Name | Role | Signed and Dated |
Author(s) |
|
|
Entry Process Co-ordinator | EPC Analyst |
|
Reviewer(s) |
|
|
Graham Archbold | EPC Analyst |
|
Christine Pearson | EPC Manager |
|
Approver(s) |
|
|
Ijeoma Obi | Customer Services Manager |
|
Distribution List
Name | Organisation |
Entry Process Managers | Participating Organisations |
EPC Witnesses | Entry Process Co-ordinator (EPC) |
Change History
Issue | Date | Author | Description |
0.1 | 20.06.2003 | Patrick Jones | First Draft of document introduces for P62 compliance |
0.2 | 30.06.2003 | Graham Archbold | Updated following review by ELEXON |
0.3 | 1.07.2003 | Graham Archbold | Updated following further review by ELEXON |
0.4 | 9.07.2003 | Christine Pearson | Updated following further review by ELEXON |
1.0 | 24.07.2003 | Christine Pearson | Issued for use as part of Modification P62 |
2.0 | 01.05.2004 | Christine Pearson | Updated as part of P99 |
Modification Proposal P62 ‘Changes to Facilitate Competitive Supply on the Networks of New Licensed Distributors’. P62 is effective from 1st August 2003 and allows existing Distributors, now known as Licensed Distribution System Operators (LDSOs) to expand their businesses to operate in other GSP groups and allows new LDSOs to enter the SVA Trading Arrangements.
Section 2, TA Change Compliance Introduction;
Section 3, Standard Entry Process Checks;
Section 4, Advance Evidence Requirements, detailing the questions a Participant must provide responses for, prior to the on-site Compliance Inspection visit;
Section 5, On Site Compliance Inspection Tests, detailing the on-site inspection requirements;
Section 6, “What-if” Scenarios, detailing the questions a Participant will need to consider;
Appendices - including Abbreviations and Terms Used and Related Documents.
To define the detail of the TA Change Compliance script;
To co-ordinate the requirements of the TA Change Compliance script and to analyse the information and evidence provided by the Participant to ensure that all requirements are satisfied.
To understand the requirements of the TA Change Compliance script prior to execution;
To make all the necessary changes to their business processes, working instructions and systems to support the SVA Trading Arrangements including all major changes to date;
To have successfully carried out testing of the changes;
To have documentary evidence of the test results;
To present/operate their systems and business processes to demonstrate Compliance with the requirements of the TA Change Compliance script;
To ensure that the appropriate business users are available during the on-site inspection visit to provide the assurance required by the detailed sections of this document.
Compliance Inspection Application;
Preparation;
Pre Test Inspection Visit (if required);
On Site Compliance Inspection visit to witness the standard Entry Process checks, review the advance evidence responses, witness the on site inspection requirements demonstrated and discuss the various ‘What if’ scenarios;
Post Visit Activities and Formal Approval.
Overall assessment of the Participant’s solution for meeting the requirements of the SVA Trading Arrangements, including the level of automation and validation;
Overall assessment of the Participant’s business processes and local working instructions;
Level and experience of operational staff;
Versions of software and systems employed during testing (versions of software and processes used during testing should be the same throughout Entry Processes and be those intended for live operation).
Loading and use of Market Domain Data (MDD) – to ascertain whether the Participant has a detailed process for the regular receipt and handling of MDD.
Loading and use of Daily Profile Coefficients (DPCs) – (for NHHDC and Suppliers only)
Loading and use of Estimated Annual Consumption (EAC) and Reading History – to ascertain the key business triggers invoking the Participant’s process.
Local working instructions;
Diagrams of systems and configurations;
Details of systems changes since previous testing;
Details of training plans;
Evidence from testing undertaken.
