Balancing and Settlement Code
BSC PROCEDURE
QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS, VLPs AMVLPs, AMVLP AGENTS AND CVA MOAs
BSCP537
Date: |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
Version | Date | Description of Changes | CPs/ MPs Included | Mods Panel Ref |
1.0 | 23/07/07 | P197 Release | P197 | P/115/04 |
2.0 | 10/09/07 | P207 Release | P207 | P/127/04 |
3.0 | 1/11/07 | November 07 Release | CP1190 CP1210 | SVG77/04 ISG79/02 SVG79/02 |
4.0 | 06/11/08 | November 2008 Release | CP1240 | PAB88/03 ISG88/01 SVG88/02 |
|
|
| CP1244 | PAB88/03 ISG88/01 SVG88/02 |
5.0 | 26/11/08 | P207 Release | P207 | PAB91/12 ISG91/01 SVG91/06 |
6.0 | 07/11/13 | November 2013 Release | CP1391 | PAB148/04 ISG145/05 SVG148/05 |
7.0 | 26/06/14 | June 2014 Release | CP1406 | PAB158/06 ISG155/01 SVG158/03 |
8.0 | 05/11/15 | November 2015 Release | P319 Self-Governance | Panel 239/07 |
9.0 | 28/02/19 | February 2019 Release | P344 | Panel 284C/01 |
10.0 | 18/12/19 | December 2019 Standalone Release | CP1520 | PAB225B/02 ISG222/02 SVG225/03 |
11.0 | 02/04/20 | Emergency Fix 02042020 | - | ELEXON CEO Authorised |
12.0 | 25/06/20 | June 2020 Release | P404 Self-Governance | PAB232/08 ISG230/01 SVG232/02 |
13.0 | 05/11/20 | November 2020 Release | P411 Self-Governance | Panel 305/05
|
14.0 | 24/06/21 | June 2021 Release | CP1540 | PAB243/7 ISG242/7 SVG243/4 |
15.0 | 01/09/21 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
16.0 | 30/06/22 | 30 June Standard Release | P375 | P309/06 |
| Supplier | LDSO | SMRA | UMSO | HHDC | AMHHDC | NHHDC | HHDA | NHHDA | HH SVA MOA | NHH SVA MOA | AMMOA | CVA MOA | MA | VLP | AMVLP |
Qualification Process | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
Re-Qualification Initiating Process |
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Removal of Qualification Process |
|
|
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Annual Statement of Qualified Status Process |
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Surrender of Qualification Process |
|
|
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Change of Ownership Process |
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Derogations Process |
|
|
|
| ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
|
|
Compliance with P62 |
|
| ✔ |
|
|
|
|
|
|
|
|
|
|
|
|
|
BSCP06 | CVA Meter Operations for Metering Systems Registered in CMRS |
BSCP38 | Authorisations |
BSCP65 | Registration of Parties and Exit Procedures |
BSCP70 | CVA Qualification Testing for Parties and Party Agents |
BSCP509 | Changes to Market Domain Data |
BSCP538 | Error and Failure Resolution |
AMHHDC | Asset Metering Half Hourly Data Collector |
AMMOA | Asset Metering Meter Operator Agent |
AMVLP | Asset Metering Virtual Lead Party |
BSC | Balancing and Settlement Code (the “Code”) |
BSC PAB | Balancing and Settlement Code Performance Assurance Board |
BSC Panel | Balancing and Settlement Code Panel |
BSCCo | Balancing and Settlement Code Company |
BSCP | BSC Procedure |
CRA | Central Registration Agent |
HHDA | Half Hourly Data Aggregator |
HHDC | Half Hourly Data Collector |
LDSO | Licensed Distribution System Operator |
MDD | Market Domain Data |
MOA | Meter Operator Agent |
NHHDA | Non Half Hourly Data Aggregator |
NHHDC | Non Half Hourly Data Collector |
PAA | Performance Assurance Administrator |
PAP | Performance Assurance Party |
SAD | Self Assessment Document |
REC | Retail Energy Code |
REC PAB | Retail Energy Code Performance Assurance Board |
RIA | Risk and Impact Assessment |
ROP | Risk Operating Plan |
RoQ | Removal of Qualification |
SMRA | Supplier Meter Registration Agent |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
TAA | Technical Assurance Agent |
UMSO | Unmetered Supplies Operator |
VLP | Virtual Lead Party |
WD | Working Day |
R | is the date that the Removal of Qualification process is triggered |
Written Confirmation | Written Confirmation which is required to be given or received under this BSCP which can be in the form of an email, facsimile, circular or letter. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.1.1 | As required | Provide information and guidance on the Qualification Process and any other entry processes applicable to the Applicant. | BSCCo | Applicant | High level overview of Qualification Process including which Qualification Documents must be completed and the location of the information pack on the BSC Website. | Phone/Written Confirmation |
