Technical Assurance
Removal of Qualification
Monitoring and Reporting
Peer Comparison (public and non-public)
Supplier Charges
Error and Failure Resolution
Technical Assurance of Suppliers and Supplier Agents | |
Supplier Charges | |
Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs | |
Error and Failure Resolution | |
SVA Data Catalogue |
|
CVA Data Catalogue |
|
BSC | Balancing and Settlement Code (the Code) |
BSCCo | Balancing and Settlement Code Company |
BSCP | Balancing and Settlement Code Procedure |
CDCA | Central Data Collection Agent |
CVA MOA | Central Volume Allocation Meter Operator Agent |
DA(s) | Data Aggregator(s) |
DC(s) | Data Collector(s) |
EFD | Effective From Date |
GSP | Grid Supply Point |
HH | Half Hourly |
HHDA | Half Hourly Data Aggregator |
HHDC | Half Hourly Data Collector |
Id | Identifier |
LDSO | Licensed Distribution System Operator |
MDD | Market Domain Data |
MTD | Meters Technical Details |
MS | Metering System |
MSID(s) | Metering System Identifier(s) |
NHH | Non Half Hourly |
NHHDA | Non Half Hourly Data Aggregator |
NHHDC | Non Half Hourly Data Collector |
PAA | Performance Assurance Administrator |
PAB | Performance Assurance Board |
PARMS | Performance Assurance Reporting and Monitoring System |
R1 | First Reconciliation |
R2 | Second Reconciliation |
R3 | Third Reconciliation |
RF | Final Reconciliation |
RMP | Risk Management Plan |
ROP | Risk Operating Plan |
SF | First Settlement |
SMRA | Supplier Meter Registration Agent |
SVAA | Supplier Volume Allocation Agent |
SVA HHMOA | Supplier Volume Allocation Half Hourly Meter Operator Agent |
SVA NHHMOA | Supplier Volume Allocation Non Half Hourly Meter Operator Agent |
SSD | Supplier Start Date |
SSR | Supplier Settlement and Reconciliation |
SVAA | Supplier Volume Allocation Agent |
TA | Technical Assurance |
TFF | text file format |
WD | Working Day |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | Upon nomination and prior to first data submission. | Provide details of the individual personnel authorised to provide/receive data and any password including one dedicated Email address. | Data Provider, except for SVAA and CDCA | BSC Service Desk | Authorised personnel details and password on Form F533/01 | |
3.1.2 | By +1 WD of ref 3.1.1 | Acknowledge receipt. | BSC Service Desk | Data Provider | Form F533/01 | |
3.1.3 | By +1 WD of ref 3.1.1 | Request Authorisation of details. | PARMS | PAA | Form F533/01 | |
3.1.4 | By +1 WD of ref 3.1.1, if authorisation from PAA | Log details in Standing Data. | PARMS |
| Form F533/01 | Internal |
3.1.5 | By +1 WD of ref 3.1.1, if authorisation not gained | Inform Data Provider | PAA | Data Provider |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | To timing stated in Appendix 5.9 | Suppliers Agents send Output Data to PARMS. | Supplier | PARMS | PARMS Report in accordance with BSCP533 Appendix A PARMS Data Provider File Formats and BSCP533 Appendix B – PARMS Calculation Guidelines. | |
3.3.2a | By +1 WD of 3.3.1 | Log receipt of data, validate and acknowledge successful processing of data. | PARMS | Supplier | Acknowledgement text on Email | |
3.3.2b | By +1 WD of 3.3.1 | Log receipt of data, validate and acknowledge unsuccessful processing of data. | PARMS | Supplier | Acknowledgement text on Email | |
3.3.3a | By +1 WD of 3.3.2a | Receive positive acknowledgment. No further action required. | PARMS | Supplier |
| |
3.3.3b | By +1 WD of 3.3.2b | Receive negative acknowledgment Supplier must ensure prompt submission of rejected data, in correct format in accordance with 3.11. Process returns to 3.3.1. | PARMS | Supplier |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | To timing stated in Appendix 5.9 | SMRAs send Output Data. | SMRA | PARMS | PARMS Report in accordance with BSCP533 Appendix A – PARMS Data Provider File Formats and BSCP533 Appendix B – PARMS Calculation Guidelines. | F533/02 via e-mail |