Advance Evidence | Compliance Justification |
A1 Overview of operational processes; | Provide an outline of the approach to testing and how the BSC requirements have been incorporated in to the systems and the testing undertaken to prove the changes. |
A2 Overview of systems and communications; | |
A3 Overview of business separation especially where Participants are operating multiple MPIDs; | |
A4 Summary of changes made to conform with the current BSC framework; | |
A5 Summary of approach and actual testing undertaken to prove changes; | |
A6 Current (if applicable) and desired market volumes. |
Advance Evidence | Compliance Justification |
B1 Summary of staff training undertaken and planned in relation to changes since any previous SVA Entry Process; | Participants may have processes in place utilising assumptions that are no longer correct. |
B2 Business processes and local working instructions for new connection of a metering system; | Any assumptions will need to be reviewed to ensure that they still hold true the current market. Assurance is required to ensure that systems and processes changes have been adequately implemented and that staff have sufficient information to operate effectively. |
B3 Business processes and local working instructions for change of supplier and all agents; | |
B4 Business processes and local working instructions for emergency de-energisation of a metering system; | |
B5 Business processes and local working instructions for update and use of LLFCs; | |
B6 Business processes and local working instructions for standing data changes; | |
B7 Business processes and local working instructions for changes to SSC/TPR/MTC (NHH only); | |
B8 Business processes and local working instructions for maintenance and use of Market Domain Data. | |
B9 Business processes and local working instructions for the provision of PARMS data. |
Advance Evidence | Compliance Justification |
C1 How is the GSP Group of a meter identified (without using the first two characters of the MPAN) and at what stage is this required? Is it required for quotations? | This is a key change brought on by Modification P62 and the mechanisms must be examined in detail. |
C2 How are the correct agents and contract terms identified for each LDSO/GSP Group? | Agent/LDSO/GSP group selection is now more complicated and appropriate selection will help avoid rejected appointments and reduce exceptions in settlement. |
C3 Describe the process for dealing with a D0261 Rejection of Agent Appointment. What processes are in place to ensure that an agent is appointed in a timely manner for every metering system? | Rejection of appointment flows may become more common as agents have geographical limitations and valid hubs more complex. |
C4 How is the appropriate settlement configuration for a metering system identified for each LDSO/GSP Group? | Certain elements of the settlement configuration are by GSP Group and others by LDSO making the assignment of the configuration more complicated than before. The identification of the appropriate settlement configuration will reduce exceptions in settlement. |
C5 Can systems or processes cope with P62 compliant MDD e.g. LLFCs, multiple LDSOs in a GSP Group?
| MDD usage is checked as part of Participant’s initial Entry Process and again following a major change to ensure that processes and systems for loading and using MDD can handle any changes as a result of the major change. |
C6 What is the process for receiving and processing:
and have any changes been made at this time? | The D0041 caters for multiple LDSOs per GSP Group and supplier systems must be able to handle such flows. |
C7 What is the process for handling reports from SVAA? How are the D0030 Non Half Hourly DUoS and D0082 Supplier Purchase Matrix Reports handled? | These flows may contain multiple LDSOs per GSP Group and support for this should be demonstrated. |
C8 What processes have been put in place to manage the notification of settlement details to agents? | Supplier agents need to know the GSP Group in which a meter is located and the relevant metering system details. Suppliers should have a process for identifying these details and passing them to their agents both in the first instance and on request. |
C9 What is your process for handling D0095 Exception Reports? | Exception handling is a key supplier responsibility to ensure the accuracy of data in settlement. |
C10 What process is used to handle E01 (No EAC or AA details) and E10 exception details (GSP Group incorrect) on D0095 Non Half Hourly Data Aggregation Exception Reports? | E01 occurs frequently and must be addressed promptly. E10 occurs rarely at present although the instances of it arising will increase as a result of P62. |
