    • 2.7 SVA Non- Final Demand Facilities – withdrawal of an SVA Non- Final Demand Operator24
    • 2.8 SVA Non-Final Demand Facilities – update following Change Of Supplier, Change of Agent or change of the Metering Systems registered for the Non-Final Demand Facility25
    • 2.9 Asset Registration
    • 2.10 Registration of AMVLP Agents for Asset Metering System(s)
    • 2.11 Registration of Asset Meter Details for an Asset and related Asset Metering Systems
    • 2.12 BM Unit Allocation Baselining Detail
    • 2.13 BM Unit Submitted Expected Volumes
    • 2.14 BM Unit Allocation Event Day
  • 3 Appendices
    • 3.1 Validation of MSID Pair and AMSID Pair Allocation File
    • 3.2 Amendments to MSID Pair Allocation or an AMSID Pair Allocation
    • 3.3 Disputed MSID Pair or AMSID Pair Allocation Resolution
    • 3.4 MSID Pair Delivered Volume or AMSID Pair Delivered Volume Notification
    • 3.5 Validation of MSID Pair Delivered Volume or AMSID Pair Delivered Volume Files
    • 3.6 Allocation of MSID Pair Delivered Volumes, AMSID Pair Delivered Volumes and ABS MSID Pair Delivered Volumes
    • 3.7 SVA Non-Final Demand Facilities
      • 3.7.1 Submission and validation of SVA Non-Final Demand Facility Declarations
      • 3.7.2 No Longer Used
      • 3.7.3 F602/01 SVA Non-Final Demand Facility Declaration Document form – Supplier
      • 3.7.4 Non-Final Demand Facility Operator Withdrawal Letter template – F602/02
    • 3.9 Definitions of Asset Metering and Asset Differencing
    • 3.10 Valid combinations of ‘MSID Pair Indicator’ and ‘AMSID Pair Asset Differencing Indicator’ in a Secondary BM Unit
    • 3.11 Shared use of MSID Pairs
    • 3.12 Effect of Proposed AMSID Pair use in AMSID Pair Allocations
    • 3.13 Validation of Baselined or Inactive MSID Pair and AMSID Pair Files

BSCP602: SVA Metering System & Asset Metering System Register V6.0

Effective From Date:29/06/2023
Status:SUPERSEDED