3.4.2a | By +1 WD of 3.4.1 | Log receipt of data, validate and acknowledge successful processing of data. | PARMS | SMRA | Acknowledgement text on Email | |
3.4.2b | By +1 WD of 3.4.1 | Log receipt of data, validate and acknowledge unsuccessful processing of data. | PARMS | SMRA | Acknowledgement text on Email | |
3.4.3a | By +1 WD of 3.4.2a | Receive positive acknowledgment. No further action required. | PARMS | SMRA |
| |
3.4.3b | By +1 WD of 3.4.2b | Receive negative acknowledgment SMRA must ensure prompt submission of rejected data, in correct format in accordance with 3.11. Process returns to 3.4.1. | PARMS | SMRA |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.1 | To timing stated in Appendix 5.9 | Send Output Data. | SVAA | PARMS | PARMS Report in accordance with BSCP533 Appendix A – PARMS Data Provider File Formats and BSCP533 Appendix B – PARMS Calculation Guidelines. | |
3.5.2a | By +1 WD of 3.5.1 | Log receipt of data, validate and acknowledge successful processing of data. | PARMS | SVAA | Acknowledgement text on Email | |
3.5.2b | By +1 WD of 3.5.1 | Log receipt of data, validate and acknowledge unsuccessful processing of data. | PARMS | SVAA | Acknowledgement text on Email | |
3.5.3a | By +1 WD of 3.5.2a | Receive positive acknowledgment. No further action required. | SVAA | PARMS |
| |
3.5.3b | By +1 WD of 3.5.2b | Receive negative acknowledgment SVAA must ensure prompt submission of rejected data, in correct format in accordance with 3.11. Process returns to 3.5.1. | SVAA | PARMS |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | To timing stated in App. 5.9 or By +1 WD of updates to standing data. | Send data to PARMS. | SVAA | PARMS. | PARMS Report in accordance with BSCP533 Appendix A – PARMS Data Provider File Formats and BSCP533 Appendix B – PARMS Calculation Guidelines. | Email. |
3.6.2a | By +1 WD of 3.6.1 | Log receipt of data, validate and acknowledge successful processing of data. | PARMS | SVAA | Acknowledgement text on Email | |
3.6.2b | By +1 WD of 3.6.1 | Log receipt of data, validate and acknowledge unsuccessful processing of data. | PARMS | SVAA | Acknowledgement text on Email | |
3.6.3a | By +1 WD of 3.6.2a | Receive positive acknowledgment. No further action required. | SVAA | PARMS |
| |
3.6.3b | By +1 WD of 3.6.2b | Receive negative acknowledgment. SVAA must ensure prompt submission of rejected data, in correct format in accordance with 3.11. Process returns to 3.6.1. | SVAA | PARMS |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.8.1 | By +5 WD of receipt of data | Query SVAA data provided to Supplier explaining what data is incorrect and why. | Supplier | PAA | Query Form F533/03 | |
3.8.2 | By +1 WD of 3.8.1 | Log query and acknowledge receipt | PAA | Supplier | Query Form F533/03 plus query number | |
3.8.3 | By +2 WD of 3.8.2 | Analyse query in conjunction with SVAA, where appropriate. SVAA to provide revised data where necessary, in agreed format. PAA will acknowledge receipt of data sent by email. | PAA
SVAA | SVAA
PAA | Query Form F533/03, data
F533/03, F533/04 | Telephone
|
3.8.4 | By +1 WD of 3.8.3 | Provide response to Supplier, attach revised data as appropriate | PAA | Supplier | Query Response Form F533/04 and revised data | |
3.8.5 | Either: By +2 WD of receipt of data in 3.8.4 | Either: a) Agree query resolution and proceed from Ref. 3.8.6. b) Disagree query resolution and give reasons. Proceed from Ref. 3.8.7. | Supplier | PAA | Query Response Form F533/04 and revised data
Letter stating reason for appeal | |
3.8.6 | As required | Utilise data, corrected where appropriate. Go back to relevant section | PAA and/or PARMS |
| Revised data, or existing data | Internal |
3.8.7 | PAB Meeting | Notify the PAB that the Supplier wishes to appeal the decision of PAA/SVAA and provide reasons. | PAA | PAB | Query Response Form F533/04 and reasons for appeal from Supplier | Paper |
