CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
      • 1.1.1 MSID Pair and AMSID Pair allocation
      • 1.1.2 Supporting the calculation of network charges
      • 1.1.3 Baselined BM Units
    • 1.2 Main Users of the Procedure
    • 1.3 Use of Procedure
    • 1.4 Balancing and Settlement Code Provisions
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
  • 2. Interface and Timetable Information
    • 2.1 MSID Pair Allocation Notification
    • 2.1A AMSID Pair Allocation to a Secondary BM Unit
    • 2.2B MSID Pair Delivered Volume Notification by the NETSO
    • 2.3 Disputed MSID Pair Allocation or Disputed AMSID Pair Allocation Resolution
    • 2.5 SVA Non-Final Demand Facilities – voluntary withdrawal of an SVA Non-Final Demand declaration22
    • 2.6 SVA Non-Final Demand Facilities – enforced withdrawal of an SVA Non-Final Demand Facility’s declaration25
    • 2.7 SVA Non- Final Demand Facilities – withdrawal of an SVA Non- Final Demand Operator29
    • 2.8 SVA Non-Final Demand Facilities – update following Change of Supplier or change of the Metering Systems registered for the Non-Final Demand Facility30
    • 2.9 Asset Registration
    • 2.10 Registration of Asset Metering Agents for Asset Metering System(s)
    • 2.11 Registration of Asset Meter Details for an Asset and related Asset Metering Systems
    • 2.12 BM Unit Allocation Baselining Detail
    • 2.13 BM Unit Submitted Expected Volumes
    • 2.14 BM Unit Allocation Event Day
    • 2.15 Submission of EMR Declarations
    • 2.16 Voluntary withdrawal of an EMR Declaration
    • 2.17 Enforced withdrawal of an EMR Declaration
    • 2.18 Wholesale market Activity Notifications
  • 3. Appendices
    • 3.1 Validation of MSID Pair and AMSID Pair Allocation File
    • 3.2 Amendments to MSID Pair Allocation or an AMSID Pair Allocation
    • 3.3 Disputed MSID Pair or AMSID Pair Allocation Resolution
    • 3.4 MSID Pair Delivered Volume or AMSID Pair Delivered Volume Notification
    • 3.5 Validation of MSID Pair Delivered Volume or AMSID Pair Delivered Volume Files
    • 3.6 Allocation of MSID Pair Delivered Volumes, AMSID Pair Delivered Volumes and ABS MSID Pair Delivered Volumes
    • 3.7 SVA Non-Final Demand Facilities
      • 3.7.1 Submission and validation of SVA Non-Final Demand Facility Declarations
      • 3.7.2 No Longer Used
      • 3.7.3 F602/01 SVA Non-Final Demand Facility Declaration Document form – Supplier
      • 3.7.4 Non-Final Demand Facility Operator Withdrawal Letter template – F602/02
    • 3.9 Definitions of Asset Metering and Asset Differencing
    • 3.10 Valid combinations of ‘MSID Pair Indicator’ and ‘AMSID Pair Asset Differencing Indicator’ in a Secondary BM Unit
    • 3.11 Shared use of MSID Pairs
    • 3.12 Effect of Proposed AMSID Pair use in AMSID Pair Allocations
    • 3.13 Validation of Baselined or Inactive MSID Pair and AMSID Pair Files
    • 3.14 EMR Declarations
      • 3.14.1 Submission and validation of EMR Declarations
      • 3.14.2 Validation of EMR Declarations:
      • 3.14.3 Validation of EMR MSID Declarations:
      • 3.14.4 Validation of EMR AMSID Declarations
      • 3.14.5 Validation of EMR CVA BM Unit Declarations:
      • 3.14.6 Change of details for an existing EMR Declaration
      • 3.14.7 Enforced Withdrawal of an EMR Declaration
      • 3.14.8 Director’s Declaration of Generation
      • 3.14.9 F602/04 EMR MSID Declaration form
    • 3.15 Validation of and retrieval of Supplier and HHDA50 details for MSIDs

BSCP602: SVA Metering System & Asset Metering System Register V10.0

Effective From Date:27/11/2025
Status:LIVE
Other versions
Download Forms
Download