CONTENTS

  • 1. Introduction
    • 1.1 Purpose and Scope of the Procedure
      • 1.1.1 Use of the Self-Service Gateway
      • 1.1.2 Baselined Additional or Secondary BM Units
    • 1.2 Main Users of the Procedure and their Responsibilities
    • 1.3 Key Milestones
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 NETSO Registration Requirements
    • 1.7 BSC Website list of Suppliers which have satisfied the criteria to complete a change of Primary BM Unit Lead Party within 5WDs for a Primary BM Unit with CVA metering and associated with a Customer premises
    • 1.8 Obligations
    • 1.9 Primary BM Units for CFD or CM Assets
  • 2. Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3. Interface and Timetable Information
    • 3.1 Registration of Primary BM Unit Associated with Metering Systems Registered with the CRA4
    • 3.2 Registration of Interconnector Primary BM Units
    • 3.3 Notification of a New Supplier or Supplier ID and Base Primary BM Unit IDs
    • 3.4 Registration of Additional Primary BM Unit (Supplier Only)
    • 3.5 De-Registration of Primary BM Unit Excluding Base Primary BM Unit
    • 3.6 De-Registration of Supplier Primary BM Units following Cessation of Supplier
    • 3.7 Registration of Seasonal Estimates of Maximum Positive Magnitude and Maximum Negative Magnitude for Primary BM Unit Metered Volume and Maximum Positive and Maximum Negative Deviation Volumes for Trading Secondary BM Units
    • 3.8 Mid-Season Changes of Generation Capacity and Demand Capacities by the Lead Party, and Maximum Positive and Maximum Negative Deviation Volumes for Trading Secondary BM Units
    • 3.9 GC and DC Breach Monitoring by CRA and GC or DC Estimation Challenges by the Lead Party
    • 3.10 Application for Exemptable Generating Plant Status and Exempt Export Status for the Associated Primary BM Unit(s)
    • 3.11 Termination of Exempt Export Status for a Primary BM Unit
    • 3.12 Change of Production / Consumption Status for an Exempt Export Primary BM Unit or Storage BM Unit by the Lead Party
    • 3.13 Change of CVA Primary BM Unit Lead Party
    • 3.14 Transfer of Supplier ID Process (Change of SVA Primary BM Units Ownership)
    • 3.15 Process for Parties to Apply for Inclusion in BSC Website List of Suppliers which have Satisfied the Criteria to Complete a Change of Primary BM Unit Lead Party within 5 WDs for a Primary BM Unit with CVA Metering and Associated with a Customer Premises
    • 3.16 Not Used
    • 3.17 Not Used
    • 3.18 Registration of Additional Primary BM Units for CFD Assets
    • 3.19 De-Registration of Additional Primary BM Units for CFD
    • 3.20 Additional Primary BM Unit Sets for CFD
    • 3.21 Registration of Secondary BM Units or Trading Secondary BM Units
    • 3.22 De-registration of a Secondary BM Unit or Trading Secondary BM Unit
    • 3.23 Change of Production / Consumption Status for a Secondary BM Unit other than a Trading Secondary BM Unit by the Virtual Lead Party or Asset Metering Virtual Lead Party
    • 3.24 Reconfiguration of BM Unit Associated with Metering Systems Registered with the CRA
  • 4. Appendices
    • 4.1 BSCP15/4.1 Registration of Primary BM Unit for a CVA Metering System54
    • 4.2 BSCP15/4.2 De-Registration of Primary BM Unit Page 1 of 1
    • 4.3 BSCP15/4.3 Registration of Seasonal Estimates of the Maximum Positive and Negative Primary BM Unit Metered Volume and Maximum Positive and Maximum Negative Deviation Volumes for Trading Secondary BM Units
    • 4.4 BSCP15/4.4 Mid-Season Changes of Positive and Negative Primary BM Unit Metered Volume Estimates and Maximum Positive and Maximum Negative Deviation Volumes for Trading Secondary BM Units
    • 4.5 BSCP15/4.5 Application for Exemptable Generating Plant Status
    • 4.6 BSCP15/4.6 Notification of a Supplier ID Transfer
    • 4.7 BSCP15/4.7 Commencement / Termination of Exempt Export Primary BM Unit Status
    • 4.8 BSCP15/4.8 Election of Production / Consumption Flag for Exempt Export Primary BM Unit, Storage BM Unit or Secondary BM Unit
    • 4.9 BSCP15/4.9 Certification of Exemptable Status for Generating Plant With Exports Measured by SVA Metering Systems
    • 4.10 BSCP15/4.10 Application for Inclusion in BSC Website List of Suppliers which have Satisfied the Criteria to Complete a Change of Primary BM Unit Lead Party within 5 WD for a Primary BM Unit with CVA Metering and Associated with a Customer Premises
    • 4.11 BSCP15/4.11 Change of CVA Primary BM Unit Lead Party (CoPBLP)
    • 4.12 Not Used
    • 4.13 BSCP15/4.13 Application for Non-Standard Primary BM Unit
    • 4.14 BSCP15/4.14 Registration of Secondary BM Unit or Trading Secondary BM Unit
    • 4.15 BSCP15/4.15 De-Registration of Secondary BM Unit or Trading Secondary BM Unit
  • AMENDMENT RECORD – BSCP15

BSCP 15: BM Unit Registration V37.0

Effective From Date:02/05/2025
Status:LIVE
Other versions