Panel - approves changes to MDD
MPs – registered in accordance with BSCP38 for the purpose of interfacing with the BSCCo when managing changes to MDD1.
SVAA - receives notification of authorised changes to MDD from BSCCo and is involved in progressing changes to the SVAA calendar, preparing Impact Assessments (IAs), and agreeing release schedules.
The SVAA is to be notified by BSCCo of a change to MDD no later than 7 Working Days (or as otherwise agreed between BSCCo and the SVAA) before the Go Live Date.
MPs have 2 Working Days from the receipt of the MDD to contact BSCCo if they believe that the change to MDD as notified is not as agreed or invalid. If BSCCo determines that the MDD publish is not as agreed it will assess the severity of the impact of any error. BSCCo will then determine whether any relevant error should be removed in the next publish of MDD or whether the emergency fix process should be used (see Section 3.5).
BSCP01 | Overview of Trading Arrangements |
BSCP15 | BM Unit Registration |
BSCP25 | Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points |
BSCP38 | Authorisations |
BSCP40 | Change Management |
BSCP65 | Registration of Parties and Exit Procedures |
BSCP507 | Supplier Volume Allocation Standing Data Changes |
BSCP508 | Supplier Volume Allocation |
BSCP520 | Unmetered Supplies Registered in SMRS |
BSCP537 | Qualification Processes for SVA Parties, SVA Party Agents and CVA MOAs |
AFYC | Average Fraction of Yearly Consumption |
BM | Balancing Mechanism |
BMS | Baseline Management System |
BSCCo | Balancing and Settlement Code Company |
BSCP | Balancing and Settlement Code Procedure |
CD | Compact Disc |
CDCA | Central Data Collection Agent |
CPC | Change Proposal Circular |
CRA | Central Registration Agent |
EAC | Estimated Annual Consumption |
FAA | Funds Administration Agent |
GAD | Group Average Demand |
GSP | Grid Supply Point |
IA(s) | Impact Assessment(s) |
ID | Identifier |
LDSO | Licensed Distribution System Operator3 |
LLFC | Line Loss Factor Class |
MDD | Market Domain Data |
MDD CR | Market Domain Data Change Request |
MP(s) | Market Participant(s) |
MPID | Market Participant Identifier |
MPR | Market Participant Register |
MTC | Meter Timeswitch Class |
PAB | Performance Assurance Board |
PC | Profile Class |
PEG | Profiling Expert Group |
PrA | Profile Administrator |
RECCo | Retail Energy Code Company |
SAA | Settlement Administration Agent |
SD | Settlement Day |
SMETS | Smart Metering Equipment Specifications |
SMRA | Supplier Meter Registration Agent |
SSC | Standard Settlement Configuration |
SVA | Supplier Volume Allocation |
SVA MOA | Supplier Volume Allocation Meter Operator Agent |
SVAA | Supplier Volume Allocation Agent |
TPR | Time Pattern Regime |
UMS | Unmetered Supplies |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | As required within the terms of the contract. | Send GADs. | PrA | BSCCo. | GADs. | Email. |
3.1.2 | Within 5 WD of 3.1.1 | Send GADs. | BSCCo. | PEG. | GADs; latest population data for each GSP and Profile Class. | Email. |
3.1.3 | Within 15 WD 3.1.2 | Consider the GADs, associated information and any additional relevant data in accordance with the PEG Terms of Reference; make recommendations for submission to the Panel. | PEG. | BSCCo. | Recommendations on the suitability of Profile Class data. | Email. |
3.1.4 | In accordance with the deadlines associated with the meeting in 3.1.5. | Submit PEG recommendations to the Panel for approval. | BSCCo. | Panel. | PEG recommendations. | Internal Process. |
3.1.5 | At next Panel meeting | Consider the PEG recommendations and notify BSCCo of decisions made. | Panel. | BSCCo. | Panel decisions on PEG recommendations. | By Committee. |
3.1.6 | Within 1 WD | Notify relevant parties of Panel decisions regarding the PEG recommendations. | BSCCo. | PEG, PrA. | Panel decisions, details of any associated actions and timescales. | Email. |
3.1.75 | As required within the terms of the contract. | Send draft technical deliverables. | PrA. | BSCCo. | Draft technical deliverables and any supporting information (see Appendix 4.1 for valid MDD entities). | CD/Email. |
3.1.8 | Within 1 WD of 3.1.7. | Send draft technical deliverables for review. | BSCCo. | PEG. | Draft technical deliverables and any supporting information. | Email. |
3.1.9 | Within 15 WD of 3.1.8. | Provide comments on draft technical deliverables. | PEG. | BSCCo. | Comments. | Email. |
3.1.10 | Within 3 WD of 3.1.9. | Consolidate comments and return to PrA. | BSCCo. | PrA. | Consolidated comments. | Email. |
3.1.11 | By 10 WD before contract acceptance date. | Send updated draft technical deliverables. | PrA. | BSCCo. | Updated draft technical deliverables and any supporting information (see Appendix 4.1 for valid MDD entities). | CD/Email. |
3.1.12 | Within 1 WD of 3.1.11. | Raise and log MDD CR. | BSCCo. |
| F509/016 Part A in Appendix 4.2 Updated draft technical deliverables and any supporting information. | Internal process. |
3.1.13 | On same WD as 3.1.12. | Send MDD CR and updated draft technical deliverables to MPs for IA. | BSCCo. | MPs. | F509/01 Part A in Appendix 4.2 Updated draft technical deliverables and any supporting information. | Email/ Fax. |
3.1.14 | Within 5 WD of 3.1.13 and if MPs have comments. | Return IA and comments. | MPs. | BSCCo. | Comments and IA. | Email/ Fax. |
3.1.15 | Within 1 WD of 3.1.14. | Consolidate IA comments and submit MDD CR to Panel for approval. | BSCCo. | Panel. | Updated draft technical deliverables with supporting information, including consolidated comments and IA from MPs. | Internal process. |
3.1.16 | At next Panel meeting. | Consider MDD CR, IA and consolidated comments and approve or reject MDD CR. | Panel. |
| MDD CR IA, consolidated comments and proposed draft technical deliverables with supporting information. | By Committee. |
3.1.17 | Within 1 WD of 3.1.16. | Notify Panel decision. | Panel. | BSCCo. | Approval or rejection of MDD CR. Proceed in accordance with BSCP508. | Email/ Fax. |
3.1.18 | Within 1 WD of 3.1.17 | Notify Panel decision. | BSCCo. | MPs, SVAA. | MDD Circular. | Email/ Fax. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.1 | Following authorisation of FAA Payment Calendar. | Authorise SVAA to create draft SVAA Calendar | BSCCo. | SVAA. |
| Email. |
3.2.2 | Within 5 WD of 3.2.1 | Generate draft version of the SVAA Calendar and submit for review. | SVAA. | BSCCo. | Draft SVAA Calendar. | Internal process. |
3.2.3 | Within 10 WD of 3.2.2. | Resolve any issues with draft SVAA Calendar. | BSCCo. | SVAA and if appropriate, SAA / FAA / CDCA. |
| Manual. |
3.2.4 | Within 1 WD of 3.2.3 | Send revised SVAA calendar | BSCCo | SVAA. | Revised SVAA Calendar | |
3.2.5 | Within 2 WD of 3.2.4. | Agree revised SVAA Calendar. | SVAA. | BSCCo. |
| Email. |
3.2.6 | Within 1 WD of 3.2.5. | Raise MDD CR. | BSCCo. |
| Proceed in accordance with 3.3. | Internal process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | As required. | Submit MDD CR and associated paperwork.8 | Originator. | BSCCo. | F509/016 form and relevant parts of MDD Entity forms document. Appendix 4 details the changes that can be raised and the originators that can raise them. | Email / Fax. |
3.3.2 | No later than the MDD CR submission9 deadline set out in the process for the following MDD version. | Review, raise and log MDD CR. | BSCCo. |
| MDD CR and any supporting information. | Internal process. |
3.3.3 | If required following 3.3.2 | Provide review comments | BSCCo | Originator | Comments on content of MDD CR (F509/01) form submitted | Email/Fax |
3.3.4 | If required following 3.3.3 | Submit new/revised MDD CR if required (return to 3.3.1) | Originator | BSCCo |
| Email/Fax |
3.3.5 | Following 3.3.2 and if BM Unit change required. | If MDD CR relates to BM Unit(s), liaise with CRA and confirm they have received notification of forthcoming BM Unit(s) registration. | BSCCo. | CRA. | MDD CR. | Email / Fax. |
3.3.6 | Following 3.3.2 | Send MDD CR for SVAA IA. | BSCCo. | SVAA. | MDD CR and any supporting information. | Email / Fax. |
3.3.7 | Within 3 WD of 3.3.6 | Return SVAA IA. | SVAA. | BSCCo10. | Results of SVAA IA. | Email. |
3.3.8 | Following analysis of SVAA IA. | Report outcome of SVAA IA. | BSCCo. | Originator. | Results of SVAA IA. | Email / Fax. |
3.3.9 | If revision needed to MDD CR. | Submit new / revised MDD CR if required (return to 3.3.1). | Originator. | BSCCo |
| Email / Fax. |
3.3.10 | Within 2 WD of 3.3.9. | Send details of MDD CR, any supporting information and summary of SVAA IA for IA. | BSCCo. | MPs, SVAA. | MDD Circular, including details of change and summary of SVAA IA. | Email / Fax. |
3.3.11 | Within 5 WD of 3.3.10. | Return IA and comments. | MPs, SVAA. | BSCCo. | IA and comments on proposed MDD CR. | Email / Fax. |
3.3.12 | Within 2 WDs of 3.3.11 | Consolidate comments of MPs, decide whether to recommend for approval. | BSCCo. | Originator, if necessary. | IA and comments on proposed MDD CR. | Email / Fax. |
3.3.13 | As required. | Submit MDD CR for approval. | BSCCo. | Panel. | Details of MDD CR and all relevant IAs and consolidated comments. | Internal process. |
3.3.14 | At next Panel meeting. | Consider MDD CR, IA and consolidated comments and approve or reject MDD CR. | Panel. |
|
| Internal process. |
3.3.15 | Within 1 WD of 3.3.14 | Notify Panel decision. | Panel. | BSCCo. | Proceed in accordance with BSCP508 for publication of MDD. | Email / Fax. |
3.3.16 | Within 1 WD of 3.3.15 | Notify Panel decision via MDD Circular. | BSCCo. | SVAA, MPs, Originator. | MDD Circular. | Email / Fax. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | Prior to anticipated publish of MDD. | Liaise with SVAA and agree timetable11 for publish of forthcoming MDD releases. | BSCCo. | SVAA. | Proposed timetable of publish and go live dates and SVG meeting dates. | Email. |
3.4.2 | Within 5 WD of 3.4.1. | Provide comments on timetable of forthcoming MDD releases. | SVAA. | BSCCo. | Comments on proposed forthcoming MDD releases. | Email. |
3.4.3 | Within 1 WD of 3.4.2. | Address comments from SVAA on forthcoming MDD releases and approve. | BSCCo. |
|
| Internal process. |
3.4.4 | Within 1 WD of 3.4.3. | Notify SVAA of approved MDD releases. | BSCCo. | SVAA. | Agreed timetable for forthcoming MDD releases. | Email. |
3.4.5 | Once MDD release schedule agreed. | Issue MDD Circular notifying MPs of future MDD release schedule. Publish MDD Circular on MDD page of the BSC website. | BSCCo. | MPs, SVAA. | MDD Circular. | Email./ Website publication. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.1 | Problem requiring an emergency fix. | Identify MDD problem and notify of urgency for resolution. | MPs, SVAA, BSCCo. | BSCCo. | Details of problem and urgency for resolution. | Phone / Email. |
3.5.2 | As soon as possible after identifying. | Analyse problem, identify solution and liaise with SVAA. | BSCCo. | SVAA. | As appropriate. | Phone / Email. |
3.5.3 | Following agreement of action to be taken. | Obtain authorisation to implement emergency fix13. | BSCCo. | Panel | Analysis and generation of solutions and associated timescales. | Internal Process. |
3.5.4 | Following authorisation. | Resolve problem in accordance with agreed approach. | BSCCo. | MPs, SVAA. | As appropriate. | Phone / Email. |
3.5.5 | As soon as possible. | Instruct MDDM to re-publish MDD. | BSCCo. | MDDM. | Instruction to re-publish MDD. Proceed in accordance with BSCP508. | Email / Fax. |
3.5.6 | As soon as possible. | Raise MDD CR(s) and send details of changes. | BSCCo. | MPs, SVAA, and other BSC Agents. | MDD Circular detailing all changes to be made. | Email / Fax. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | As required | Submit MDD CR14 which has been selected as a housekeeping change and associated paperwork or a new Market Participant submits a CR to register in MDD15 or CR submitted for Additional BM Units | Originator. | BSCCo. | F509/016 form and relevant MDD Entity forms (including justification for being a Housekeeping CR). | Email / Fax. |
3.6.2 | No later than the Change Request submission deadline16 set out in the process for the following MDD version. | Determine that CR is Housekeeping or Originator is a new Market Participant or CR is for Additional BM Units. Review and log MDD CR. | BSCCo. |
| MDD CR and any supporting information. | Internal process. |
3.6.3 | If required following 3.6.2 | Provide review comments | BSCCo | Originator | Comments on content of MDD CR (F509/01) form submitted | Email/Fax |
3.6.4 | If required following 3.6.3 | Submit new/revised MDD CR if required (return to 3.3.1) | Originator | BSCCo |
| Email/Fax |
3.6.5 | Following 3.6.2 and if BM Unit change required. | If MDD CR relates to BM Unit(s), liaise with CRA to confirm they have received notification of forthcoming BM Unit(s) registration. | BSCCo. | CRA. | MDD CR. | Email / Fax. |
3.6.6 | Following 3.6.5 | Send MDD CR for SVAA IA. | BSCCo. | SVAA. | MDD CR and any supporting information. | Email / Fax. |
3.6.7 | Within 3 WD of 3.6.6 | Return SVAA IA. | SVAA. | BSCCo. | Results of SVAA IA. | Email. |
3.6.8 | Following analysis of SVAA IA. | Report outcome of SVAA IA. | BSCCo. | Originator. | Results of SVAA IA. | Email / Fax. |
3.6.9 | If revision needed to MDD CR. | Submit new / revised MDD CR if required (return to 3.6.1). | Originator. | BSCCo. |
| Email / Fax. |
3.6.10 | Within 2 WDs of 3.6.9 | Consider MDD CR and comments from SVAA. Decide whether the change should be made. Notify Originator. | BSCCo. | Originator, if necessary. | IA and comments on proposed MDD CR. | Email / Fax. |
3.6.11 | At next available opportunity | Notify Panel of Housekeeping and / or new Market Participant change made and / or new Additional BM Units changes made. | BSCCo. | Panel. | Details of MDD CR and all relevant IAs and consolidated comments. | Internal process. |
3.6.12 | Within 1 WD of 3.6.11 | Notify Housekeeping change and / or new Market Participant registration made and / or new Additional BM Unit changes made via MDD Circular. Publish MDD Circular on MDD page of the BSC website. | BSCCo. | SVAA, MPs, Originator. | MDD Circular. | Email / Fax / Website |
No | Description | Authorisation Route | Originator |
1 | Market Participant | 3.3 | Market Participants, RECCo |
2 | GSP Licensed Distribution Systems Operator | 3.3 | LDSO |
3 | SVA Agent Appointment | 3.3 | BSCCo / BSC Party |
4 | SMRA Appointment | 3.3 | Panel Secretary |
5 | Default Period Profile Class Coefficient | 3.1 | BSCCo |
6 | GSP Group Average EAC | 3.1 | BSCCo |
7 | Period Regression Equation | 3.1 | BSCCo |
8 | Profile Regression Equation Set | 3.1 | BSCCo |
9 | Profile Set | 3.1 | BSCCo |
10 | Regression Coefficient | 3.1 | BSCCo |
11 | Average Fraction of Yearly Consumption Set17 | 3.3 | BSC Party |
12 | Average Fraction of Yearly Consumption (AFYC) | 3.3 | BSC Party |
13 | GSP Group Profile Class Average EAC | 3.3 | BSC Party |
14 | Clock Time Change18 | 3.3 | BSCCo |
15 | Settlement Calendar | 3.2 | SVAA |
16 | Year18 | 3.3 | BSCCo |
17 | Line Loss Factor Class (LLFC) | 3.3 | LDSO |
18 | GSP Group | 3.3 | BSCCo |
19 | GSP Group Correction Scaling Factor | 3.3 | BSCCo |
20 | GSP Group Profile Class Default EAC | 3.3 | BSCCo |
21 | Market Role | 3.3 | BSC Party |
22 | Settlement Day (SD) 18 | 3.3 | BSCCo |
23 | Settlement Period18 | 3.3 | BSCCo |
24 | Smoothing Parameter | 3.3 | BSC Party |
25 | Threshold Parameter | 3.3 | BSC Party |
26 | Yearly Season Details18 | 3.3 | BSCCo |
27 | Clock Interval | 3.3 | Supplier |
28 | Clock Time Pattern Regime | 3.3 | Supplier |
29 | Measurement Requirement | 3.3 | Supplier |
30 | Profile | 3.3 | BSC Party |
31 | Profile Class | 3.3 | BSC Party |
32 | Standard Settlement Configuration (SSC) | 3.3 | Supplier / BSCCo |
33 | Teleswitch TPR | 3.3 | Supplier |
34 | Teleswitch Register Rule | 3.3 | Supplier |
35 | Teleswitch Contact Rule | 3.3 | Supplier |
36 | Teleswitch Contact | 3.3 | Supplier |
37 | Teleswitch Group | 3.3 | Supplier |
38 | Time Pattern Regimes (TPR) | 3.3 | Supplier |
39 | Valid Measurement Requirement Profile Class | 3.3 | Supplier |
40 | Valid Settlement Configuration Profile Class | 3.3 | Supplier |
41 | Consumption Component Class | 3.3 | BSC Party |
42 | Day of the Week | 3.3 | BSCCo |
43 | Day Type | 3.3 | BSCCo |
44 | Energisation Status | 3.3 | BSC Party |
45 | Market Participant Role | 3.3 | Market Participant / BSCCo/ RECCo |
46 | Measurement Class | 3.3 | BSC Party |
47 | Measurement Quantity | 3.3 | BSC Party |
48 | Data item now redundant | N/A | N/A |
49 | Regression Coefficient Type | 3.3 | BSC Party |
50 | Season | 3.3 | BSC Party |
51 | Settlement Type | 3.3 | BSC Party |
52 | Meter Timeswitch Class (MTC) | 3.3 | BSC Party |
53 | Meter Timeswitch Class for Distributor19 | 3.3 | BSC Party |
54 | Valid MTC SSC Combination | 3.3 | BSC Party |
55 | Valid MTC LLFC Combination | 3.3 | BSC Party |
56 | Valid MTC LLFC SSC Combination | 3.3 | BSC Party |
57 | MTC Meter Type | 3.3 | BSC Party |
58 | MTC Payment Type | 3.3 | BSC Party |
59 | HH Default EAC | 3.3 | BSCCo |
60 | GSP Group Profile Class Tolerances | 3.3 | BSCCo |
61 | BM Unit for Supplier in GSP Group | 3.3/3.6 | Supplier / BSCCo |
62 | Unmetered Supplies Operational Information20 | 3.3 | BSCCo |
63 | Valid MTC LLFC SSC PC Combination19 | 3.3 | BSC Party |
64 | SMETS Version | 3.3 | BSCCo |
MDD Change Request Form - F509/01 | MDD CR Number (For BSCCo use) |
| |
Part A - Completed by Originator and submitted to BSCCo
Market Participant Id (MPID)………………...Market Participant Role Code……………………….. MDD Entity Forms Attached……………………
Details of proposed change.............................................................................................................