2.1.2 | After 2.1.1 | Applicant submits its proposed market role details and Qualification Letter2. Where the Applicant intends to be a Party to the Code it has applied to become a Party in accordance with Section A of the Code. Applicant sends appropriate Qualification Fee (if applicable). | Applicant | BSCCo | Applicant’s proposed market role details and Qualification Letter 3or Applicant’s application to be a Party to the Code. BSCP65 “Registration of Parties and Exit Procedures”. Menu of Qualification Fees. | Written Confirmation |
2.1.3 | 5WD after 2.1.2 | BSCCo sends confirmation that the Applicant intends to commence the Qualification Process (and where applicable confirms receipt of any documentation or otherwise). | BSCCo | Applicant | Confirmation of Applicant’s intention to commence Qualification Process. | Written Confirmation |
2.1.4 | Prior to PAB Meeting | Applicant ensures and BSCCo confirms that any additional steps required to complete the Qualification Process have been carried out. | BSCCo Applicant |
| Confirmation that Accession has been completed for Suppliers, VLPs and AMVLPs. Confirmation that the confidentiality disclosure and licence agreement have been received for NHHDA and NHHDC applications. For BSC Parties and CVA MOAs- Confirmation that the Applicant has completed additional qualification testing (BSCP70 “CVA Qualification Testing for Parties and Party Agents”). For CVA MOAs - Confirmation that the Applicant has registered for CVA MOA Sealing ID for CVA MOA applications (BSCP06 “CVA Meter Operations for Metering Systems Registered in CMRS”). | Internal Process |
2.1.5 | 5WD after 2.1.3 or later as agreed | Meet to discuss or communicate the Qualification Process in particular the necessity for completing the SAD and/or any testing requirements and/or witness testing4. In the case of BSC Parties liaise with the REC Code Manager to discuss possibility of combining any meeting. The aim of such meeting to discuss application timescales for the coordination of testing/witnessing. | BSCCo | Applicant
REC Code Manager | Mutually convenient date, time and venue. | Phone/Written Confirmation |
2.1.6 | After 2.1.5 | Applicant completes any relevant section of the SAD and submits to BSCCo for initial review5 6. | Applicant | BSCCo | Completed SAD. | Written / Electronic Confirmation |
2.1.7 | At any time after 2.1.5 | Applicant completes internal testing of systems and processes which may be witnessed by BSCCo until such time as BSCCo confirms that witnessed testing demonstrates that requirements have been met. | Applicant BSCCo |
| Completion of internal testing by Applicant and witnessing, if required, by BSCCo. | Internal Process |
2.1.8 | Within 10WD after 2.1.6 | High level review of SAD by BSCCo. BSCCo returns reviewed SAD and provides guidance, education and clarification on sections where requirements have not been met. If the requirements have been met proceed to 2.1.10. | BSCCo | Applicant | Reviewed SAD. | Phone/Written / Electronic Confirmation |
2.1.9 | After 2.1.8 | Applicant further completes the SAD and submits to BSCCo for additional review. | Applicant | BSCCo | Completed SAD. | Written / Electronic Confirmation |
2.1.10 | Within 10WD of 2.1.9 | BSCCo reviews SAD to ensure that it is prepared to the required standard. If prepared to the required standard then proceed to 2.1.11. If the requirements have not been met proceed to 2.1.6. | BSCCo |
|
| Internal Process |
2.1.11 | After 2.1.10 | BSCCo and Applicant confirm that evidence review can commence and mutually agree timescales.7 | BSCCo Applicant |
| Details of SAD supporting evidence to be reviewed. | Written Confirmation |
2.1.12 | After 2.1.11 and within the agreed timescales. | BSCCo reviews supporting evidence 8 to determine if evidence provides the appropriate confirmation that the required standard has been met. When required standards have been met proceed to 2.1.13. Where the required standards have not been met, BSCCo will provide guidance, assistance and clarification to the Applicant as to why. In this circumstance the Applicant should proceed to 2.1.9. | BSCCo | Applicant | Supporting evidence. |
|
2.1.13 | After 2.1.12 | Applicant submits final version of SAD authorised by a registered director of the Applicant (the registration of the latter to be verifiable with Companies House) or by such other person accepted as the authorised signatory pursuant to Section 3.6 hereof. | Applicant | BSCCo | SAD. | Signed Off Hard copy |
2.1.14 | At any time between 2.1.5 and 2.1.13 | BSCCo shall provide the Applicant Written Confirmation of the outcome of any review carried out by BSCCo. | BSCCo | Applicant |
| Written Confirmation |
2.1.15 | At any time between 2.1.5 and 2.1.13 but at least 12WD prior to PAB meeting | If Applicant disagrees with any aspect of the review carried out by BSCCo in relation to the Applicant’s Qualification the Applicant may request that the PAB makes a Qualification determination in respect of its Application. | Applicant | PAB | Details of Applicant’s appeal. | Written Confirmation |
2.1.16 | At least 12 WD before PAB Meeting and after 2.1.14. | BSCCo prepares and submits Qualification report to the PAB (and provides a copy of the same to the Applicant) recommending whether the Applicant should be Qualified. | BSCCo | PAB Applicant | Qualification Report. | Written Confirmation |
2.1.17 | At PAB Meeting | PAB decides whether the Applicant should be Qualified. If yes, then proceed to 2.1.189. If the application is deferred, then proceed to 2.1.21. | PAB | BSCCo | Qualification decision. | Meeting |
2.1.18 | Within 2WD of 2.1.17 | Notification of PAB’s decision to accept Qualification. Advise CRA to add relevant information to CRS (except in the case of SVA Party Agents). | BSCCo | All interested parties Applicant CRA | PAB Decision. | Written Confirmation |
2.1.19 | At any point after 2.1.2 | Applicant or Qualified Person may commence with MDD change request process10. | Applicant / Qualified Person | BSCCo | MDD change request form F509/01 in accordance with BSCP509 | Email / Fax. |
2.1.20 | After PAB decision | Raise MDD Change Request to add Qualified Person information to MDD database in accordance with BSCP509. | BSCCo | SVAA | PAB decision on Qualification Approval. | As per BSCP509. |
2.1.21 | Within 5 WD of 2.1.17 (if Qualification deferred) | Applicant informed in writing of the rationale for the decision. BSCCo to provide guidance, assistance and clarification to the Applicant as to why its Application was deferred. Proceed to 2.1.6. | BSCCo | Applicant | Areas of the SAD that are not acceptable and/or other areas which require further testing or evidence to be provided as determined by the PAB. | Written Confirmation |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
Where initiated by Qualified Person | ||||||
2.2.1 | Before implementation of a Material Change to Qualified Person’s systems and processes | Qualified Person performs its RIA and identifies that a change it wishes to implement is a Material Change. | Qualified Person |
| Appendix 3.4 ‘Re-Qualification’. | Internal Process |
2.2.2 | Following 2.2.1 if change is deemed to be Material. | Submit completed Re-Qualification Letter to BSCCo. | Qualified Person | BSCCo | Appendix 3.8 ‘Re-Qualification Letter’ (including a summary of change to systems and/or processes). | Written Confirmation |
2.2.3 | Following 2.2.2 | Proceed to 2.1.5 and follow the Qualification Process as if the references to Qualification were references to Re-Qualification and as if references to Applicant were references to Qualified Person. | Qualified Person |
|
|
|
Where initiated by the PAB | ||||||
2.2.4 | As required | PAB determines Qualified Person needs to Re-Qualify12. | PAB | BSCCo | Details of PAB decision. | Meeting |
2.2.5 | 5WD after 2.2.4 | BSCCo sends confirmation that the Qualified Person is required to Re-Qualify. | BSCCo | Qualified Person | Details of PAB decision. | Written Confirmation |
2.2.6 | 5WD after 2.2.5 | Proceed to 2.1.5 and follow the Qualification Process as if the references to Qualification were references to Re-Qualification and as if references to Applicant were references to Qualified Person. | Qualified Person |
|
|
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.3.1 | As required | Make observation or receive notification14 that a Qualified Person has failed to comply with the relevant requirements and/or standards for performance as described in the Code or any Code Subsidiary Document. | BSC Auditor TAA BSCCo Panel15 | BSCCo | Notice of the Qualified Person’s failure. BSCP538 – Error and Failure Resolution | Internal process / Written Confirmation |