3.8.8 | PAB Meeting | PAB rules in the appeal: 1. Appeal upheld – go to section 3.8.6, then 3.8.9 2. Appeal dismissed – go to 3.8.6, then 3.8.9 3. Defer for more information | PAB | PAA | PAB decision | Internal |
3.8.9 | 2 WD after PAB meeting | Communicate PAB decision to Supplier | PAA | Supplier | PAB decision |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.9.1 | At any time | Request Ad-hoc data. | PAB | PAA | Any data as requested by the PAB. | Verbal by PAB agreement. |
3.9.2 | By +1 WD of 3.9.1 | Request Ad-hoc data. Agree format of data and date upon which it will be provided (provision time-scale can be anything up to a maximum of 20 WD). | PAA | Data Provider (if the data to be provided is from a Supplier Agent then the request is made via the associated Supplier). | Request For Information Form F533/02, stating date upon which information required | |
3.9.3 | Within timeframe agreed under 3.9.2 | Provide data in format and to timescales agreed in 3.9.2. | Data Provider | PAA | Data in format agreed under 3.9.2 | |
3.9.4a | By +2 WD 3.9.3 | Assess data, log and acknowledge receipt seeking clarification if necessary. | PAA | Data Provider | Ad-hoc data in agreed format. Form F533/02. | Email or other agreed format |
3.9.4b | By +5 WD of 3.9.4a | Receive acknowledgement and send clarification as necessary. | Data Provider | PAA | Acknowledgement form, F533/03 | |
3.9.5 | By +10 WD of 3.9.4a or b (whichever is later). | Process data as required | PAA |
| Ad-hoc data | Internal |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.10.1 | As required | Request Drill Down data and agree format in which data will be provided. | PAA | Data Provider | Request For Information form F533/02 stating method for data provision. | |
3.10.2 | Within 20 WD of request | Provide data in format agreed with PAA | Data Provider | PAA | Provision of data form F533/02 | |
3.10.3a | By +4 WD of 3.10.2 | Validate data and check for completeness. Log receipt of data and acknowledge receipt requesting clarification as required | PAA | Data Provider | Data acknowledgement form F533/03 Data and validation/ completeness rules (Appendix 5.12.) | Verbal |
3.10.3b | By +4 WD of 3.10.3a | Receive acknowledgement and provide clarification if necessary. | Data Provider | PAA | Clarification Data as agreed | |
3.10.4 | As required | Process data as required | PAA |
| Validated data | Internal action |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.11.1 | 1 WD after date that data/reports required. | Identify those reports that are not received on due date. Request report from Data Provider (Supplier if the Data Provider is a Supplier Agent). | BSC Service Desk | Data Provider | Frequency of report provision and calendar (App 5.9) and Output Data Schedule Request For Information Form F533/02 | Internal
|
3.11.2a | 1 WD after 3.11.1 | Acknowledge request and confirm date upon which report will be provided | Data Provider | BSC Service Desk | Letter stating date upon which report will be provided and reason for delay | |
3.11.2b | By time agreed with PAA | Receive reports | Data Provider | PARMS | Reports requested in 3.11.1 | |
3.11.3 | On date agreed with PAA | Proceed from ref. 3.2.1 or 3.3.1 or 3.4.1 or 3.5.1 as appropriate. |
|
|
|
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.1.1 | On the 26th WD after the last day of the calendar month | Run reports and send to the PAA PAA reviews data | PARMS PAA | PAA | Validated PARMS data as determined by the PAB from the selection of Serials and Market Indicators noted within this BSCP | Internal |
4.1.2 | At any time after 4.1.1 | If appropriate seek clarification of information/drill down data | PAA | Data Provider | Reports | Telephone, Email. |
4.1.3 | In time for PAB | As determined by the PAB from the selection of Serials and Market Indicators noted within this BSCP produce monthly validated PARMS data | PAA | PAB | PARMS Data | Paper |
