BSCP15 | BM Unit Registration |
BSCP20 | Registration of Metering Systems for Central Volume Allocation |
BSCP25 | Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points |
BSCP41 | Report Requests and Authorisation |
BSCP65 | Registration of Parties and Exit Procedures |
BSCP68 | Transfer of Registration of Metering Systems between CMRS and SMRS |
BSCP75 | Registration of Aggregation Rules for Volume Allocation Units |
BSCP128 | Production, Submission, Audit and Approval of Line Loss Factors |
BSCP501 | Supplier Meter Registration Service |
BSCP502 | Half Hourly Data Collection for SVA Metering Systems Registered in SMRS |
BSCP503 | Half Hourly Data Aggregation for SVA Metering Systems Registered in SMRS |
BSCP504 | Non Half Hourly Data Collection for SVA Metering Systems registered in SMRS |
BSCP505 | Non Half Hourly Data Aggregation for SVA Metering Systems registered in SMRS |
BSCP508 | Supplier Volume Allocation Agent |
BSCP509 | Changes to Market Domain Data |
BSCP520 | Unmetered Supplies Registered in SMRS |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs |
BSC | Balancing and Settlement Code |
BSCCo | Balancing and Settlement Code Company |
BSCP | BSC Procedure |
CDCA | Central Data Collection Agent |
CMRS | Central Meter Registration Service |
CRA | Central Registration Agent |
CT | Current Transformer |
DC | Data Collector |
DCE | Demand Control Event |
LDSO | Licensed Distribution System Operator |
HHDC | Half Hourly Data Collector |
LLF | Line Loss Factor |
LLFC | Line Loss Factor Class |
MDD | Market Domain Data |
SVA MOA | SVA Meter Operator Agent |
MTC | Meter Timeswitch Class |
MSID | Metering System ID |
NETSO | National Electricity Transmission System Operator |
NHHDC | Non Half Hourly Data Collector |
REC | Retail Energy Code |
SMRA | Supplier Meter Registration Agent |
SMRS | Supplier Meter Registration Service |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
TAA | Technical Assurance Agent |
VT | Voltage Transformer |
WD | Working Day |
Nominated LDSO | The LDSO who has obligations to submit the GSP Group Metered Volume Aggregation Rules. For the avoidance of doubt, the Nominated LDSO is the LDSO who was responsible for a GSP Group on 1 August 2003 or the Scottish Distribution Licensee in respect of that Bulk Supply Point Group under the Settlement Agreement for Scotland on 1 August 2003. |
National Measurement Transformer Error Statement | A list of Current Transformer and Voltage Transformer types which have been approved as an agreed list of national Generic Measurement Transformer Errors. This list can be used by the TAA to replace the Measurement Transformer Test Certificate where no Measurement Transformer Test Certificate exists. |
new connection to be registered in SMRS;
new connection for a Metering System associated with an Exemptable Generating Plant where the Export Meter(s) is registered in CMRS (the procedure for this process is set out in BSCP501); and
transfer of Metering System registration from CMRS to SMRS (the procedure for this process is set out in BSCP68).