C11 What is your process for handling D0235 Exception Reports? Has this changed in light of any recent changes to the BSC? | Exception handling is a key supplier responsibility to ensure accuracy of data in settlement. |
C12 What is your process for the management of UMS certificates? | UMS certificates are issued by LDSOs and cannot be assumed to belong to just one GSP Group. |
C13 What changes have been made to assist in the determination of appropriate MTCs? | Administration and selection of MTCs is more complicated and may need to consider the needs of the LDSO and the location of the meter. |
C14 What is your process for managing prepayment metering systems to ensure that the correct meter types are requested and the correct readings used for settlement? | The MPAN prefix can no longer be used to determine prepayment technology. An LDSO (and consequently the MPAN prefix) may support all three main types of prepayment meters. |
C15 How is the use of BM units controlled? C15A What controls are in place to prevent attempts to make BM Units span GSP Groups? C15B What processes have been put in place to identify and handle energy for multiple LDSOs in the same BM Unit? | BM Units always relate to one GSP Group, but they can now contain energy associated with multiple LDSOs. |
C16 Are new BM units required to manage metering in addition to the default BM unit and if so, have these been set-up? |
|
Advance Evidence | Compliance Justification |
D1 How do you identify and validate the GSP Group of a meter (not using the first two characters of the MPAN)? | All agents are required to use reasonable endeavours to ensure that the GSP group for an MPAN is the correct one.and must not be derived from the MPAN. Conflicting GSP group information may be provided on D0155, D0052 and D0152 flows and the process for identifying this and resolving it is required. |
D2 How do you identify whether you are the correct agent for a supplier and that the contract terms are acceptable and appropriate to the metering system/GSP/LDSO? | Hubs are more complex since the introduction of new LDSOs and contractual arrangements may vary by geographical location or other factors. |
D3 How do you notify a supplier when you are not the correct agent? Do you have any checks to ensure that the supplier cancels your appointment? | Currently an area which is not well addressed generally. |
D4 Can systems or processes cope with P62 compliant MDD e.g. LLFCs, multiple LDSOs in a GSP Group? | MDD usage is checked as part of a Participant’s initial Entry Process and again following a major change to ensure that processes and systems for loading and using MDD can handle the changes as a result of P62. |
D5 Can systems and processes support maintenance of LLFCs taking into consideration that there may be multiple LDSOs within a single GSP Group? (DAs only) | Data structures have changed and the management of LLFs needs to be reviewed. |
D6 Can systems and processes support multiple LDSOs issuing UMS Certificates for the same GSP Group? | UMS Certificates are issued by LDSOs and cannot be assumed to belong to just one GSP Group. Management of UMS Certificates needs to be demonstrated. |
D7 Is GSP Group stored at the appropriate level within the systems to support appropriate processing? | GSP Group can no longer be assumed. |
D8 What is your process for checking that you are allowed to work with the other notified parties? |
|
Advance Evidence | Compliance Justification |
E1 What is your process for assisting in the determination of appropriate MTCs? | Administration and selection of MTCs is more complicated and must be agreed with the supplier. |
E2 How do you manage UMS Certificates? | UMS Certificates are issued by LDSOs and cannot be assumed to belong to just one GSP Group. |
E3 What facilities are provided to assist suppliers with the determination of GSP Group? | This is a key change brought on by P62 and the mechanisms must be examined in detail. |
E4 What processes are in place for identifying and resolving D0023 exceptions from a Data Aggregator? | Prompt attention to exceptions will improve the quality of data to settlement. |
E5 What is the validation of LDSO notified changes to metering systems? | SMRS services can now be provided by completely separate organisations to the LDSO, so communications will need to be enhanced and formalised. |
E6 What are the processes for notifying LDSOs of errors in notified changes? | |
E7 What validation of supplier notified changes to metering systems is carried out? | The scope for inappropriate supplier notified changes has increased significantly with an increased risk to settlement. |
