Obsolete Code of Practice K1: The Metering of Electricity Transfers between the National Grid Company plc and Existing Non-Embedded Direct Consumers using the National Metering Scheme at commercial boundaries (known as the "Final Metering Scheme") V1.0.0
Effective From Date:
Status:SUPERSEDED
Other versions
Download
This document is not currently fully available in the Digital Code. A PDF version is available for download by clicking the link below.