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | For all other metering systems. Within 2WD of completion of works associated with a new connection, or LDSO’s agreement with Supplier to register a new MSID. | Notify new MSID data. | LDSO. | SMRA. | MSID, GSP Group Id, LLF Class Id1, Metering Point Address, Connection Type, Metered Indicator, Import/Export Indicator and Associated Import/Export MSID (where applicable). | Electronic or other method, as agreed. |
3.3.2 | Within 1WD2 of accepting a valid registration from the Supplier. | Notify Settlement liability for New MSID. | SMRA. | LDSO. | Supplier Id, MSID, DA Id3, DC Id and Supply Start Date. | Electronic or other method, as agreed. |
3.3.3 | Within 5WD (for HH) or 10WD (for NHH) of installation and commissioning of Metering System by SVA MOA. | Provide Meter Technical Details. | SVA MOA. 4 | LDSO. | D0149 Notification of Mapping Details, D0150 Non Half Hourly Meter Technical Details. (for NHH Metering Systems) OR D0268 Half Hourly Meter Technical Details. (for HH Metering Systems) | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.A.1 | At the earliest opportunity but no later than 16 WD after energisation (if LDSO energises) or 16 WD after receipt of the D0139 from HHMOA (if HHMOA energises) | Commission Measurement Transformers in accordance with Code of Practice 4. | LDSO |
|
| Internal Process. |
3.3.A.2 | At the earliest opportunity but no later than 21 WD after energisation (if LDSO energises) or 21 WD after receipt of the D0139 from HHMOA (if HHMOA energises) | Send complete Commissioning information for the Measurement Transformers to the SVA MOA. | LDSO | SVA MOA | D0383 Notification of Commissioning information. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | Following request or for any other reason. | Establish new connection in accordance with the relevant connection agreement. | LDSO. |
|
| Internal Process. |
3.4.2 | If required, a) at least 20WD before Registration Effective From Date of new connection, or b) at least 40WD before Registration Effective From Date of new connection if new LLFs are intended to be effective from that date. | Register new Systems Connection Point or Boundary Point in accordance with BSCP25. | LDSO.5 | CRA. | BSCP25 Registration of Metering Systems for Central Volume Allocation. | BSCP25 |
3.4.3 | At least 40WD before Registration Effective From Date of Metering System.6 | Register new Metering System with CRA in accordance with BSCP20. | Registrant. | CRA. | BSCP20 Registration of Metering Systems for Central Volume Allocation. | BSCP20. |
3.4.4 | At least 30WD prior to BM Unit Effective From Date. | Register BM Unit with CRA in accordance with BSCP15. | BM Unit Lead Party. | CRA. | BSCP15 BM Unit Registration. | BSCP15. |
3.4.5 | Following 3.4.4. | Notify LDSO of BM Unit registration where BM Unit is embedded within a Distribution System. | CRA. | LDSO. | BM Unit information including Effective From Date. | Post/Fax/Email. |
3.4.6. | At any time but at least prior to 3.4.7 and 3.4.8. | Liaise with other LDSOs in GSP Group to ascertain LLFs.7 | LDSO. | Other LDSOs. | GSP Group ID, Line Loss Factors, other relevant Distribution System information. | Fax/Email/Letter. |
3.4.7 | Following 3.4.6 and at least 40WD prior to LLF Effective Date.8 | Submit LLFs to BSCCo for Panel approval in accordance with BSCP128. | LDSO. | BSCCo. | BSCP128 Production, Submission, Audit and Approval of Line Loss Factors. | BSCP128. |
3.4.8 | At least 20WD prior to Aggregation Rules effective date. | Submit new Aggregation Rules for each Volume Allocation Unit for which the LDSO is responsible as detailed in BSCP75. | LDSO. | CDCA. | BSCP75 Registration of Meter Aggregation Rules for Volume Allocation Units. | BSCP75. |
3.4.9 | Prior to the Effective Date of the Aggregation Rules and as part of 3.4.8 | Provide a copy of the GSP Group Take Aggregation Rules to the LDSO | CDCA. | Nominated LDSO. | GSP Group Take Aggregation Rules from CDCA-I048 | Fax/Letter/Email |
3.4.10 | Following receipt of 3.4.9 | Check revised Aggregation rules for GSP Group. | Nominated LDSO. |
| GSP Group Metered Volume and GSP Group Take Aggregation Rules. | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.1 | At any time. | Issue energisation request. | Supplier. | SVA MOA or LDSO | D0134 Request to Change Energisation Status. | Electronic or other method, as agreed. |
If SVA MOA energises | ||||||
