CONTENTS

  • 1. Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of Procedure and their Responsibilities
    • 1.3 Use of the Procedure
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
      • 1.6.1 Acronyms
      • 1.6.2 Definitions
  • 2. Not Used
  • 3. Interface and Timetable Information
    • 3.1 Not used
    • 3.2 Not used
    • 3.3 New SVA Metering System
      • 3.3.A New SVA Metering System – Commissioning of Measurement Transformers
    • 3.4 New CVA Metering System
    • 3.5 Energisation of a Metering System (SVA Only)9
    • 3.6 De-energisation of a Metering System (SVA Only)12
    • 3.7 Disconnection of a SVA Metering System
    • 3.8 Disconnection of a CVA Metering System
    • 3.9 Changes to Site Technical Details
    • 3.10 Update of the National Measurement Transformer Error Statement20
      • 3.10.1 Addition to the National Measurement Transformer Error Statement
    • 3.12 On the installation of Small Scale Third Party Generating Plant
    • 3.13 Request EAC Data to Distributor Report (Optional)
    • 3.14 Demand Control Events
    • 3.15 Submission of the Current Transformer (CT) and/or Voltage Transformer (VT) ratios for inclusion (or removal) in the BSCCo valid set23
    • 3.16 Monthly TUoS Residual Charges Billing Report
    • 3.17 Annual TUoS Residual Charges Tariff Setting Report
  • 4. Appendices
    • 4.1 Update of the National Measurement Error Transformer Statement
      • 4.1.1 CT or VT Error Data Form
    • 4.2 Analysis of CT or VT Data by BSCCo.
      • 4.2.1 CT Data
      • 4.2.2 VT Data
    • 4.3 Communication of MSIDs following Demand Control Event
    • 4.4 Validation of Measurement Transformer Ratios
    • 4.5 Monthly TUoS Residual Charges Billing Report
    • 4.6 Annual TUoS Residual Charges Tariff Setting Report
    • AMENDMENT RECORD – BSCP515

BSCP515 Licensed Distribution V24.0

Effective From Date:01/10/2024
Status:LIVE
Other versions
Download Forms
Download