Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
Version | Date | Description of Changes | Changes Included | Mods /Panel Committee Ref |
D0.1 | Code Effective Date | Full document before Re-Badging |
|
|
D0.2 | Code Effective Date | Re-Badging |
|
|
D0.3 | Code Effective Date | Incorporate Version D.02 review comments |
|
|
D.04 | Code Effective Date | Comments embodied following CMC1273 |
|
|
2.0 | Code Effective Date | Approved for use by the Panel |
|
|
2.1 | Code Effective Date | Incorporates agreed (red-lined) changes and review comments for NCR131. These changes were approved by the Panel on the 30th November 2000. | NCR191 |
|
3.0 | Code Effective Date | Version 2.1 with red-lined changes accepted |
|
|
4.0 | Code Effective Date | Version alignment changes from AP508 (NCR329) and essential improvements (NCR266) embodied. | NCR266, NCR329 |
|
5.0 | Code Effective Date | Changes for Modification P30. | AR1183 |
|
6.0 | 24/09/02 | Changes for Modification P61. |
|
|
7.0 | 03/02/03 | Changes for SVA Documentation Batch. | CP665, 667, 696, 724, 727 | SVG/22/275 |
8.0 | 17/03/03 | Changes for Modification P91. |
| SVG/24/319 |
9.0 | 01/08/03 | Updated for Modification P62 | P62 | SVG/29/390 |
10.0 | 28/08/03 | August 2003 SVA Document Batch Release | CP854 | SVG/30/397 |
11.0 | 27/11/03 | Updated for Modification P116 | P116 | SVG/33/447 |
12.0 | 04/11/04 | SVA November 04 Release | CPs 887, 947, 950, 1032 | TDC/58/03 SVG/43/003 |
13.0 | BETTA Effective Date | BETTA 6.3 and SVA February 05 Release CPs agreed by SVG | CP942, BETTA 6.3, CP1091 | SVG/48/004 |
14.0 | 23/02/06 | SVA February 06 Release | CP1093, CP1125, P192 | SVG/51/003 SVG/52/002 |
15.0 | 23/08/07 | P197 Release | P197, CP1176 | P/115/04, SVG/67/16, ISG/68/02 |
16.0 | 26/06/08 | June 08 Release | CP1223 | SVG84/02, ISG84/01, TDC109/01, PAB84/11 |
17.0 | 20/04/09 | P216 Release | P216 | ISG97/02 SVG92/08 |
18.0 | 25/02/10 | February 10 Release | CP1295 | SVG102/01 |
19.0 | 03/11/11 | November 11 Release | P253 | SVG127/13 |
20.0 | 23/02/12 | February 12 Release | CP1347 | SVG125/03 |
21.0 | 01/08/14 | Electricity Market Reform | ODR005 | Directed by the Secretary of State |
22.0 | 25/06/15 | June 2015 Release | CP1426 | ISG166/06, SVG169/05 |
23.0 | 05/11/15 | November 2015 Release | P300 | P228/06 |
|
|
| P305 | SVG176/03 |
24.0 | 30/06/16 | June 2016 Release | P315 | SVG184/02 |
25.0 | 02/11/17 | November 2017 Release | CP1484 | Panel 266/06 |
26.0 | 28/02/19 | February 2019 Release | P344 | Panel 284C/01 |
27.0 | 29/03/19 | 29 March 2019 Standalone Release | P369 | Panel 285/12 |
28.0 | 27/06/19 | June 2019 Release | P367 Self-Governance | SVG219/02 |
29.0 | 07/11/19 | November 2019 Release | P368 Self-Governance | Panel 291/05 |
30.0 | 01/04/20 | 1 April 2020 Standalone Release | P354 | SVG229/07 |
31.0 | 12/10/20 | P397 Standalone Release | P397 | P298/05 |
32.0 | 01/04/21 | 1 April 2021 Standalone Release | CP1531 | SVG235/03 |
33.0 | 01/09/21 | 1 September 2021 Non-Standard Release | P420 | P316/05 |
SVAA shall calculate Secondary Half Hourly Consumption (non Losses) and Secondary Half Hourly Consumption (Losses) in accordance with Annex S-2 section 7, and send to the VLP(s) for the relevant Secondary BM Unit.
SVAA shall calculate Secondary BM Unit Demand Volume, by summing Secondary BM Unit Demand Volumes (non Losses) and Secondary BM Unit Delivered Volumes (Losses) for a particular Secondary BM Unit, and send to the SAA.
SVAA shall calculate Secondary Half Hourly Delivered (non Losses) and Secondary Half Hourly Delivered (Losses) in accordance with Annex S-2 section 7, and send to the Supplier(s) for the relevant (Primary) BM Unit(s)3.