3.5.2 | Within 5WD (for HH) or 10WD (for NHH) of attempting to change energisation status. | Send change of energisation status and initial meter register reading. | SVA MOA. | LDSO, Supplier, DC. | D0139 Confirmation or Rejection of Energisation Status Change. or For Prepayment Meters see the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter. | Electronic or other method, as agreed. |
If LDSO energises | ||||||
3.5.3 | If request rejected and within 2WD of 3.5.1. | Send notification of rejection, including reasons why the request has been rejected. | LDSO. | Supplier. | D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
P0211 Site Visit Rejection.10 or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. | Manual. | |||||
3.5.4 | If request accepted and on the date requested or agreed in 3.5.1. | Energise Metering System and note initial meter register reading. | LDSO. |
|
| Internal Process. |
3.5.5 | Within 5WD of 3.5.4. | Send change of energisation status and the initial meter register reading. | LDSO. | SVA MOA, Supplier. | D0139 Confirmation or Rejection of Energisation Status Change.11 or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | As required and at least 10WD before the requested de-energisation date.13 | Send de-energisation request. | Supplier. | SVA MOA or LDSO | D0134 Request to Change Energisation Status. | Electronic or other method, as agreed. |
If SVA MOA de-energises | ||||||
3.6.2 | Within 5WD (for HH) or 10WD (for NHH) of attempting to change energisation status. | Send change of energisation status and final Meter register reading. | SVA MOA. | LDSO, Supplier, DC. | D0139 Confirmation or Rejection of Energisation Status Change. 13 P0211 Site Visit Rejection. 12 or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. 13 Go to 3.6.1 if required. | Electronic or other method, as agreed. |
If LDSO de-energises | ||||||
3.6.3 | If request rejected and within 2WD (for HH) or 5WD (for NHH) of 3.6.1. | Send notification of rejection, including reasons why the request has been rejected. | LDSO. | Supplier. | D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
|
|
|
|
| P0211 Site Visit Rejection. 12 or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. Go to 3.6.1 if required. | Manual. |
3.6.4 | If request accepted and within 2WD of 3.6.1 (HH only). | Agree time and date for de-energisation. | LDSO | SVA MOA. | De-energisation details. | Telephone or other method, as agreed. |
3.6.5 | Within 2WD of 3.6.4 and before planned date for de-energisation (HH only). | Arrange with HHDC to collect final HH Metered Data. | SVA MOA. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.6.6 | On date and time agreed in 3.6.4(HH only). | Collect final HH Metered Data. | HHDC. |
|
| Internal Process. |
3.6.7 | Immediately following 3.6.6 (HH only). | Confirm final HH Metered Data collection. | HHDC. | LDSO or SVA MOA (if appropriate). | The LDSO or SVA MOA (if appropriate) will telephone the HHDC when it is on site. Following the HHDC collecting the data, the HHDC will provide confirmation to the LDSO or SVA MOA, as appropriate. | Telephone or other method, as agreed. |
3.6.8 | On the date requested or agreed in 3.6.1, or as required (for example, as a result of an emergency). | Obtain final Meter register reading, if available. De-energise Metering System. | LDSO. |
|
| Internal Process. |
3.6.9 | Within 10WD of 3.6.8. | Send change of energisation status and final Meter register reading, if available. | LDSO. | Supplier, SVA MOA. | D0139 Confirmation or Rejection of Energisation Status Change. 13 or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
If LDSO de-energises when not at the request of a Supplier14 | ||||||
3.6.10 | At any time. | Obtain final Meter register reading, if available. De-energise Metering System | LDSO |
|
| Internal Process. |
3.6.11 | Within 10WD of 3.6.10. | Send change of energisation status and final Meter reading, if available. | LDSO | Supplier, SVA MOA. | D0139 Confirmation or Rejection of Energisation Status Change. or For Prepayment Meters either the D0179 - Confirmation of Energisation/De-Energisation of a Prepayment Meter or D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
Supplier led, where the customer seeks a disconnection from the Supplier; and
LDSO led, where the customer seeks a disconnection from the LDSO, or the LDSO needs to disconnect at short notice, for example as a result of an emergency.
In both cases, it may be necessary for the LDSO to de-energise the Metering System; and/or with agreement with the Supplier, remove the assets. If this is the case, then de-energisation should be carried out in accordance with Section 3.6 De-energisation of a Metering System (SVA Only) and the REC; and removal of Meters in accordance with the REC.