E8 What are the processes for notifying suppliers of errors in notified changes? | |
E9 What are the processes for notifying DAs of the LLFCs for each GSP Group? | Administration and selection of LLFCs is more complicated. |
Test Id | Inspection Element | Reference |
NHH-SUPP.1 | The supplier is required to identify the GSP Group of MPANs for a new connection:
| 3D07 |
NHH-SUPP.2 | The supplier is required to select appropriate agents and contract terms for the GSP Group, LDSO and supply type for new connections:
| 3D07 |
NHH-SUPP.3 | Receive and resolve a D0261 rejected appointment with rejection code ‘Z’ from an agent on a new connection. | 3D07 with additional steps |
NHH-SUPP.4 | Determine appropriate settlement configuration for new connections:
| 3D07 |
NHH-SUPP.5 | Identify the GSP for an MPAN:
| 3D60 |
NHH-SUPP.6 | Select appropriate agents and contract terms for GSP Group, LDSO and supply type on change of supplier for MPANs:
| 3D60 |
NHH-SUPP.7 | Receive and resolve a D0261 rejected appointment due to incorrect GSP Group from an agent on a change of supplier. | 3D60 with additional steps |
NHH-SUPP.8 | Determine appropriate settlement configuration on change of supplier for MPANs:
| 3D60 |
NHH-SUPP.9 | Identify the first use of an NHHDC in a GSP Group and notify SVAA & PAA. This test requires meters for the NHHDC as follows:
(Standing Data Changes must be by GSP group not by LDSO). | 3D68 |
NHH-SUPP.10 | Identify end of use of an NHHDC in a GSP Group and notify SVAA & PAA for MPANs for 2 different LDSOs in the same GSP group. | 3D68 |
NHH-SUPP.11 | Identify the first use of an NHHDA in a GSP Group and notify SVAA. This test requires meters for the NHHDA as follows: a) at least 2 MPANs for a new LDSO in two different GSP Groups and b) at least 1 MPAN for a former PES LDSO trading out of their original area in one of the GSP groups in (a) above. (Standing Data Changes must be by GSP group not by LDSO). | 3D68 |
NHH-SUPP.12 | Identify end of use of an NHHDA in a GSP Group and notify SVAA for MPANs for 2 different LDSOs in the same GSP group. | 3D68 |
NHH-SUPP.13 | Identify entry to a GSP Group as a supplier and notify SVAA. This test requires meters for the Supplier as follows: a) at least 2 MPANs for a new LDSO in two different GSP Groups and b) at least 1 MPAN for a former PES LDSO trading out of their original area in one of the GSP groups in (a) above. | 3D68 |
NHH-SUPP.14 | Identify exit from a GSP Group as a supplier and notify SVAA for MPANs for 2 different LDSOs in the same GSP group. | 3D68 |
NHH-SUPP.15 | Receive a D0095 E10 exception – identify cause and resolve. | 3D82 |
NHH-SUPP.16 | Identify, instruct agents and change the SSC and associated TPR and MTC of an existing metering system for MPANs in a new LDSO Network and for a former PES LDSO in another GSP Group. | 3D90 |
NHH-SUPP.17 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from P62 showing loading P62 specific MDD, operation of systems containing P62 specific MDD and use of P62 specific data within those systems. | PD52 |
NHH-SUPP.18 | Interface Test with LDSO (both directions). | I/F test |
NHH-SUPP.19 | The D0041 supports multiple distribution businesses in the same GSP Group. Does the supplier use the D0041 for internal reconciliation purposes and if so can they cope with multiple DB entries for each GSP Group. | Receipt of D0041 |
NHH-SUPP.20 | The D0082 supports multiple distribution businesses in the same GSP Group. Does the supplier use the D0082 for internal reconciliation purposes and if so can they cope with multiple DB entries for each GSP Group. | Receipt of D0082 |
NHH-SUPP.21 | The D0030 supports multiple distribution businesses in the same GSP Group. Does the supplier use the D0030 for internal reconciliation purposes and if so can they cope with multiple DB entries for each GSP Group. | Receipt of the D0030 with multiple GSP Groups and LDSOs |
NHH-SUPP.22 | Can a supplier reconcile the data in the D0296 data flow against its other sources? | D0296 |
Test Id | Inspection Element | Reference |
NHHDC.1 | Receive appointment for new connection, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 3D07 |
NHHDC.2 | Receive appointment for new connection and reject due to inappropriate GSP Group. | 3D07 with additional steps |
NHHDC.3 | Receive appointment for existing metering system on change of supplier and all agents, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 3D60 |
NHHDC.4 | Receive appointment for an existing metering system on change of supplier and all agents and reject due to inappropriate GSP Group. | 3D60 with additional steps |