SVAA shall calculate MPAN Applicable Balancing Services Volume Data (non-losses) and MPAN Applicable Balancing Services Volume Data (losses) in accordance with Annex S-2 section 7, and send to the Supplier(s) for the relevant (Primary) BM Unit(s);3
SVAA shall calculate Supplier BM Unit Non BM ABSVD, by summing MPAN Applicable Balancing Services Volume Data (non-losses) and MPAN Applicable Balancing Services Volume Data (losses) for each Supplier Primary BM Unit, and send to the SAA.
Process / Application System | Organisations | |
(i) | Temperature / Sunset data | Temperature Provider / Sunset Provider |
(ii) | Regression equations | BSCCo |
(iii) | Teleswitch messages | Teleswitch Agent |
(iv) | EAC/AA Calculation | Non-Half Hourly Data Collectors (NHHDCs) |
(v) | Non-Half Hourly Data Aggregation | NHHDAs |
(vi) | Supplier Meter Registration Services (SMRS) | SMRAs |
(vii) | HH Data Aggregation | HHDAs |
(ix) | GSP Group Take | CDCA |
(x) | Supplier Reconciliation (inc. DUoS) | Suppliers |
(xi) | TUoS Billing | the National Electricity Transmission System Operator (NETSO) - Ancillary Services Provider (ASP) NETSO- TUoS |
(xii) | DUoS Billing | LDSO |
(xiii) | MDD Management | MDDM |
(xiv) | Qualification information | Qualification Service Provider |
(xv) | Re-calculate EAC and AFYC values | NHHDCs, Suppliers. |
(xvi) | BSC Service Desk | SVAA |
(xvii) | BM Unit Data | CRA |
(xviii) | Supplier Take | SAA |
(xix) | Provision of Metering System Half Hourly Metered Volumes | HHDAs |
(xx) | Calculation of Secondary Half Hourly Delivered Volumes | SVAA |
(xxi) | Calculation of Secondary BM Unit Supplier Delivered Volumes | SVAA |
(xxii) | Calculation of Secondary Half Hourly Consumption Volumes | SVAA |
(xxiii) | Calculation of Secondary BM Unit Demand Volumes | SVAA |
BSCP01 | Overview of Trading Arrangements. |
BSCP11 | Trading Disputes |
BSCP128 | Production, Submission, Audit and Approval of Line Loss Factors |
BSCP501 | Supplier Meter Registration Service. |
BSCP502 | Half Hourly Data Collection for Metering Systems Registered in SMRS. |
BSCP503 | Half Hourly Data Aggregation for Metering Systems Registered in SMRS. |
BSCP504 | Non-Half Hourly Data Collection for SVA Metering Systems Registered in SMRS. |
BSCP505 | Non-Half Hourly Data Aggregation for Metering Systems Registered in SMRS. |
BSCP507 | Supplier Volume Allocation Standing Data Changes. |
BSCP509 | Changes to Market Domain Data. |
BSCP515 | Licensed Distribution |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs. |
BSCP602 | SVA Metering System Register |
AA(s) | Annualised Advance(s) |
AFYC | Average Fraction of Yearly Consumption |
ASP | Ancillary Services Provider |
BM | Balancing Mechanism |
BSC | Balancing and Settlement Code |
BSCCo | Balancing and Settlement Code Company |
BSCP | Balancing and Settlement Code Procedure |
CDCA | Central Data Collection Agent |
CR | Change Request |
CRA | Central Registration Agent |
DA(s) | Data Aggregator(s) |
DC(s) | Data Collector(s) |
DPP | Daily Profile Production |
DUoS | Distribution Use of System |
EAC(s) | Estimated Annual Consumption(s) |
FAA | Funds Administration Agent |
GSP | Grid Supply Point |
HH | Half Hourly |
HHDA(s) | Half Hourly Data Aggregator(s) |
HHDC(s) | Half Hourly Data Collector(s) |
IARA | Initial Allocation and Reconciliation Agent |
Id | Identifier |
kWh | kilowatt-hour |
LDSO | Licensed Distribution System Operator |
LLF | Line Loss Factor |
LLFC(s) | Line Loss Factor Class(es) |
LRM | Loss Reconciliation Multiplier |
LRM | Transmission Loss Reconciliation Multiplier |
MDD | Market Domain Data |
MDDM | Market Domain Data Manager |
SVA MOA | SVA Meter Operator Agent |
MSID | Metering System Identifier |
MWh | Megawatt Hour |
NETSO | National Electricity Transmission System Operator as the holder of the Transmission Licence and any reference to "NETSO", "NGESO", "National Grid Company" or "NGC" in the Code or any Subsidiary Document shall have the same meaning |
NHH | Non-Half Hourly |
NHHDA(s) | Non-Half Hourly Data Aggregator(s) |
NHHDC(s) | Non-Half Hourly Data Collector(s) |
Ref | Reference |
SD(s) | Settlement Day(s) |