……………………………………………………………………………………………………. Reason for Change……………………………………………………………………………………….
Originator’s Name ................................................ Company ..............................................
Party ID………………………………………….Password…………………………………………….
Date………………………(Authorised in accordance with BSCP38 except Non-BSC Parties)
Fast Track (3.6) (Please delete one)…..Y / N
Please tick this box to indicate that approval has been obtained from the relevant Party for data items linked to an MDD Change which is/are not the responsibility of the Originator
| |
Part B - Completed by BSCCo and submitted to SVA Agent
I confirm that appropriate authorisation has now approved the above MDD Change Request.
Please implement the change, ensuring publication no later than (calendar date): .................................
with a Go Live Date of .............................................................................................
BSCCo Name ......................................... Date- ........................................................
| |
Part C - Completed by SVA Agent and returned to the BSCCo
I confirm that above MDD Change Request has been implemented.
SVAA Name ...................................... Date ........................................................................
|
Acceded (Registered as a BSC Party); and
Qualified (Proven that they can interface with Central Systems).
Acceded (Registered as a BSC Party); and
Qualified (Proven that they can interface with Central Systems).
Have gained PAB approval that their SMRS has completed Qualification (in accordance with BSCP537).
Completed Qualification i.e. gained approval from PAB (in accordance with BSCP537) that they have completed the Qualification process.
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
D0.1 | Code Effective Date | Full document before Re-Badging |
|
|
D.0.2 | Code Effective Date | Re-Badging |
|
|
D0.3 | Code Effective Date | Incorporated Version D.02 comments |
|
|
D0.4 | Code Effective Date | Incorporated Version D.03 comments |
|
|
D.05 | Code Effective Date | Comments embodied following CMC1273 |
|
|
2.0 | Code Effective Date | Approved for use by the Panel |
|
|
3.0 | Code Effective Date | Version alignment changes from AP509 embodied. | NCR329 |
|
4.0 | 03/02/03 | SVA Documentation Batch Release. | CP608, CP721, CP727 | SVG22/275 |
5.0 | 29/05/03 | P81 ‘Removal of the Requirement for Half Hourly Metering on Third Party Generators at Domestic Premises’. | P81 | SVG27/366 |
6.0 | 24/06/03 | Approved Modification P106 for CVA Programme June 03 Release | P106 |
|
7.0 | 01/08/03 | Updated for Modification P62 | P62 | SVG29/390 |
8.0 | 27/11/03 | Approved Change Proposal 923 | CP923 |
|
9.0 | 03/11/04 | Change Proposal for the CVA Programme Nov 04 Release | CP1032 | TDC58/03 |
10.0 | 23/02/05 | SVA and CVA February 05 Release | CP1041, CP1049, CP1091 |
|
11.0 | BETTA Effective Date | BETTA 6.3 | BETTA 6.3 | SVG48/004 |
12.0 | 29/06/06 | June 2006 Release | CP1150 | SVG/64/02 |
13.0 | 22/02/07 | Draft February 07 Release | CP1158, CP1172, CP1176 | SVG66/04 ISG66/06 |
14.0 | 23/08/07 | P197 Release | P197 | P/115/04 |
15.0 | 01/11/07 | November 07 Release | CP1190, CP1210 | SVG77/04 ISG79/02 SVG79/02 |
16.0 | 26/06/08 | June 08 Release | CP1216 | SVG82/03 |
17.0 | 25/06/09 | June 09 Release | CP1270 | SVG97/01 |
|
|
| CP1271 | SVG97/01 |
18.0 | 05/11/09 | November 09 Release | CP1269 | SVG97/01 |
19.0 | 04/11/10 | November 10 Release | CP1327 | SVG112/03 |
20.0 | 07/11/13 | November 2013 Release | CP1390 | SVG148/04 |
21.0 | 27/02/14 | 27 February 2014 Release | CP1396 | SVG153/03 |
22.0 | 01/08/14 | Electricity Market Reform | ORD005 | Directed by the Secretary of State |
23.0 | 01/09/21 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 The previous version of BSCP509 required MPs to register in accordance with form F509/02 which was contained within this BSCP.
