My BSC Dashboard
Subscriptions
Kinnect Customer Solution
THE INDUSTRY & ELEXON
BSC & CODES
CHANGES & RELEASES
COMMITTEES & GROUPS
SETTLEMENT & INVOICING
OPERATIONAL PRACTICES
DATA INSIGHTS & ANALYSIS
MARKET ENTRY & EXIT
PERFORMANCE ASSURANCE
THE INDUSTRY & ELEXON
BSC & CODES
CHANGES & RELEASES
COMMITTEES & GROUPS
SETTLEMENT & INVOICING
OPERATIONAL PRACTICES
DATA INSIGHTS & ANALYSIS
MARKET ENTRY & EXIT
PERFORMANCE ASSURANCE
Home
BSC & Codes
BSC Digital Codes
This version of the CoP has been superseded. All metering equipment and metering systems are required to be compliant to the latest version of the relevant CoP at the time of installation, or following a Material Change.
Previous version
Next version
CONTENTS
Obsolete Code of Practice G: The Metering of Second Tier Supplies of 1MW and Above V1.0.0
Effective From Date:
30/03/1990
Status:
SUPERSEDED
Other versions
Download
This document is not currently fully available in the Digital
Code
. A PDF version is available for download by clicking the link below.
Download PDF Version for
Code of Practice
G
Scroll to top