NHHDC.5 | Receive appointment for and existing metering system on change of NHHDC, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 3D59 |
NHHDC.6 | Receive appointment for an existing metering system on change of NHHDC and reject due to inappropriate GSP Group. | 3D59 with additional steps |
NHHDC.7 | Accept appointment to an existing metering system, identify insufficient DPC data and obtain missing data for MPANs:
| 3D68 |
NHHDC.8 | Resolve D0095 E10 exception notified by supplier e.g. change GSP Group on file and resubmit D0019. | 3D82 |
NHHDC.9 | Handle emergency de-energisation by LDSO notification and final reading for MPANs:
| 3D61 |
NHHDC.10 | Receive notice of and validate changed SSC and associated TPR and MTC for an existing MPAN and apply, managing final and initial readings. This test should be undertaken for MPANs:
| 3D90 |
NHHDC.11 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO. | 3D60 with additional steps |
NHHDC.12 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
NHHDC.13 | Demonstrate numerical accuracy in processing of meter readings and production of EAC/AAs. | 1D01 |
Test Id | Inspection Element | Reference |
NHHDA.1 | Receive D0209 appointments for new connections, validate GSP Group and settlement configuration and accept appointment for MPANs:
| 3D07 with additional steps |
NHHDA.2 | Receive D0153 appointments for new connections and accept for MPANs:
| 3D07 |
NHHDA.3 | Detect a D0095 E10 exception and route to appropriate supplier. | 3D82 |
NHHDA.4 | Receive revised D0019 resolving D0095 E10 exception restating the GSP Group. | 3D82 |
NHHDA.5 | Demonstrate support for multiple LDSOs within a GSP Group. | 1D01 |
NHHDA.6 | Demonstrate support for multiple LDSOs within a GSP Group causing repeating LLFC Ids. | 1D01 |
NHHDA.7 | Demonstrate support for former Scottish LDSO prefixes within an England and Wales GSP Group. | none |
NHHDA.8 | Demonstrate support for the production of D0041s for multiple settlement agencies assuming a mix of meters and agents in Scotland and E&W i.e. the same agents in both settlement areas (until BETTA Go Live). | none |
NHHDA.9 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO. | none |
NHHDA.10 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading of multiple LDSOs per GSP group within MDD, operation of systems containing this specific MDD and the use of this data within those systems. | PD52 |
NHHDA.11 | Demonstrate the provision of summary information of D0095 exceptions raised in the reporting month to PAA (PARMS SH03) | none |
Test Id | Inspection Element | Reference |
NHHMO.1 | Receive appointments for a new connection, check GSP Group, validate settlement configuration and accept appointment for MPANs in a new LDSO Network and for a former PES LDSO in another GSP Group. | 3D07 |
NHHMO.2 | Receive appointment for new connection and reject due to inappropriate GSP Group. | 3D07 with additional steps |
NHHMO.3 | Receive appointments for existing metering systems on change of supplier and all agents, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 3D60 |
NHHMO.4 | Receive appointment for an existing metering system on change of supplier and all agents and reject due to inappropriate GSP Group. | 3D60 with additional steps |
NHHMO.5 | Receive appointments for existing metering systems on change of NHHMO, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 3D59 |
NHHMO.6 | Receive appointment for an existing metering system on change of NHHMO and reject due to inappropriate GSP Group. | 3D59 with additional steps |
NHHMO.7 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO. | none |
NHHMO.8 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
Test Id | Inspection Element | Reference |
HH-SUPP.1 | The supplier is required to identify the GSP Group of MPANs for a new connection:
| 4D05 |
HH-SUPP.2 | Select appropriate agents and contract terms for GSP Group and supply type for a new connection for MPANs:
| 4D05 |
HH-SUPP.3 | Receive and resolve a D0261 rejected appointment with rejection code ‘Z’ from an agent on a new connection | 4D05 with additional steps |
HH-SUPP.4 | Determine appropriate settlement configuration for a new connection for MPANs:
| 4D05 |
HH-SUPP.5 | Identify the GSP of an MPAN on change of supplier for MPANs:
| 4D02 |
HH-SUPP.6 | Select appropriate agents and contract terms for GSP Group and supply type on change of supplier for MPANs:
| 4D02 |
HH-SUPP.7 | Receive and resolve a D0261 rejected appointment from an agent on a change of supplier | 4D02 with additional steps |
HH-SUPP.8 | Determine appropriate settlement configuration on change of supplier for MPANs:
| 4D02 with additional steps or 4D05 |
HH-SUPP.9 | Identify the first use of an HHDC in a GSP Group and notify SVAA & PAA. This test requires meters for the HHDC as follows: a) at least 2 MPANs for a new LDSO in two different GSP Groups and b) at least 1 MPAN for a former PES LDSO trading out of their original area in one of the GSP groups in (a) above. (Standing Data Changes) | 4D68 |
HH-SUPP.10 | Identify end of use of an HHDC in a GSP Group and notify SVAA & PAA for MPANs for 2 different LDSOs in the same GSP group. | 4D68 |
HH-SUPP.11 | Identify the first use of an HHDA in a GSP Group and notify SVAA This test requires meters for the HHDA as follows: a) at least 2 MPANs for a new LDSO in two different GSP Groups and b) at least 1 MPAN for a former PES LDSO trading out of their original area in one of the GSP groups in (a) above. | 4D68 |
HH-SUPP.12 | Identify end of use of an HHDA in a GSP Group and notify SVAA for MPANs for 2 different LDSOs in the same GSP group. | 4D68 |
HH-SUPP.13 | Identify entry to a GSP Group as a supplier and notify SVAA. This test requires meters for the HHDC as follows: a) at least 2 MPANs for a new LDSO in two different GSP Groups and b) at least 1 MPAN for a former PES LDSO trading out of their original area in one of the GSP groups in (a) above. | 4D68 |
HH-SUPP.14 | Identify exit from a GSP Group as a supplier and notify SVAA for MPANs for 2 different LDSOs in the same GSP group. | 4D68 |
HH-SUPP.15 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
HH-SUPP.16 | Interface Test with LDSO (both directions) | I/F test |
Test Id | Inspection Element | Reference |
HHDC.1 | Receive appointment for new connection, check GSP Group, confirm settlement configuration and accept appointment for MPANs:
| 4D05 |
HHDC.2 | Receive appointment for new connection and reject due to inappropriate GSP Group | 4D05 with additional steps |
HHDC.3 | Receive appointment for and existing metering system on change of supplier and all agents, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 4D02 |
HHDC.4 | Receive appointment for an existing metering system on change of supplier and all agents and reject due to inappropriate GSP Group | 4D02 with additional steps |
HHDC.5 | Receive appointment for an existing metering system on change of HHDC, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 4D03 |
HHDC.6 | Receive appointment for an existing metering system on change of HHDC and reject due to inappropriate GSP Group | 4D03 with additional steps |
HHDC.7 | Accept appointment to an existing metering system, identify insufficient PPC data for estimation purposes and obtain missing data for MPANs:
| 4D02 with additional steps |
HHDC.8 | Manage emergency de-energisation by LDSO notification and final reading for MPANs:
| none |
HHDC.9 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO | none |
HHDC.10 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
HHDC.11 | Demonstrate numerical accuracy in processing of meter readings and production of validated HH advances | 2D01 |
HHDC.12 | Demonstrate the data collation and report production mechanism for the monthly D0008 Overdue MAR report | none |
Test Id | Inspection Element | Reference |
HHDA.1 | Receive D0209 appointment for new connection, validate GSP Group and settlement configuration and accept appointment:
| 4D05 with additional steps |
HHDA.2 | Receive D0153 appointment for new connection in a new LDSO and accept for MPANs:
| 4D02 |
HHDA.3 | Demonstrate support for multiple LDSOs within a GSP Group | 2D01 |
HHDA.4 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO | none |
HHDA.5 | Demonstrate loading and use of LLF and LLFCs for multiple LDSOs for a given GSP Group | 4D14 |
HHDA.6 | Demonstrate approach to metering systems from multiple LDSOs in the same BM Unit | 4D05 with additional steps |
HHDA.7 | Demonstrate controls to prevent MPANs within a BM Unit spanning GSP Groups | 4D05 with additional steps |
HHDA.8 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
HHDA.9 | Demonstrate support for the production of D0040/D0298 for multiple settlement agencies for a mix of meters and agents in Scotland and E&W i.e. the same agents in both settlement areas (until BETTA Go Live) | none |
Test Id | Inspection Element | Reference |
HHMO.1 | Receive appointment for a new connection, check GSP Group, validate settlement configuration and accept appointment for MPANs:
| 4D05 |
HHMO.2 | Receive appointment for new connection and reject due to inappropriate GSP Group | 4D05 with additional steps |
HHMO.3 | Receive appointment for an existing metering system on change of supplier and all agents, identify GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 4D02 |