2.3.2 | As soon as reasonably practicable after 2.3.1 | Collect history of the Qualified Person’s failure from appropriate parties. | BSCCo | BSC Auditor TAA BSCCo Interested parties | Details of failure by Qualified Person. | Internal process / Written Confirmation |
2.3.3 | As soon as reasonably practicable after 2.3.2 | Send letter to the Qualified Person (including details of failure history) indicating that a failure has been identified and advising that the matter will be reported to the PAB. | BSCCo | Qualified Person | Letter outlining the nature of the failure. | Written Confirmation |
2.3.4 | 10 WD after 2.3.3 or as agreed. | Qualified Person to consider letter and provide response (including any mitigating factors) to BSCCo so it can be included in report to PAB. | Qualified Person | BSCCo |
| Written Confirmation |
2.3.5 | As required, but at least 12WD before PAB meeting | Consider the information available on the Qualified Person’s failure (including any submissions made by the Qualified Person) and prepare and submit a report for the PAB to consider whether Qualified Person should enter into the RoQ process. | BSCCo | PAB | Report detailing Qualified Person’s failure history, and any submissions made by the Qualified Person. | Paper |
2.3.6 | Meeting of PAB | Consider failure history, and any mitigating factors submitted by the Qualified Person (either in writing or in person) and decide whether or not the Qualified Person should enter into the RoQ process. | PAB |
| Outcome of Decision and rationale. | Meeting |
2.3.7 | 2WD after 2.3.6 | Provide the Qualified Person with the outcome of the decision16. | BSCCo | Qualified Person | Outcome of Decision and rationale. | Written Confirmation |
2.3.8 | At next PAB meeting after 2.3.6 | Agree an action plan and relevant material milestones with the Qualified Person17. If an action plan cannot be agreed, the PAB may choose to proceed to either 2.3.10 or 2.3.11. | PAB Qualified Person |
| Details of actions to be taken to ensure compliance with the requirements or standards for performance are achieved. Details of appropriate milestone dates for each material action within the plan. | Written Confirmation |
2.3.9 | Prior to every PAB meeting, and no later than 12 WD prior to each PAB meeting throughout the period that Qualified Person is undergoing RoQ process | The Qualified Person to provide updates on progress against its action plan and progress towards achieving compliance with the requirements for standards of performance. BSCCo to collect updates on the Qualified Person’s progress against its action plan and progress towards achieving compliance with the requirements for standards of performance. | Qualified Person
BSCCo | PAB
BSC Auditor TAA BSCCo Interested parties | Qualified Person’s agreed action plan and updates on current status. | Written Confirmation |
2.3.10 | At PAB meetings throughout the period that Qualified Person is undergoing RoQ process | PAB to monitor at each successive meeting the Qualified Person’s compliance. If the Qualified Person is still failing to comply with the requirements and/or standards for performance or fails to meet any material milestones, or still fails to agree an action plan the PAB can, at its discretion, decide to proceed to 2.3.11. Where the PAB decides that the Qualified Person's achievement of compliance with the requirements or standards for performance has improved; or is no longer failing to meet any material milestones the PAB can, at its discretion decide to proceed to 2.3.15. | PAB |
| Qualified Person’s agreed action plan and updates on current status. | Paper |
2.3.11 | 5WD after 2.3.10 | Notify the Qualified Person that the PAB intends to inform all interested parties that the Qualified Person is undergoing the RoQ process if the Qualified Person continues to fail to comply with the requirements and/or standards for performance or fails to meet any further material milestones or fails to agree an action plan with the PAB. | PAB | Qualified Person | Notification details and timescales for improvement in Qualified Person’s compliance with the requirements or standards for performance or that all relevant material milestones should be met. In addition advanced notice that if the above are not met then the PAB may notify all interested parties. | Written Confirmation |