4.1.4 | At PAB meeting | Request additional information if required | PAB | PAA | Validated PARMS Data as in 4.1.3 | At meeting, via minutes or via Technical Secretary |
4.1.5 | 1 WD after PAB meeting. Request information from Data Providers. | Agree format and timing of data provision (In accordance with ref. 3.9/3.10) | PAA | Data Providers | Instructions from PAB Request for Information Form F533/02 | Telephone, Email, |
4.1.6 | To timescale agreed with PAA | Provide additional information (In accordance with ref. 3.9/3.10) | Data Provider | PAA | Request for additional information Form F533/02 | As agreed with PAA |
4.1.7 | Within 1 WD of 4.1.6 and then as requested | Log receipt of data and acknowledge Analyse data as appropriate and forward to PAB as requested (In accordance with ref. 3.9/3.10) | PAA PAA | Data Provider PAB | Form F533/02 Additional information (and supporting analysis from PAA where appropriate) | Email/ Paper |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.2.1 | 26 WD after the last calendar day of the month | Produce Peer Comparison Reports and send to the PAA. PAA takes Peer Comparison Reports to PAB for authorisation Note: reports are produced quarterly, containing information for performance across the quarter period | PARMS PAA | PAA PAB | Performance Data for utilisation in PARMS and reports to PAB (ref. Appendix 5.15) | Paper |
4.2.2 | At next PAB | Review reports and determine if reports can be circulated. Notify PAA | PAB | PAA | Reports From PAA. Authorisation by majority vote from PAB. | Paper |
4.2.3 | Following PAB decision to circulate reports | Notify PARMS of PAB decision | PAA | PARMS |
| |
4.2.4 | Within 5 WD of receipt of decision | Circulate reports to authorised recipients (ref. Appendix 5.16) | PARMS | Report Recipients | Peer Comparison Reports | Via Email to authorised contacts (as per F533/06) of each Report recipient/Post. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.3.1 | 26 WD after the last calendar day of the relevant month | Produce public Peer Comparison Report(s) and provide to the PAA and authorised Supplier contacts | PARMS PARMS | PAA Suppliers | Public Peer Comparison Report(s) | |
4.3.2 | Within 5 WD of receipt of 4.3.1 | Notify PAA of any queries. If no response is received by 5 WD then PAA shall deem the public Peer Comparison Report(s) as fit for use and proceed to 4.3.3 | Supplier | PAA | Query details on Form F533/07. | |
4.3.3 | Within 2 WD of 4.3.2, if no Query is received from any Supplier | Publish public Peer Comparison Report(s) on BSC Website | PAA |
| Copy of authorised public Peer Comparison Report(s | Internal Process |
4.3.4 | Within 5 WD of 4.3.2, if a Query is received from one or more Suppliers | Acknowledge query and discuss query with Supplier and either: | PAA | Supplier | Query details, relevant public Peer Comparison Report(s) | Email/Phone |
|
| (a) take corrective action and regenerate relevant public Peer Comparison Report(s); | PAA | Suppliers |
| |
|
| (b) determine that query can be resolved with no further action; or | PAA |
|
|
|
|
| (c) if query cannot be resolved, refer to PAB for decision | PAA | PAB |
| |
4.3.5 | If action (c): At next PAB following 4.3.4 | Review reports and determine if public Peer Comparison Report(s) can be published. Notify PAA | PAB | PAA | Public Peer Comparison Report(s) From PAA. Authorisation by majority vote from PAB | Paper |
4.3.6 | Within 2 WD of receipt of PAB decision; or following 4.3.4(a) or (b) | Publish public Peer Comparison Report(s) on BSC Website | PAA | Website | Copy of authorised public Peer Comparison Report(s) | BSC Website |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.4.1 | As required | Decide which new Serials/Standards appropriate for publication in public Peer Comparison Report(s) | PAB |
