High Grade Participant FTP Testing Guidance | |||
| |||
| |||
Customer | : | ELEXON | |
Contract number | : |
| |
Business/project number | : | GIS34511 | |
Project Manager | : | Martin Wiles | |
Reporting to | : | Chris Beale | |
Project/document reference | : | IF-00000846 | |
Issue | : | 1.1 | |
Issue date | : | 01/12/14 | |
Status | : | Definitive | |
Distribution | : | As per distribution list on page 2 | |
|
|
| |
|
|
| |
|
|
| |
Prepared by | : | Sam Daniel | Author Date: |
Approved (CGI) | : | Martin Wiles | Service Provision Manager Date: |
Approved (CGI) | : | Chris Beale | Service Delivery Manager Date: |
Authorised (CGI) | : |
| Programme Director Date: |
Accepted (ELEXON) | : |
| Role Date: |
Name | Role |
---|---|
Andrew Alcock | Configuration Manager |
Martin Wiles | Service Provision Manager |
Sam Daniel | Infrastructure Analyst |
Andrew McDonald | Infrastructure Analyst |
Chris Beale | Service Delivery Manager |
Name/Role | Organisation |
---|---|
UKEST Programme Library | CGI |
Date | issue | description | author | OR no. |
---|---|---|---|---|
21/09/2000 | 0.1 | First draft | Chris Hill | N/A |
27/09/2000 | 0.2 | Review Comments | Chris Hill | N/A |
28/09/2000 | 1.0 | Final Version | Chris Hill | N/A |
01/12/2014 | 1.1 | Maintenance Update | Sam Daniel | N/A |
Procuring communication lines as instructed by ELEXON. CGI will sub-contract Vodafone to perform the physical installation of the communication lines and will manage Vodafone accordingly.
Communicating, to participant IP addresses and FTP account details of the BSC Central services.
Overall management of the process.
Specifying the tests between participant and the BSC central services.
Creating test files for transmission to and from participant systems.
Executing the tests at CGI end.
Validating data files received from participants.
Collation of testing success / failures provided by CGI and the participant to provide an overall test status.
Supporting queries from the participants and resolving issues on the content of the files exchanged and the progress of the test.
For the connection of the router to the participant’s Local Area Network (via a firewall if this is required by the participant), i.e. the boundary is the port on the LAN side of the router.
The participant will be responsible for performing a test FTP transfer to the BSC central servers.
Generating files where required and transferring files back to BSC central servers.
Resolving issues that are raised during testing, within their own systems.
Participant connects to the BSC FTP server (IP and log in details to be communicated) and performs the following tasks:
FTP connect to BSC Central server
cd temp
FTP “put” file in to temp
Rename file to ../inbox
CGI to verify and compare the file size uploaded in the inbox for any discrepancies.
CGI to upload file on the BSC FTP server
FTP connect to BSC Central server
cd temp
FTP “put” file in to temp
Rename file to ../outbox
Participant connects to the BSC FTP server.
FTP connect to BSC Central server
cd outbox
FTP “get” file from outbox
Delete file from outbox
Participant to verify and compare the downloaded file size.