2.3.12 | At next relevant PAB meeting after 2.3.11 | (a) Where the PAB has previously written to the Qualified Person at 2.3.11 and if the Qualified Person is still failing to comply with the requirements and/or standards for performance or fails to meet any material milestones or fails to agree an action plan with the PAB, the PAB can, at its discretion, write to all interested parties to notify them that the Qualified Person is undergoing the RoQ process. Proceed to 2.3.13. or | PAB | All interested parties | Notification that Qualified Person is undergoing the RoQ process. | Written Confirmation |
|
| (b) Where the PAB decides that the Qualified Person’s achievement of compliance with the requirements or standards for performance has improved; or is no longer failing to meet any material milestones; or has agreed an action plan with the PAB; the PAB can, at its discretion decide to proceed to 2.3.9 for further monitoring or 2.3.15 to exit the RoQ process. | PAB |
|
|
|
2.3.13 | At next relevant PAB meeting after 2.3.12(a) | (a) Where the PAB has previously written to all interested parties at 2.3.12(a) and if the Qualified Person is still failing to comply with the requirements and/or standards for performance or fails to meet any material milestones or fails to agree an action plan with the PAB the PAB can, at its discretion, notify the Qualified Person that its Qualification will be removed. Proceed to 2.3.14. or | PAB
| Qualified Person | Details of the PAB’s decision. Effective from date of removal of Qualification. | Written Confirmation |
|
| (b) Where the PAB decides that the Qualified Person’s achievement of compliance with the requirements or standards for performance has improved; or is no longer failing to meet any material milestones; or has agreed an action plan with the PAB; the PAB can, at its discretion decide to proceed to 2.3.9 for further monitoring or 2.3.15 to exit the RoQ process. | PAB |
|
|
|
2.3.14 | 5WD after 2.3.13(a) | Notify all interested parties that the Qualified Person’s Qualification will be removed 3 months (or in a timescale at the PAB’s discretion) from the date of the PAB decision to remove Qualification. Raise MDD Change Request to remove Qualified Person information from the MDD database in accordance with BSCP509. Advise CRA to remove relevant information from CRS (except in the case of SVA Party Agents). | PAB
BSCCo | All interested parties
SVAA
CRA | Details of the PAB’s decision. Effective from date of removal of Qualification. | Written Confirmation |
2.3.15 | At PAB meetings throughout period that Qualified Person is undergoing RoQ process | Decide that the Qualified Person should exit the RoQ process as the Qualified Person is now achieving the required standard of compliance with the requirements or standards for performance have improved such that participation in the RoQ process is no longer required. Notify the Qualified Person. If letter at 2.3.12(a) sent, notify all interested parties that Qualified Person is no longer undergoing the RoQ process. | PAB | All interested parties Qualified Person | Details of the PAB’s decision. | Written Confirmation |
If an appeal is lodged with the Authority | ||||||
2.3.16 | Within 5WD of BSCCo being informed of appeal | If BSCCo receives notification from the Qualified Person that an appeal has been lodged with the Authority, inform all interested parties that the impending removal is suspended until the outcome of the appeal process is known. | BSCCo | All interested parties |
| Written Confirmation |
2.3.17 | Within 5WD of receipt of appeal decision from Authority | Notify all interested parties of the effective from date of the Qualified Person’s removal of Qualification or that the Qualified Person’s Qualification will no longer be removed, as appropriate (the effective from date of removal of Qualification may be different from the effective from date previously communicated at 2.3.14). If appeal upheld notify the Qualified Person that their Qualification will no longer be removed. If appeal rejected notify the Qualified Person of the effective from date of the Qualified Person’s removal of Qualification. Raise MDD Change Request to remove Qualified Person information from the MDD database in accordance with BSCP509. Advise CRA to remove relevant information from CRS (except in the case of SVA Party Agents). | BSCCo
BSCCo | All interested parties Qualified Person
SVAA CRA | Notification of the effective from date of the Qualified Person’s removal of Qualification if appropriate.