| Identification of a significant Settlement Risk, non-compliance or performance issue in accordance with the provisions of Section Z of the BSC | Internal process |
4.4.2 | At least 2 months before publication of any new data set(s) | Circulate details of new Serials/Standards to be published in public Peer Comparison Reports Circulate details of publication frequency | PAB | Supplier | Details of new Serials/Standards Details of frequency of publication Appendix 5.15 |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.5.1 | As required | Decide which new Serials/Standards appropriate for publication in non-public Peer Comparison Report(s) | PAB |
| Identification of a significant Settlement Risk, non-compliance or performance issue in accordance with the provisions of Section Z of the BSC. | Internal process |
4.5.2 | At least 2 months before publication | Circulate details of new Serials/Standards to be published in non-public Peer Comparison Reports Circulate details of publication frequency | PAB | Report Recipients | Details of new Serials/Standards
Details of frequency of publication Appendix 5.15 |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.6.1 | In accordance with frequency determined by the BSC Panel in accordance with 4.7.5 | Produce public Peer Comparison league table(s) | BSCCo |
| Public Peer Comparison data set(s) | Internal Process |
4.6.2 | In accordance with frequency determined by the BSC Panel in accordance with 4.7.5 | Publish public Peer Comparison league table(s) on BSC Website | BSCCo |
| Copy of authorised public Peer Comparison league table(s | BSC Website |
4.6.3 | Following 4.6.2 | Notify any queries about data inaccuracies | Performance Assurance Party | BSCCo | Details of Query e.g. specific data items in question and explanation of inaccuracy | risk@elexon.co.uk |
4.6.4 | Following 4.6.3 | Acknowledge query and discuss query with Performance Assurance Party and either: | BSCCo | Performance Assurance Parties | Query details, relevant public Peer Comparison league tales(s) | Email/Phone |
|
| (a) take corrective action and regenerate relevant public Peer Comparison league tables(s); | BSCCo | Suppliers |
| |
|
| (b) determine that query can be resolved with no further action; or | BSCCo |
|
|
|
|
| (c) if query cannot be resolved, refer to PAB for decision | BSCCo | PAB |
| |
4.6.5 | If action (c): At next PAB following 4.6.4 | Review data sets and determine whether data sets can be published in Peer Comparison league tables(s). Notify BSCCo | PAB | BSCCo | Public Peer Comparison league tables(s) from BSCCo. Authorisation by majority vote from PAB | Paper |
4.6.6 | Within 2 WD of receipt of PAB decision; or following 4.6.4(a) or (b) | Publish public Peer Comparison league table(s) on BSC Website | BSCCo | Website | Copy of authorised public Peer Comparison league table(s) | BSC Website |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
4.7.1 | As required | Decide which new data sets appropriate for publication via Peer Comparison Report(s) | PAB |
| Identification of a significant Settlement Risk, non-compliance or performance issue in accordance with the provisions of Section Z of the BSC | Internal process |
4.7.2 | As determined by the PAB | In accordance with BSC Section Z7.2, the PAB may propose for one or more data set(s) to be published via the Peer Comparison Performance Assurance Technique where the PAB anticipates it would have a positive impact on competition and overall market performance.
Before proposing a data set(s) for publication, the PAB will follow the process set out in BSC Section H11 (and any relevant subsidiary document referenced in Section H11) to assess whether the data should be disclosed as if references to the BCB were references to the PAB, and references to BSC Data were references to the data set(s) proposed for publication. The PAB will instruct BSCCo to perform the steps set out in BSC Section H11.
