Network Gas Supply Emergency Acceptances Guidance Note |
|
Guidance Note: Network Gas Supply Emergency Acceptances
Where a BM Unit includes Generation plant which has been notified of a Load Shedding instruction from the Gas System Operator (GSO) during a Stage 2 or 3 Network Gas Supply Emergency (a “gas curtailment”), it is likely that that the BM Unit will be unable to generate, and, if the generator had already sold that power, the Lead Party of the BM Unit would be exposed to a potentially unmanageable Imbalance Charge, especially if the gas curtailment lasts for longer than just a few Settlement Periods. To mitigate this risk, the Load Shedding instruction will be treated as a type of Bid for BSC purposes.
Acceptance Data relating to these Network Gas Supply Emergency Acceptances (NGSEA) will be processed in two stages:
Directly following a Load Shedding Instruction, NGESO will construct BOA(s) which reflect the effect of the Load Shedding instruction on the Generator and submit them into Settlement; and
At a time after the event, a Panel Committee will review all evidence provided by the Lead Party and any Subsidiary Parties to any BM Units impacted by the Load Shedding Instruction, and may direct further changes to Settlement data relating to those BM Units.
Initial Settlement of NGSEAs
A Load Shedding Instruction from the Gas System Operator - NGSEA) - will be settled initially as one or more Bids.
This will ensure that the Lead Party and any Subsidiary Parties of a BM unit affected by a gas curtailment would not be subject to imbalance charges, which could be extremely large and so could result in those parties becoming insolvent.
NGESO will construct a BOA (or BOAs if the gas curtailment is sufficiently lengthy) to action the NGSEA, which will effectively bring the FPN for that BM Unit down from the submitted value to the revised level following the gas curtailment – usually this would be either ‘0 MW’ or the Stable Export Limit (SEL) for the BM Unit.
NGESO would use ‘best endeavours’ to submit each BOA to the SAA by the end of the second full working day after the initial Settlement Period affected by the gas curtailment (‘D + 2’), and no later than by ‘D + 3’, so that the BOA(s) will be processed in the Interim Information (II) Settlement Run for that Settlement Date, ensuring that no imbalance charges would accrue as a result of the BM Unit being unable to generate power sold before the gas curtailment.
Elexon’s credit-monitoring processes will not ‘know’ about the Acceptances until they are processed in the II Settlement Run. Prior to that, the Credit Cover Percentages for the affected Lead Party and/or Subsidiary Parties may increase, as Metered Data shows the BM Units were not generating. Elexon is obliged (in accordance with Section M3.4.3C of the BSC) to take the gas curtailment into account, and not authorise placing the Parties into Credit Default if any apparent shortage of Credit Cover is caused by the gas curtailment.
If, for any reason, BOA(s) could not be entered into SAA in time to be processed in the II
Settlement Run, Elexon would continue to ensure that the
Lead Party and/or
Subsidiary Parties were not inappropriately placed into
Credit Default as a result of the gas curtailment (as per BSC Section M3.4.3C). The BOA(s) would be loaded before the
Initial Settlement Run (SF), which would ensure that Parties were not invoiced for inappropriate Imbalance Charges as a result of the gas curtailment. The BOA(s) would be processed in accordance with Section 3.4 of
BSCP18 “Corrections to Bid-Offer Acceptance Related Data”.
Subsequent review of NGSEAs
After an NGSEA has been received and processed by the SAA, each BOA entered into Settlement will be reviewed by the Network Gas Supply Emergency Settlement Validation Committee (NGSESVC) Panel Committee.
The NGSESVC will be empowered to direct that changes be made to any P448 BOA. Any such changes shall be entered into Settlement before the Final Reconciliation Settlement Run (RF) for the relevant Settlement Date. Please note that a post-SF amendment to a P448 BOA would not require a Trading Dispute be raised to implement it, unlike other Emergency BOAs which are processed in accordance with BSCP18.
What should I do if a power station in my BM Unit receives a Load Shedding instruction?
If a power station in your BM Unit receives a Load Shedding instruction, there are several things that you should do:
You must tell the market what’s happened through MEL re-declarations and REMIT notifications.
You must submit Physical Notifications that reflect the position immediately before the Load Shedding instruction was received, if you haven’t done so already.
Grid Code Modification GC0160 allows the Lead Party of a BM Unit affected by a Load Shedding Instruction to do this, rather than be required to submit Physical Notifications that reflect the position resulting from the Load Shedding Instruction.
You should contact
Elexon at the earliest opportunity by one of your Category A Authorised Persons sending an email to Elexon’s
Settlement and Invoicing Team (
Settlement.Invoicing@elexon.co.uk) and the
BSC Service Desk (
bscservicedesk@cgi.com). You will receive an incident number (in the format ‘REQUKnnnnnnnnnn’) in the automatic response from the Service Desk. Please quote this reference number in any correspondence regarding this.
Elexon will then liaise with you and the NGESO to agree the detail of the P448 BOAs which NGESO will issue to the
Settlement Administration Agent (SAA), as set out in the next section. This process and the information that you will need to provide is set out in in Section 3.5 of
BSCP18 “Corrections to Bid-Offer Acceptance Related Data”.
You must retain records as set out in BSC Section G6.1.2 i.e. such records as may reasonably be expected to assist the NGSESVC in performing its duties records, including:
relating to the volume of Active Energy bought and/or sold by the Lead Party at the Bid-Offer Acceptance Time for the Network Gas Supply Emergency Acceptance;
that demonstrate (or may allow the NGSESVC to infer) which BM Unit(s) the Lead Party would have used to deliver that Active Energy; and
that demonstrate (or may allow the NGSESVC to estimate) the Avoidable Costs that the Lead Party incurred or saved as a result of the Network Gas Supply Emergency Acceptance
Continue to submit appropriate Bid Prices.
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |