CONTENTS

  • 1. Introduction
    • 1.1 Purpose and Scope of the Procedure
      • 1.1.1 Use of the Self-Service Gateway
    • 1.2 Main Users of the Procedure and their Responsibilities
    • 1.3 Key Milestones
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 NETSO Registration Requirements
    • 1.7 BSC Website list of Suppliers which have satisfied the criteria to complete a change of Primary BM Unit Lead Party within 5WDs for a Primary BM Unit with CVA metering and associated with a Customer premises
    • 1.8 Obligations
    • 1.9 Primary BM Units for CFD or CM Assets
  • 2. Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3. Interface and Timetable Information
    • 3.1 Registration of Primary BM Unit Associated with Metering Systems Registered with the CRA3
    • 3.2 Registration of Interconnector Primary BM Units
    • 3.3 Notification of a New Supplier or Supplier ID and Base Primary BM Unit IDs
    • 3.4 Registration of Additional Primary BM Unit (Supplier Only)
    • 3.5 De-Registration of Primary BM Unit Excluding Base Primary BM Unit
    • 3.6 De-Registration of Supplier Primary BM Units following Cessation of Supplier
    • 3.7 Registration of Seasonal Estimates of Maximum Positive Magnitude and Maximum Negative Magnitude Primary BM Unit Metered Volume
    • 3.8 Mid-Season Changes of Generation Capacity and Demand Capacities by the Lead Party
    • 3.9 GC and DC Breach Monitoring by CRA and GC or DC Estimation Challenges by the Lead Party
    • 3.10 Application for Exemptable Generating Plant Status and Exempt Export Status for the Associated Primary BM Unit(s)
    • 3.11 Termination of Exempt Export Status for a Primary BM Unit
    • 3.12 Change of Production / Consumption Status for an Exempt Export Primary BM Unit by the Lead Party
    • 3.13 Change of CVA Primary BM Unit Lead Party
    • 3.14 Transfer of Supplier ID Process (Change of SVA Primary BM Units Ownership)
    • 3.15 Process for Parties to Apply for Inclusion in BSC Website List of Suppliers which have Satisfied the Criteria to Complete a Change of Primary BM Unit Lead Party within 5 WDs for a Primary BM Unit with CVA Metering and Associated with a Customer Premises
    • 3.16 Not Used
    • 3.17 Not Used
    • 3.18 Registration of Additional Primary BM Units for CFD Assets
    • 3.19 De-Registration of Additional Primary BM Units for CFD
    • 3.20 Additional Primary BM Unit Sets for CFD
    • 3.21 Registration of Secondary BM Units
    • 3.22 De-registration of a Secondary BM Unit
    • 3.23 Change of Production / Consumption Status for a Secondary BM Unit by the Virtual Lead Party or Asset Metering Virtual Lead Party
    • 3.24 Reconfiguration of BM Unit Associated with Metering Systems Registered with the CRA
  • 4. Appendices
    • 4.1 BSCP15/4.1 Registration of Primary BM Unit for a CVA Metering System53
    • 4.2 BSCP15/4.2 De-Registration of Primary BM Unit Page 1 of 1
    • 4.3 BSCP15/4.3 Registration of Seasonal Estimates of the Maximum Positive and Negative Primary BM Unit Metered Volume
    • 4.4 BSCP15/4.4 Mid-Season Changes of Positive and Negative Primary BM Unit Metered Volume Estimates
    • 4.5 BSCP15/4.5 Application for Exemptable Generating Plant Status
    • 4.6 BSCP15/4.6 Notification of a Supplier ID Transfer
    • 4.7 BSCP15/4.7 Commencement / Termination of Exempt Export Primary BM Unit Status
    • 4.8 BSCP15/4.8 Election of Production / Consumption Flag for Exempt Export Primary BM Unit or Secondary BM Unit
    • 4.9 BSCP15/4.9 Certification of Exemptable Status for Generating Plant With Exports Measured by SVA Metering Systems
    • 4.10 BSCP15/4.10 Application for Inclusion in BSC Website List of Suppliers which have Satisfied the Criteria to Complete a Change of Primary BM Unit Lead Party within 5 WD for a Primary BM Unit with CVA Metering and Associated with a Customer Premises
    • 4.11 BSCP15/4.11 Change of CVA Primary BM Unit Lead Party (CoPBLP)
    • 4.12 Not Used
    • 4.13 BSCP15/4.13 Application for Non-Standard Primary BM Unit
    • 4.14 BSCP15/4.14 Registration of Secondary BM Unit
    • 4.15 BSCP15/4.15 De-Registration of Secondary BM Unit

BSCP 15: BM Unit Registration V32.0

Effective From Date:30/06/2022
Status:SUPERSEDED
Other versions
Download Forms
Download