| PAB
PAB | BSC Panel
BSCCo | Proposed data set(s) Justification for their publication Data disclosure recommendation from BSCCo Proposed frequency and duration of publication. | PAB recommendation |
4.7.3 | In conjunction with 4.7.2 | BSCCo will review the candidate data set(s) proposed for publication by the PAB in accordance with the process and principles in BSC Section H11 and produce a data disclosure recommendation for the PAB. The PAB proposal to the Panel in respect of the data set(s) to be published must take into account the recommendation produced by BSCCo as to the potential commercial sensitivity of the data set. | BSCCo | PAB BSC Panel | Assessment of the data set(s) as to the potential commercial sensitivity of the data set – data disclosure recommendation | Internal process |
4.7.4 | At next appropriate Panel Meeting | The BSC Panel reviews the PAB’s recommendations to determine whether any potential commercial sensitivity is balanced against the potential benefits in respect of transparency and competition, and whether the proposed data should be published. | BSC Panel | BSCCo PAB | Decision as to whether the data set should be published, and the frequency and duration of publication. | Panel decision |
4.7.5 | At least 2 months before publication of any new data set(s) | Circulate details of new data sets to be published in public Peer Comparison league tables Circulate details of publication frequency | PAB | Supplier | Details of new data sets Details of frequency of publication
|
Serial | Titled | FILETYPE |
SP07 | SMRA & SVAA MSID Count – SMRA File | P0045002 |
Serial | Titled | FILETYPE |
TA01 | GSP Group Correction Factor | P0137001 |
TA02 | Annual Demand Ratio | P0138001 |
SP07 | SMRA & SVAA MSID Count – SVAA File | P0164001 |
SP08 | Energy and MSIDs on Actuals | P0145002 |
SP09 | NHH Defaults | P0146001 |
Serial | Titled | FILETYPE |
CM01 | CVA MOA Proving Tests | P0133001 |
CM02 | CVA MOA Fault Resolution | P0134001 |
Standing Data | Data Provider | FILETYPE |
PARMS Market Domain Data | SVAA | P0136001 |
Suppliers Trading / Ceased Trading in GSP Groups | SVAA | P0127001 |
Data Flow Description | Data Provider | Data Catalogue Flow Ref |
GSP Group Correction Factor | SVAA | P0048001 |
Energy Settlement Mix | SVAA | P0049003 |
Energy Breakdown (Settlement Period and BM Unit) | SVAA | P0213001 |
Energy Breakdown (BM Unit) | SVAA | P0214001 |
Data Provider | Timescale |
Supplier (Performance Monitoring Reports) | 20 WD after last calendar day of each month |
Supplier (Performance Monitoring Logs) | As agreed with the PAA. |
SMRA | 10 WD after last calendar day of each month |
SVAA | 7 WD after last calendar day of each month or quarter as appropriate with the exception of: 1. Market Indicator data – 1 WD after the end of the previous week 2. MDD – as specified in BSCP509 3. Information on GSP Group Take and Supplier Group Take (needed for calculation of SCs) – 20 WD after last calendar day of each month. 4. Annual GSP Group Take Data – 20 WD after last calendar day of each financial year. |
Standing Data (SVAA) Standing Data (Supplier DPI file) | 1 WD after update 15 WD after last calendar day of each month |
Market Indicator | Frequency |
Energy Settlement mix | Weekly |
Energy Breakdown (Settlement Period and BM Unit) | Weekly |
Energy Breakdown (BM Unit) | Weekly |
National Monthly Cap for each year
Annual GSP Group Take Data (provided by SVAA) – SVA Data Catalogue Flow Reference P0125001
For each GSP Group, the total GSP Group Take in the previous 12 months
The total GSP Group Take for all GSP Groups in the previous 12 months
Supplier Payment Disbursement Factor
Trading Parties Payment Disbursement Factor
Performance Level for each Supplier Serial/Standard and SC payable per unit of failure to meet the level
Trading Party Main Funding Shares for each month
Apportionment data (provided by SVAA or determined from data provided by SVAA) – SVA Data Catalogue Flow Reference P0120002.
For each Supplier in a GSP Group, the Total Supplier deemed take for each month
For each GSP Group the total GSP Group take for each month
For each Supplier in a GSP Group, the Supplier NHH Energy for each month
For each GSP Group, the Total NHH Energy in GSP Group for each month
GSP Groups
Market participants
Market participant roles (supplier, SVA NHHMOA, SVA HHMOA, NHHDC, HHDC, NHHDA, HHDA, SMRA)
Reconciliation Run types
Suppliers Start Trading/Cease Trading in GSP Group: To identify which Suppliers are trading in which GSP Group with a start effective date and if they have ceased trading in the GSP Group, an end effective date – P0127001.
all the output data provided by a particular data provider for a Supplier and its Agents operating in a single GSP Group, where appropriate, for a reporting month in accordance with the output data schedule.
the performance of Suppliers (Serials SP02);
trends in those PARMS reports that are stated in this BSCP.