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
Supplier led disconnections only | ||||||
3.7.1 | At request of Supplier, or as required. | Supplier requests disconnection of Metering System. | Supplier. | LDSO. | D0132 Request for Disconnection of Supply. | Electronic or other method, as agreed. |
3.7.2 | If request rejected. | Notify Supplier of rejection of disconnection request. | LDSO. | Supplier. | D0262 Rejection of Disconnection. | Electronic or other method, as agreed. |
LDSO led disconnections only | ||||||
3.7.3 | As required15. | Notify Supplier of scheduled disconnection of Metering System | LDSO | Supplier | Disconnection Date and MSID | Electronic or other method, as agreed. |
3.7.4 | Within 5WD of receipt of notification of scheduled disconnection, if Supplier objects16. | Notify LDSO of reason for objecting to the disconnection. | Supplier | LDSO | Reason for objecting to the disconnection, Disconnection Date and MSID | Electronic or other method, as agreed. |
For all disconnections | ||||||
3.7.5 | If request accepted following 3.7.1 or 3.7.3. | Notify SVA MOA and DC of scheduled disconnection; and Arrange for retrieval of final Meter register, de-energisation of Metering System and retrieval of the assets, as appropriate.17 | Supplier | SVA MOA/DC | Disconnection Date and MSID
As per 3.6 De-energisation of a Metering System (SVA Only) and the REC. | Electronic or other method, as agreed. |
3.7.6 | If Metering System is still energised at scheduled time of disconnection. | Decide as to whether to proceed with the disconnection.18 | LDSO |
|
| Internal Process. |
3.7.7 | If the LDSO has agreed with the Supplier to collect the final Meter register reading. | Obtain final Meter register reading, if available. | LDSO |
|
| Internal Process. |
|
| Provide the final Meter register reading or notify that it wasn’t available. | LDSO | SVA MOA | Final Meter register reading. | Electronic or other method, as agreed. |
3.7.8 | On the date of scheduled disconnection | Disconnect Metering System | LDSO. |
|
|
|
3.7.9 | Following 3.7.8. | Notify SMRA of disconnection.19 | LDSO | SMRA | Disconnection Date and MSID. | Manual, electronic or other method, as agreed. |
3.7.10 | On unsuccessful validation of data sent in 3.7.9. | Notify originator of receipt of invalid data. | SMRA | LDSO | MSID, original message identifier and reason for failure. (If MSID is root of error or cause of failure, this data item may be omitted). | Manual, electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.8.1 | As required. | Registrant requests disconnection of Metering System. | Registrant. | LDSO. | Disconnection details. | Fax/Email/Letter. |
3.8.2 | If request rejected. | Notify Registrant of rejection of disconnection request. | LDSO. | Registrant. | Disconnection details and reasons for rejection. | Fax/Email/Letter. |
3.8.3 | If request accepted. | Disconnect Metering System. | LDSO. |
| Disconnection Details. | Internal Process. |
3.8.4 | Following 3.8.3 | Provide certificate of disconnection. | LDSO. | Registrant. | Certificate of disconnection. | Letter. |
3.8.5 | Following 3.8.3. | De-register Metering System in CRA in accordance with BSCP20 | Registrant. | CRA. | BSCP20 Registration of Metering Systems for Central Volume Allocation. | BSCP20. |
3.8.6 | If required and following disconnection. | Submit revised Aggregation Rules for each Volume Allocation Unit for which the LDSO is responsible as detailed in BSCP75. | LDSO. | CDCA. | BSCP75 Registration of Meter Aggregation Rules for Volume Allocation Units. | BSCP75. |
3.8.7 | Prior to the Effective Date of the Aggregation Rules and as part of 3.8.6. | Provide a copy of the GSP Group Take Aggregation Rules to the LDSO. | CDCA. | Nominated LDSO. | GSP Group Take Aggregation Rules from CDCA-I048. | Fax/Letter/Email |
3.8.8 | Following receipt of 3.8.7. | Check revised GSP Group Take Aggregation rules. | Nominated LDSO. |
| GSP Group Metered Volume and GSP Group Take Aggregation Rules. | Internal Process |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.9.1 | As required. | LDSO makes change to Metering Equipment that requires a change to Site Technical Details. | LDSO |
|
| Internal Process. |