Notification that either the Qualified Person’s Qualification will no longer be removed or the effective from date of the Qualified Person’s removal of Qualification, as appropriate. | Written Confirmation |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.4.1 | On or before 1st April each year | Send annual statement signed by a registered director of the Applicant (the registration of the latter to be verifiable with Companies House) or by such other person accepted as the authorised signatory pursuant to Section 3.6 hereof | Qualified Persons | BSCCo | Annual statement letter19. | Written Confirmation |
2.4.2 | After 2.4.1 | Receive letters and present summary of letters to the PAB. | BSCCo | PAB | Paper summarising receipt of letters from Qualified Persons. | PAB Meeting |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.5.1 | Initial contact from Qualified Person. | Qualified Person notifies BSCCo of wish to surrender its Qualification. | Qualified Person | BSCCo | Letter confirming intention to surrender Qualification. | Written Confirmation |
2.5.2 | At least 12WD before next PAB meeting after 2.5.1 | BSCCo prepares and submits a paper to the PAB outlining the Qualified Person’s wish to surrender its Qualification. | BSCCo | PAB | Surrender of Qualification Paper. | Written Confirmation |
2.5.3 | PAB meeting | PAB removes Qualified status21. | PAB | BSCCo | Meeting minutes | Meeting |
2.5.4 | Within 5WD of 2.5.3 | BSCCo confirms to Formerly Qualified Person that Qualification has been removed. BSCCo notifies all interested parties of the same. Raise MDD Change Request to remove Qualified Person information from the MDD database in accordance with BSCP509. Advise CRA to remove relevant information from CRS. | BSCCo | Formerly Qualified Person All interested parties
SVAA
CRA |
| Written Confirmation |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.6.1 | Upon Change of Ownership of Qualified Person. | Inform BSCCo of Change of Ownership. | Qualified Person.. | BSCCo |
Change of Ownership Letter (Appendix 3.9) signed by authorised signatory. Statement to say whether or not the Qualified Person is making any Material Changes and therefore whether Re-Qualification will be sought. Confirmation that the confidentiality disclosure and licence agreement have been received for NHHDAs and NHHDCs.