Serial | Titled | Reporting Level for PC (National or GSP) |
CM01 | CVA MOA Proving Tests | National by CVA MOA |
CM02 | CVA MOA Fault Resolution | National by CVA MOA |
NC11 | Missing NHH Meter Reads & History from Old NHHDC to New NHHDC | GSP Group by NHHDC |
SP02 | Delivery of Performance Logs | National by Supplier |
SP07 | SMRA & SVAA MSID Count | GSP by Supplier |
SP08 | Energy and MSIDs on Actuals | GSP by Supplier |
SP09 | NHH Defaults | GSP by Supplier |
PAB may choose to publish all, none or some of the Serials and Standards set out within this BSCP
PAB is not obligated to choose to publish the same subset of Serials and Standards publicly to those that are made available to the nominated recipient at each Supplier or Supplier Agent
PAB may elect to change (in accordance with this BSCP) the subset of Serials and Standards published to highlight a specific performance issue that has been identified as requiring attention by either the BSC Auditor, the Authority, the Panel or BSCCo in accordance with Section 4.4
PAB shall not change the subset of public PARMS Peer Comparison Reports published in order to highlight the performance of a Supplier or Supplier Agent in a month for which PAB has already seen performance data for that or any other Supplier or Supplier Agent
PARMS Public Peer Comparison Reports shall be routinely updated - at least every two months or at another frequency determined by the PAB
Each public PARMS Peer Comparison Report published must include the performance data of all Suppliers or Supplier Agents for which a full set of data is available across the reporting period
The PAB shall ensure that the format of each Serial or Standard to be published is meaningful for purposes of comparing Supplier or Supplier Agent performance against that Serial or Standard. This means that the PAB shall, amongst other relevant factors, consider in relation to each Serial or Standard to be published, whether to present the data as actual results or as percentages.
To: | BSC Service Desk |
|
| |
From: |
|
Date: |
| |
Company Name: |
|
|
| |
Address: |
|
Participant Id: |
| |
|
|
|
| |
|
|
|
| |
Category of Data Provider | SMRA Supplier * Delete as appropriate |
|
| |
Authorised Personnel: Names: |
|
|
| |
Telephone No: |
|
|
| |
Data submission email address: |
|
|
|
To: |
|
|
| |
Company Name: |
|
|
| |
From: | PAA
|
Date: |
| |
Contact No: |
|
|
| |
|
|
|
| |
Reporting Period:
From: |
|
To: |
| |
|
|
|
| |
Log Query* No: |
|
|
| |
* Delete as appropriate
|
|
|
| |
Description/Request: | ||||
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
|
To: | PAA | Date: |
| |||
From: |
|
Authorised Signature |
| |||
Telephone No: |
|
|
| |||
Category of Data Provider |
SMRA/Supplier/SVAA/CDCA: |
|
| |||
Log No: |
|
|
| |||
|
|
|
| |||
Description of Query:
| ||||||
| ||||||
| ||||||
| ||||||
| ||||||
| ||||||
| ||||||
|
To: |
|
Company Name: |
| |
From: |
Performance Assurance Administrator |
Signature: |
| |
Date: |
|
Telephone No: |
| |
Query No: |
|
|
| |
Response to Query: | ||||
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
|
To: | BSC Service Desk | |||
From (Supplier Name): |
| |||
Date: |
|
Telephone No: |
|
File ID (Taken from the relevant received report) | Reporting Period | Serial | Data Provider |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
File ID (Taken from the relevant received report) | Reporting Period | Serial | Data Provider | Reason for rejection of Data |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
To: |
Performance Assurance Administrator |
|
| |
From: |
|
Authorised Signature: |
| |
Tel: |
|
|
|
|
Log No: |
|
|
| |
Description of Query:
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
| ||||
|
THIS SECTION TO BE USED BY PAA
I hereby acknowledge receipt of your query. | ||||
Name: |
|
Signature: |
| |
Query Number assigned: |
|
Date: |
|
P_A_R_M_S
Email received from:
Received on:
Subject:
The following attachments were processed from this email:
The following problems were encountered when processing this email:
Report created:
|
P_A_R_M_S
Data file:
File type:
Attached to email received on: [DATETIME] from:
Creation date time:
Period End date:
Validation Results:
Report created:
|
P_A_R_M_S The following data has been submitted to PARMS on your behalf by the Participant detailed below. No queries raised on this data by close of business [DD-MMM-YYYY] will be taken as acceptance. It remains your responsibility to ensure all reporting is complete, accurate and BSC compliant.