3.9.2 | Within 5 WD of 3.9.1 | Send updated Site Technical Details | LDSO. | SVA MOA | D0215 Provision of Site Technical Details | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.10.1.1 | As required. | Submit a minimum sample of 50 CT or 10 VT errors obtained from test records supplied from (i) accredited sources or from (ii) other sources which have been suitably investigated to establish the reliability of the test records. | LDSO | BSCCo | Details of: Equipment Type (HV CT / LV CT / VT) Ratio (Tested) Manufacturer Class Rating (VA) Test Point (Load percentage) Ratio Error and Phase Angle Error at Rated Burden and Test Burden The spreadsheet form contained in Appendix 4.1.1 shall be used for the submission of this data. | Email Spreadsheet |
3.10.1.2 | Within 20WD of 3.10.1.1 | Analyse Data and prepare report. If data conforms to 4.2 and Panel approval is not required, proceed to 3.10.1.4 | BSCCo. |
| See Appendix 4.2 Go to 3.10.1.4 if panel approval not required. | Internal Process |
3.10.1.3 | At Panel Meeting (if Panel approval required) | Review report and approve or reject submission. Inform BSCCo of decision. | Panel | BSCCo | Report and Recommendations | Internal Process |
3.10.1.4 | Within 5WD of 3.10.1.2 or 3.10.1.4 | Notify LDSO whether the CT or VT data has been approved | BSCCo. | LDSO | Panel Decision | Email / Fax / Post |
3.10.1.5 | At the same time as 3.10.1.4 (if approved) | Update the National Measurement Transformer Error Statement | BSCCo. |
|
| Internal Process |
3.10.1.6 | At the same time as 3.10.1.5 | Notify SVA TAA of new generic CT / VT errors | BSCCo. | SVA TAA |
| Email / Fax / Post |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.10.2.1 | As required. | Request that data is removed from the National Measurement Transformer Error Statement stating reason for the removal. | LDSO / SVA TAA | BSCCo. | Equipment Type Ratio Manufacturer Class Rating / VA Explanation of why the CT or VT should be removed from the National Measurement Transformer Error Statement | Email / Fax / Post |
3.10.2.2 | Within 10WD of 3.10.2.1 | Validate the request and assess the impact. Analyse Data and prepare a report and recommendations to the Panel | BSCCo. | Panel |
| Internal Process |
3.10.2.3 | At Panel meeting | Review report and approve or reject submission. Inform BSCCo of decision. | Panel | BSCCo | Report and Recommendations | Internal Process |
3.10.2.4 | Within 5WD of 3.10.2.2 | Notify of whether the request to remove the CT or VT has been successful. | BSCCo. | LDSO / SVA TAA |
| Email / Fax /Post |
3.10.2.5 | If the request has been successful and within 5WD of 3.10.2.3 | Update National Measurement Transformer Error Statement. | BSCCo. |
|
| Internal Process |
3.10.2.6 | At the same time as 3.10.2.4 | Notify the SVA TAA of CT / VT removal. | BSCCo. | SVA TAA |
| Email / Fax / Post |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.12.1 | Within 10WD of the LDSO being informed that a Small Scale Third Party Generating Plant will be or has been installed at a site; OR If the LDSO has to carry out a network condition assessment / reinforcement work before Small Scale Third Party Generating Plant can be installed, then within 10WD of the completion of that work. | Inform the Import Supplier of the installation of a Small Scale Third Party Generation Plant. | LDSO | Import Supplier | D0001 ‘Request Metering System Investigation’. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.14.1 | Within the period of 1WD commencing on the Business Day after the BMRA receives the data from the NETSO specified in Section Q6.9.5 | Notice of the DCE sent to all Category A Authorised Persons, to establish the appropriate operational contact. The Category A Authorised Persons will be used as the contact unless another contact is provided | BSCCo | Category A Authorised Persons from BSC Parties and Party Agents | Notice of the DCE | Email or other method, as agreed. |
3.14.2 | Within the period of 1WD commencing on the Business Day after the BMRA receives the data from the NETSO specified in Section Q6.9.5 | BSCCo will assess the costs and value of the DCE in accordance with the Demand Disconnection Event Threshold Rules and notify BSC Parties, Party Agents and BSC Panel Members of the outcome of its assessment | BSCCo | BSC Parties, Party Agents and BSC Panel | Notice of the outcome of BSCCo assessment | Email, Circular, BSC Website |
3.14.3 | Within 5WD of 3.14.2 | Send notification of Demand Control Event and all affected MSIDs21 | LDSO | BSCCo | P0238 MSIDs affected by Demand Control Event22 | Email to bscservicedesk@cgi.com |
