HomeRulebook HomeBalancing and Settlement CodeBSC ProceduresBSCp515 Licensed DistributionBSCp515 Licensed Distribution V 22 0
CONTENTS
- 1. Introduction
- 1.1 Purpose and Scope of the Procedure
- 1.2 Main Users of Procedure and their Responsibilities
- 1.3 Use of the Procedure
- 1.4 Balancing and Settlement Code Provision
- 1.5 Associated BSC Procedures
- 1.6 Acronyms and Definitions
- 1.6.1 Acronyms
- 1.6.2 Definitions
- 2. Not Used
- 3. Interface and Timetable Information
- 3.1 Not used
- 3.2 Not used
- 3.3 New SVA Metering System
- 3.3.A New SVA Metering System – Commissioning of Measurement Transformers
- 3.4 New CVA Metering System
- 3.5 Energisation of a Metering System (SVA Only)11
- 3.6 De-energisation of a Metering System (SVA Only)14
- 3.7 Disconnection of a SVA Metering System
- 3.8 Disconnection of a CVA Metering System
- 3.9 Not Used
- 3.10 Update of the National Measurement Transformer Error Statement22
- 3.10.1 Addition to the National Measurement Transformer Error Statement
- 3.11 Change of Measurement Class (SVA only) from NHH to HH Metering System and vice versa
- 3.12 On the installation of Small Scale Third Party Generating Plant
- 3.13 Request EAC Data to Distributor Report (Optional)
- 3.14 Demand Control Events
- 3.15 Submission of the Current Transformer (CT) and/or Voltage Transformer (VT) ratios for inclusion (or removal) in the BSCCo valid set25
- 3.16 Monthly TUoS Residual Charges Billing Report
- 3.17 Annual TUoS Residual Charges Tariff Setting Report
- 4. Appendices
- 4.1 Update of the National Measurement Error Transformer Statement
- 4.1.1 CT or VT Error Data Form
- 4.2 Analysis of CT or VT Data by BSCCo.
- 4.2.1 CT Data
- 4.2.2 VT Data
- 4.3 Communication of MSIDs following Demand Control Event
- 4.4 Validation of Measurement Transformer Ratios
- 4.5 Monthly TUoS Residual Charges Billing Report
- 4.6 Ann ual TUoS Residual Charges Tariff Setting Report
BSCP515 Licensed Distribution V22.0
Effective From Date:29/06/2023
Status:SUPERSEDED
Other versions
Download Forms
Download