HHMO.4 | Receive appointment for an existing metering system on change of supplier and all agents and reject due to inappropriate GSP Group | 4D02 with additional steps |
HHMO.5 | Receive appointment for an existing metering system on change of HHMO, check GSP Group and confirm settlement configuration and accept appointment for MPANs:
| 4D13 |
HHMO.6 | Receive appointment for an existing metering system on change of HHMO and reject due to inappropriate GSP Group | 4D13 with additional steps |
HHMO.7 | Detect and resolve appointment to unapproved combination of Supplier/Agent/LDSO | None |
HHMO.8 | Maintenance and use of Market Domain Data with specific reference to the changes resulting from the introduction of new LDSOs showing loading MDD, operation of systems containing multiple LDSOs per GSP group within MDD and the use of this specific data within those systems. | PD52 |
Ref | Description | From | To |
| Skeleton Metering Point Details | LDSO | SMRS |
| Confirmation of Skeleton Registration Details | SMRS | LDSO |
| Rejection of Metering Point Skeleton Details | SMRS | LDSO |
| Changes to Metering Point Details | LDSO | SMRS |
| Confirmation of Registration Details Changes | SMRS | LDSO |
| Rejection of Metering Point Detail Changes | SMRS | LDSO |
| Notification of Disconnection of Metering Point | LDSO | SMRS |
| Confirmation of Metering Point Disconnection | SMRS | LDSO |
| Rejection of Metering Point Disconnection | SMRS | LDSO |
| Notification of Supplier Provided Registration Details | SMRS | LDSO |
| Notification of Current Registration Details For Old Supplier | SMRS | LDSO |
| Notification of Cancellation of Current Registration Details For Old Supplier | SMRS | LDSO |
| Notification of Future Registration Details For Old Supplier | SMRS | LDSO |
| Notification of Cancellation of Future Registration Details For Old Supplier | SMRS | LDSO |
| Notification of Future Registration Details For New Supplier | SMRS | LDSO |
| Notification of Cancellation of Future Registration Details For New Supplier | SMRS | LDSO |
| Refresh of Metering Points for LDSO | SMRS | LDSO |
| File Summary | SMRS | LDSO |
| Notification of Change of Settlement Liability for Metering System (CoS) | SMRS | LDSO |
| Other Interfaces (as per BSCP511 form): |
|
|
|
|
|
|
Test Id | Scenario | Context | Who |
W.1 | Avoidance of invalid hubs | A supplier wishes to use different agents in a GSP Group that they already operate in or wishes to operate in a new GSP Group. How do they ascertain whether the proposed agents are P62 compliant and the supplier hubs approved? | Supplier |
W.2 | Avoidance of invalid hubs: negative compliance | A supplier’s agent does not want to work with new distribution businesses only with the incumbent distribution business. How does a supplier manage this? | Supplier |
W.3 | HH Supplier: production of D0297 | When determining the appropriate BM unit for an MPAN – how will the supplier control different LDSO metering systems in the same BM unit? Cannot assume the first two digits of the MPAN indicate the GSP Group. | HH Supplier |
W.4 | HH Supplier: receipt of D0295 | How does the supplier deal with a rejection of a BM unit allocation? | HH Supplier |
W.5 | Supplier receipt of D0242 | How will the supplier be able to handle the D0242 for each LDSO and GSP Group combination? | Supplier |
W.6 | ‘English’ prefixed MPAN in Scottish BSP Group (Bulk Supply Point Group) | An existing LDSO or a new LDSO establishes meters in Scotland. On CoS, systems and controls must be in place to prevent the meter getting through to English settlement until BETTA Go live. If necessary raise the appropriate Exception (DA). | Supplier, NHHDC, NHHDA, MO, HHDC, HHDA |
W.7 | ‘Scottish’ prefixed MPAN in E&W | A Scottish LDSO establishes meters in E&W. The supplier/agent must be able to accept these meters for GSP Groups that they are qualified in. The supplier/agent must not accept meters for GSP Groups that they are not qualified in. If necessary raise the appropriate Exception (DA). | Supplier, NHHDC, NHHDA, MO, HHDC, HHDA |
W.8 | Post BETTA transfer of ‘Scottish’ MPANs to GB BSC Settlement systems | What process is in place for transferring MPANs in Scottish BSP Groups from IARA to SVAA post BETTA Go live? How will reconciliation runs be managed for days where the initial settlement was carried out by IARA? | Supplier, NHHDA, HHDA. |