| Written Confirmation |
2.6.2 | At least 12WD before next PAB meeting after 2.6.1 | BSCCo prepares and submits a paper to the PAB providing details of the change of ownership. | BSCCo | PAB | PAB paper | Paper |
2.6.3 | At PAB meeting | PAB makes a determination based on the ‘Details of the Change of Ownership' which may be one of: a) Re-Qualification is required, or b) Re-Qualification is not required. | PAB | BSCCo | Details of Change of Ownership. | Meeting |
2.6.4 | Within 5WD of 2.6.3 | Notify Qualified Person of PAB decision. | BSCCo | Qualified Person | Details of PAB decision. | Written Confirmation |
2.6.5 | Following 2.6.3 a) | Go to Section 2.2 ‘Re-Qualification Process’. | Qualified Person |
|
|
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
2.7.1 | As required, but at least 30 WD before PAB Meeting. | Submit a letter requesting derogation against certain Code requirements, including evidence to support the request. | Qualified Person Applicant | BSCCo | Details of the Code requirements against which the derogation is requested and details of the Qualified Person’s justification for requesting such derogation. | Written Confirmation |
2.7.2 | As required, but by PAB paper deadline. | Assess the derogation application, utilising any expert support as is necessary, and provide a paper detailing information on the derogation application for consideration by the PAB. | BSCCo | PAB | PAB paper detailing derogation application. | Paper |
2.7.3 | Next PAB meeting after 2.7.2 | PAB decision on the derogation application. | PAB | BSCCo | Derogation application. Information on the derogation application, provided by BSCCo. | Meeting |
2.7.4 | Within 5WD of 2.7.3. | Provide outcome of derogation decision to the Qualified Person and all interested parties. | BSCCo | Qualified Person All interested parties | PAB’s decision on the derogation. | Written Confirmation |
1 The Self Assessment Document is available on the Elexon website
2 The Applicant can voluntarily withdraw their Qualification Application, or put this application on hold, at any point in the process.
3 An Applicant intending to be a Party does not require a separate Qualification Letter
4 VLP parties will not be required to undergo witness testing.
5 The SAD may be either submitted in full or section by section, as agreed between Applicant and BSCCo.
6 The Applicant can go to the PAB at any time during the drafting of the SAD for advice, clarification or endorsement of its plans.
7 When completing the SAD the Applicant should detail what pieces of evidence can be provided in support of its response. BSCCo may request that these are provided for review, the ‘evidence review’. Examples of types of evidence include documentation or evidence of testing.
8 This review may be at the Applicant’s site, if so required.
9 The PAB may also approve the Applicant’s Qualification and also impose certain conditions or requirements on the Qualified Person.
10 A Supplier/LDSO/UMSO/SMRA does not have to be Qualified by the PAB before registering in MDD. A VLP does not register in MDD.
11 This process does not apply to a Qualified Person that is acting in its capacity as a Supplier or VLP.
12 Reasons may include but are not limited to a Qualified Person having a number of Errors/Failures (in accordance with BSCP538 – Error and Failure Resolution) identified in relation to it.
13 In this process Qualified Person should be read as not including Parties to the Code.
14 This notification could have been received from another Qualified Person or interested party.
15 This process may be commenced following a Panel decision in accordance with BSCP538 – Error and Failure Resolution
16 If the PAB decides that the Qualified Person should not enter the RoQ process then the process ends here.
17 If revisions to the action plan or relevant material milestones are required at any time during this process then Qualified Person is to request agreement of the revised action plan or relevant material milestones at the next PAB meeting.
18 Suppliers, LDSOs and VLPs are not required to provide an annual statement (LDSOs acting in their capacity as a SMRA or UMSO must provide an annual statement).
19 This letter must contain a statement that the Qualified Person has made no Material Changes to its systems or processes (as defined in this Appendix 3.4 ‘Re-Qualification’) since their last annual statement, or their original Qualification, whichever is the later (no supporting evidence is required in this case). Where this is not the case, the letter must state which Material Change(s) have been made over that period, and refer to the application(s) for Re-Qualification in respect of this/these.
20 This process does not apply to Qualified Persons who are Parties to the Code.
21 This will only happen when the PAB considers it to be appropriate in each circumstance, and only when certain considerations are taken into account, including but not limited to those described in Section J of the Code.
22 This is the Participant’s own RIA.
23 RIA procedures are subject to Section 5 - ‘Change Management and Risk Assessment Process’ of the SAD.
24 Approved Modification P62 (Changes to Facilitate Competitive Supply on the Networks of New Licensed Distributors) was implemented on 01 August 2003.
25 This Qualification process was first implemented on the Implementation Date (23 August 2007) of approved Modification P197 (SVA Qualification Processes Review).