2 BSCP509 Appendix 2: MDD Change Request Entity Validation, details an array of scenarios in which an MDD CR may be required along with the information that should be included with such MDD CRs.
3 LDSOs will include Independent LDSOs.
4 The PEG consists of volunteer industry experts requested by Elexon and appointed on an ad-hoc basis.
5 Steps 3.1.7- 3.1.10 may be repeated on request of the PrA as long as this does not prejudice the timescale in 3.1.11.
6 F509/01 form must be completed with the aid of the scenarios set out in BSCP509 Appendix 2: MDD Change Request Entity Validation
7 Approved MDD changes for new Suppliers, new LDSOs, existing LDSOs and new Party Agents should be made in accordance with the criteria in Appendix 4.3. MDD changes related to MDD Housekeeping, Registration of New Market Participants or registration of Additional BM Units should follow 3.6.
8 Participants raising CRs relating to Additional BM Unit registration, BM Unit deregistration or Cessation of Supplier should ensure the procedures within BSCP15 are followed. Participants raising CRs in relation to the registration or deregistration of a Supplier ID should ensure the procedures within BSCP65 are followed. BSCCo will raise CRs relating to Unmetered Supplies Operational Information in accordance with BSCP520. GPS Group Registration is progressed through BSCP25.
9 Refer to the MDD release schedule published on the BSC Website for general changes.
10 If any proposed change(s) will result in a change to the MDD software, proceed in accordance with BSCP40.
11 BSCCo will issue a release schedule for general changes to MDD and for new Market Participants,Party Agents and Additional BM Units. The Change Request submission dates will differ for each type of change, however they will both be included in the same MDD Publish.
12 An emergency fix will only be required if, following an MDD publish and subsequent go-live, an error in the MDD data is reported, either by BSCCo, the SVAA or a Market Participant. An emergency fix can be defined as an additional publish of MDD which would include an incremented version number.
13 Authorisation to be sought from Panel.
14 A Housekeeping CR is one which is of a minor nature and it is self-evident that the change would improve the data within MDD.
15 This may include Market Participant, Market Participant Role, SMRA Appointment and / or BM Unit for Supplier in GSP Group data.
16 Refer to the MDD release schedule published on the BSC Website for new Market Participants and Party Agents.
17 A change to end the use of an AFYC Set will not be permitted if it results in SVA Metering Systems having invalid combinations of Profile Class, SSC and GSP Group.
18 The annual updates of these entities will be progressed simultaneously.
19 Changes relating to this entity shall be agreed with the relevant LDSO prior to making a formal submission.
20 This information is not included in the MDD database, but can be found on the BSC Website.
21 Excluding SVA MOAs who will be qualified in accordance with the Retail Energy Code Qualification and Maintenance Schedule