PARMS Reference:
Serial:
From Participant Id:
From Role Code:
File Name:
Received:
Period End Date:
Contents: [(spooled details)]
Report created: [Sys date/time] |
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
0.1 | Code Effective Date | Re-badged AP533 to form BSCP533 |
|
|
1.1 | Code Effective Date | Submitted to the Panel for approval | NCR313 |
|
2.0 | 27/03/01 | Approved by the Panel on 22/02/2001 |
| P/13/008 |
3.0 | 01/11 | Changes for Modification P68 | P68 | NPAB19/210 |
4.0 | 01/03/03 | Updated to reflect the terminology used in the BSC | CP852 | NPAB22/244 |
5.0 | 01/08/03 | Updated for Modification P62 | P62 |
|
6.0 | 06/01/04 | Updated for Modification P99 | P99 |
|
6.1 | 13/01/04 | Updated with SVG and P99 comments | P99 |
|
7.0 | 01/05/04 | Approved by SVG | P99 |
|
8.0 | 01/07/04 | Consistency Amendments and Working Day timings updates | P99 | SVG41/002 |
9.0 | 04/11/04 | Updated for SVA November 04 Release | CP1016 | SVG43/003 |
10.0 | 23/02/05 | SVA February 2005 Release and BETTA 6.3 | P159, CP1084, CP1091, CP1090, BETTA 6.3 | SVG47/004 |
11.0 | 30/06/05 | SVA June 05 Release | CP1057, CP1088 | SVG52/005 |
12.0 | 03/11/05 | SVA November 05 Release | CP1087 | SVG56/004 |
13.0 | 23/08/07 | P197 Release | P197 CP1176 | 115/04 SVG67/16 ISG68/02 |
14.0 | 26/06/08 | June 08 Release | CP1223 | ISG84/01 SVG84/02 PAB84/11 TDC109/01 |
15.0 | 26/11/08 | P207 Release | P207 | SVG91/06 PAB91/12 |
16.0 | 01/11/10 | November 10 Release | CP1325 | SVG111/01 |
|
|
| CP1339 | SVG116/05 PAB116/06 |
17.0 | 01/07/11 | June 11 Release2 | CP1334 | SVG114/02 |
|
|
| CP1344 | SVG122/02 |
|
|
| CP1348 | SVG125/01 |
18.0 | 07/11/13 | November 2013 Release | CP1387 | PAB145/08 SVG145/04 |
|
|
| CP1399 | PAB152/04 SVG152/08 |
19.0 | 05/11/15 | November 2015 Release | CP1441 | PAB174/04 SVG174/05 |
20.0 | 01/04/17 | 1 April 2017 Standalone Release | P339 Self-Governance | P261/06 |
21.0 | 01/09/21 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
22.0 | 24/02/22 | 24 February 2022 Standard Release | P429 | Ofgem |
23.0 | 23/02/2023 | 23 February 2023 Standard Release | P427 | P328/10 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 SVA MOAs will be subject to the requirements of this PARMS URS for the period of the “SVA MOA Performance Assurance Transition Period” detailed in Section Z 5.1.1A – 5.1.1C
2 Please note: CP1334, CP1344 and CP1348 were implemented as part of the June 2011 Release, effective from 01 July 2011