Send details of all CRA-registered BM Units disconnected as a result of the Demand Control Event | LDSO | CDCA | CDCA-I067 Disconnected BM Units | Email or other method, as agreed. | ||
3.14.4 | Following 3.14.3 | Ensure that details of disconnected MSIDs are provided to relevant Supplier Agents and SVAA | BSCCo | All Supplier Agents, SVAA | P0238 MSIDs affected by Demand Control Event |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.15.1 | As required | Submit CT or VT ratio | LDSO | BSCCo | CT and/or VT ratios | Email24 |
3.15.2 | Within 2 WDs of 3.15.1 | Confirm receipt of submitted ratios | BSCCo | LDSO |
| |
3.15.3 | Within 5 WDs of 3.15.1 | Review ratios and approve or reject submission. | BSCCo |
|
| Internal Process |
3.15.4 | Within 2 WDs of 3.15.3 | Notify LDSO whether the CT or VT data has been approved | BSCCo | LDSO |
| |
3.15.5 | Within 2 WDs of 3.15.4 | Send global notification that a new CT or VT ratio has been approved for addition/removal from the valid set. | BSCCo |
|
| Circular |
3.15.6 | 10 WD following 3.15.5 | Update and publish valid set | BSCCo |
| CT and/or VT ratios | Internal Process25 |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.16.1 | Within 5 WD of receiving the D0030 'Aggregated DUoS Report' data flow as part of the Initial Volume Allocation Run (SF) for the last day of a calendar month | Each Licensed Distribution System Operator (LDSO) must send the TUoS Residual Charges Billing Report | LDSO | NETSO | P0321 | SFTP or by other electronic means as may be agreed |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.17.1 | Each year, within 5 WD of receiving the D0030 ‘Aggregated DUoS Report’ data flow sent as part of the Initial Volume Allocation Run (SF) for the last day of September | Each Licensed Distribution System Operator (LDSO) must send the TUoS Residual Charges Tariff Setting Report | LDSO | NETSO | P0322 | SFTP or by other electronic means as may be agreed |
Dom – Domestic
LVN1 – LV No MIC band 1
LVN2 – LV No MIC band 2
LVN3 – LV No MIC band 3
LVN4 – LV No MIC band 4
LV1 – LV MIC band 1
LV2 – LV MIC band 2
LV3 – LV MIC band 3
LV4 – LV MIC band 4
HV1 – HV band 1
HV2 – HV band 2
HV3 – HV band 3
HV4 – HV band 4
EHV1 – EHV band 1
EHV2 – EHV band 2
EHV3 – EHV band 3
EHV4 – EHV band 4
UMS – Unmetered Supplies
Figure 1
Version | Date | Description of Changes | CPs Included | Mods Panel Ref |
1.0 | 01/08/03 | Approved for use by Panel | Modification P62 | 63/024 |
2.0 | 04/11/04 | SVA November 2004 Release | CP955 | SVG/43/003 |
3.0 | 23/02/05 | SVA February 05 Release and BETTA 6.3 | BETTA 6.3, CP1049, CP984, CP992, CP1091 | SVG/47/004 |
4.0 | 03/11/05 | SVA November 2005 Release | CP1105 and CP1139 | SVG/56/004 |
5.0 | 23/08/07 | P197 Release | P197 CP1176 | P/115/04, SVG67/16 & ISG68/02 |
6.0 | 01/11/07 | November 07 Release | CP1184 v2.0 and CP1210 | SVG74/03 ISG79/02 SVG79/02 |
7.0 | 28/02/08 | February 08 Release | CP1199 | SVG79/02 |
8.0 | 06/11/08 | November 08 Release | CP1225 | SVG85/01 |
9.0 | 26/0208 | February 09 Release | CP1250 | SVG93/02 |
10.0 | 20/04/09 | P216 Release | P216 | SVG97/08 |
11.0 | 25/06/09 | June 09 Release | CP1259 | SVG93/02 |
|
|
| CP1279 | SVG93/02 |
|
|
| P222 |
|
12.0 | 07/11/13 | November 2013 Release | CP1384 | SVG144/01 |
|
|
| CP1385 | SVG144/01 |
13.0 | 05/11/15 | November 2015 Release | P305 | SVG176/03 |
14.0 | 03/11/16 | November 2016 Release | CP1458 | SVG187/05 |
15.0 | 01/11/18 | November 2018 Release | CP1495 | SVG204/04 |
|
|
| CP1496 | SVG204/05 |
16.0 | 29/03/19 | 29 March 2019 Standalone Release | P369 | P285/12 |
17.0 | 12/10/20 | P397 Standalone Release | P397 | P298/05 |
18.0 | 24/06/21 | June 2021 Release | CP1530 | SVG238/05 |
19.0 | 01/09/21 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
20.0 | 24/02/22 | February Standard Release | P402 | SVG248/04 |
21.0 | 03/11/22 | November Standard Release | CP1560,CP1563 | ISG253/05, SVG255/04, SVG258/02 |
22.0 | 29/06/23 | June 2023 Standard Release | CP1558 CP1568 | SVG257/06 SVG262/02 |
23.0 | 02/11/23 | November 2023 Standard Release | CP1574 | SVG268/02 |
24.0 | 01/10/24 | 01 October 2024 Non-Standard Release | ORD009 | Directed by Secretary of State |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 LLF Class ID will contain the actual LLF Class ID or, where this is not known, the default LLF Class ID.