Action ID: | A code that uniquely identifies a script action in the format: ‘agent.n’, where ‘agent’ is an abbreviation or acronym for the Agent involved, ‘n’ is a sequence number within agent. The same agent acronym is used in the corresponding swim lane heading and the sequence numbers are then displayed in the appropriate action boxes. A prefix of ‘O-’ for Old and ‘N-’ for New is used for actions and swim lane headings involving two instances of an agent. Sequence numbers for actions in the Volume Allocation process are prefixed with ‘S’. Sequence numbers for actions in the Reconciliation Volume Allocation process are prefixed with ‘R’. Volume Allocation and Reconciliation Volume Allocation actions will also be prefixed by ‘D’ or ‘E’ where they are to be carried out in respect of Day ‘D’ or Day ‘E’. |
AA | Annualised Advance |
BM | Balancing Mechanism |
BSC | Balancing and Settlement Code |
BSCP | Balancing and Settlement Code Procedure |
BSP | Bulk Supply Point – the equivalent of a GSP Group in Scotland |
Compliance | The status achieved by a Participant when all requirements of this TA Change Compliance script have been satisfied |
CoS | Change of Supplier |
DA | Data Aggregator |
DC | Data Collector |
DPC | Daily Profile Coefficient |
DTC | Data Transfer Catalogue |
‘Dnnnn:’ | Refers to the DTC data flow number and name that are detailed in Sections 4-6 of this script. |
EAC | Estimated Annual Consumption |
EP | Entry Process |
EPC | Entry Process Co-ordinator |
E&W | England and Wales |
GSP | Grid Supply Point |
HH | Half Hourly |
LDSO | Licensed Distribution System Operator |
LLFC | Line Loss Factor Class |
LWI | Local Working Instruction |
Market Entrant | An organisation seeking approval to the Trading Arrangements for the first time |
Market Participant | An organisation that is currently approved for operation in the Trading Arrangements |
MDD | Market Domain Data |
MOP | Meter Operator |
MPAN | Metering Point Administration Number |
MPID | Market Participant ID |
MTC | Meter Timeswitch Code |
NHH | Non Half Hourly |
PAA | Performance Assurance Administrator |
PAB | Performance Assurance Board |
Participant | The organisation (Supplier, LDSO, Supplier Agent or SMRS) undertaking Entry Processes |
PES | Public Electricity Supplier |
SMRA | Supplier Meter Registration Agent |
SMRS | Supplier Meter Registration Service |
Solution | The combination of IT and manual systems, business processes and local working instructions that are used together by the Participant to satisfy the requirements of the Trading Arrangements |
SSC | Standard Settlement Configuration |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
TA | Trading Arrangements |
TPR | Time Pattern Regime |
Trading Arrangements | The Wholesale electricity trading arrangements introduced in England and Wales in 2001, designed to provide greater competition, while maintaining a secure and reliable electricity system. They are based on bilateral trading between generators, suppliers, traders and customers and are defined in the Balancing and Settlement Code |
TSC | Time Switch Class |
UMS | Unmetered Supply |
1D01, 2D02 | Entry Process scripts to prove Arithmetic Accuracy |
3Dnn, 4Dnn | Entry Process scripts to prove Participant Business Processes, where nn is a two digit number |
Reference 1 | BSCP501: BSC Procedure – Supplier Meter Registration Service |
Reference 2 | BSCP504: BSC Procedure - Non Half Hour Data Collection for SVA Metering Systems Registered in SMRS |
Reference 3 | BSCP505: BSC Procedure - Non Half Hour Data Aggregation for SVA Metering Systems Registered in SMRS |
Reference 4 | BSCP507: BSC Procedure – Supplier Volume Allocation Standing Data Changes |
Reference 5 | BSCP508: BSC Procedure - Supplier Volume Allocation Agent |
Reference 6 | BSCP511: BSC Procedure – Supplier Meter Registration Service |
Reference 7 | BSCP512: BSC Procedure – Supplier |
Reference 8 | BSCP514: BSC Procedure – SVA Meter Operations for Metering Systems Registered in SMRS |
Reference 9 | BSCP515: BSC Procedure – Licensed Distribution |
Reference 10 | Party Service Line PSL110 for SVA Meter Operation |
Reference 11 | Party Service Line PSL120 for Non Half Hour Data Collector |
Reference 12 | Party Service Line PSL140 for Non Half Hour Data Aggregation |
Reference 13 | Party Service Line PSL160 for Supplier Meter Registration Service |
Reference 14 | SVAA Service Line SSL300 for the SVA Agent - Supplier Volume Allocation |
Reference 15 | SVAA Service Line SSL310 for the SVA Agent - Daily Profile Production |
Reference 16 | SVAA Service Line SSL360 for the SVA Agent - Market Domain Data Management |
Reference 17 | Data Transfer Catalogue |
Reference 18 | SVA Data Catalogue |
Reference 19 | NHH Entry Process Execution Specification (3D00v1.0.DOC), NHH Entry Process Data Set Up Specification (3DDSv1.0.DOC) and NHH Entry Process Set Up Data (3DSSv1.0.XLS) |