2 For notifications received before 18:00 on a Working Day, SMRA will reply by 06:00 on the next Working Day.
3 Agent IDs (DC/DA) and other marked items are not mandatory for a Supplier to register liability whilst the energisation status has not been provided.
4 Following a Change of Supply or Change of Agent (and only for MSIDs first registered after 6 November 2008), the new SVA MOA may request “D0215 – Provision of Site Technical Details” from the LDSO where Meter Technical Details have not been received from the old SVA MOA, or those Meter Technical Details have missing or “unknown” measurement transformer ratios or where there are concerns over the accuracy of the CT/VT ratio held by the SVA MOA. The LDSO shall respond with the D0215 or the “D0382 – Rejection Response for Request to LDSO for Site Technical Details” within 5WD.
5 The registration of a Distribution Systems Connection Point will require the consent of the other interested distributor, as detailed in BSCP20.
6 A registration lead time of 40WD will be required if the LLFs submitted by the LDSO in step 3.4.7 are intended to become effective on and from the Metering System Effective From Date. Where this is not the case the Metering System registration lead time is 20WD as stated in BSCP20.
7 If required, the LDSO may make a formal request to BSCCo via BSCP41 (Report Requests and Authorisations) to receive other LDSOs’ reports on an ongoing basis in order to monitor future changes that may require revisions to LLFs and Aggregation Rules.
8 The lead time for LLF approval may be reduced at the discretion of BSCCo in accordance with BSCP128.
9 Note that energisation of CVA Metering Systems only occurs as part of the connection process described in section 3.4.
10 The use of this data flow is optional.
11 Where there is a failure to change the energisation status, the D0139 is sent only to the Supplier. Where the energisation status is changed, but a meter register reading cannot be taken, the D0139 is sent to all of the above recipients, and a D0002 sent by the SVA MOA to the DC requesting a decision on further action.
12 Note that, unlike in SVA, de-energisation of CVA Metering Systems only occurs as part of the disconnection process described in section 3.8
13 This step could be completed in shorter timescales where the Supplier and SVA MOA/LDSO have reached mutual agreement.
14 For example, as a result of an emergency.
15 The scheduled date should be sufficiently in the future to allow the Supplier to arrange for the collection of final Meter register reading and removal of assets. The exception to this is where the LDSO needs to carry out a disconnection at short notice (for example, as a result of an emergency). Where the LDSO is carrying out a disconnection (for example, as a result of an emergency or with the agreement of the Supplier), the LDSO will record the final Meter reading and recover the assets where safe and practical to do so.
16 If the LDSO has not received any objections from the Supplier within 5WD, then it may assume that the disconnection can go ahead as planned. Objections should be limited to the wrong MSID and/or address for disconnection.
17 The LDSO may agree with the Supplier to carry out these steps.
18 An LDSO shall have the right to refuse to disconnect if the Metering System is still energised.
19 LDSOs may additionally send a D0125 Confirmation of Disconnection of Supply data flow to the Supplier.
20 The National Measurement Transformer Error Statement may be used for the purpose of Technical Assurance where individual measurement transformer errors are not available. This process is designed to amend the data contained in the statement.
21 The Distribution Connection and Use of System Agreement (DCUSA) allows the LDSO to disclose Confidential Information (as defined in the DCUSA) where the LDSO is required or permitted to do so under a Relevant Instrument. The BSC is a Relevant Instrument for the purpose of DCUSA.
22 Please see Appendix 4.3 for details on populating the P0238.
23 This valid set refers to EMDS data item(s) J0454 (CT Ratio) and J0455 (VT Ratio) however the valid set will be managed by BSCCo.
24 LDSOs should email metering@elexon.co.uk with the measurement transformer ratios with which they wish Elexon to update the valid set with.
25 The valid set will be published on the BSCCo website (www.elexonportal.co.uk).
26 For the purposes of the TUoS Residual Charges Billing Report gross Imports are not (GSP Group) corrected nor loss adjusted.
27 This valid set is subject to change and is dependent on the Charging Bands defined in each LDSO’s Relevant Charging Statement.
28 For the purposes of the TUoS Residual Charges Tariff Setting Report gross Imports are not (GSP Group) corrected nor loss adjusted