SMRA | Supplier Meter Registration Agent |
SMRS | Supplier Meter Registration Service |
SPM | Supplier Purchase Matrix |
SSC | Standard Settlement Configuration |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
TPD | Technical Product Deliverables |
TUoS | Transmission Use of System |
VAR | Volume Allocation Run |
WD | Working Day |
Host LDSO | An LDSO operating a distribution network that is directly connected to the Transmission System in their own distribution licence area. |
Virtual Lead Party | Has the meaning given in Annex X-1 of the BSC |
Secondary BM Unit | Has the meaning given in Annex X-1 of the BSC |
MSID Pair | Has the meaning given in Annex X-1 of the BSC |
MSID Pair Delivered Volume | Has the meaning given in Annex X-1 of the BSC |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | By 10:00am on SD+1. | Send daily temperature parameters for GSP Group(s). | Temperature Provider. | SVAA. | P0033 Temperature Data. | Electronic or other method as agreed. |
3.1.2 | By 10:00am on SD+1. | Send a set of Sunset times.4 | Sunset Provider. | SVAA. | P0011 Sunset Data File. | Electronic or other method as agreed. |
3.1.3 | By 10:00am on SD+1. | Send Teleswitch Contact Interval data. | Teleswitch Agent. | SVAA. | D0277 Teleswitch Contact Interval Data File. | Electronic. |
3.1.4 | From 10:00am on SD+1. | If data missing notify appropriate source and await submission of data. | SVAA. | Temperature Provider, Sunset Provider, Teleswitch Agent. | P0034 Missing Data. | Manual Process. |
3.1.5 | To be received by 12:00 noon on SD+1. | Send data to SVAA. | Temperature Provider. | SVAA. | Refer to the dataflow listed in 3.1.1 | Electronic or other method as agreed. |
|
|
| Sunset Provider. |
| Refer to the dataflow listed in 3.1.2. |
|
|
|
| Teleswitch Agent. |
| Refer to the dataflow listed in 3.1.3. |
|
3.1.6 | By 1:00pm on SD+1. | If data not received, default data. Send notification that default data being used in the DPP Run. | SVAA. SVAA. |
Suppliers, NHHDCs, Panel. | P0036 Default Data. | Internal Process. Electronic or other method as agreed. |
3.1.7 | By 5:00pm on SD+1. | Store parameter data, record time patterns and enter profile data. | SVAA. |
| Parameter Data : 1. Enter GSP Group details and Calendar details. 2. Calculate Noon Effective Temperature. 3. Enter Time of Sunset3. 4. Enter DC Details. Time Patterns : 1. Enter Settlement Configurations. 2. Enter Time Patterns. 3. Assign Time Patterns to Configurations. 4. Assign Configurations to Profile Classes. 5. Enter Clock Intervals. 6. Enter Teleswitch Contact Interval data. 7. Load MDD (retrieve latest version from MDD database). 8. Specify AFYC. Enter Profiles : 1. Enter profile details. 2. Enter Regression Equations. | Internal Process. |
3.1.8 | Within 2 working hours of receipt. | Validate data. | SVAA. |
|
| Internal Process. |
3.1.9 | By 5:00pm on SD+1. | If data validation fails, send notification that data is invalid. Use reasonable endeavours to resolve problems with the provider of the data. Return to 3.1.8 once data received. Inform BSC Service Desk that data submitted has failed validation. | SVAA.
SVAA. | Temperature Provider, Sunset Provider, Teleswitch Agent, BSCCo5. BSC Service Desk. | P0035 Invalid Data. | Manual Process. |
3.1.10 | By 5:00pm on SD+1. | Perform the DPP Run6. A valid DPP Run must be selected which covers all GSP Groups in the DPP Run, otherwise the DPP Run cannot be invoked. | SVAA. |
| 1. Determine Time Pattern State. 2. Evaluate Regression Equations. 3. Combine Base and Switched Load Profiles. 4. Chunk Profiles. | Internal Process. |
3.1.11 | By 5:00pm on SD+1. | Send the relevant DPP Reports to the Suppliers and NHHDCs. | SVAA.
SVAA. | Suppliers7.
NHHDCs. | P0043 Default Data Teleswitch Report. D0018 Daily Profile Data Report. D0029 Standard Settlement Configuration Report. D0279 Teleswitch Contact Interval Data Report File. D0029 Standard Settlement Configuration Report. D0039 Daily Profile Coefficient File. | Electronic or other method as agreed. |
3.1.12 | Monthly and if requested by Panel. | Produce and send the Default Data Teleswitch Report. | SVAA. | Panel. | P0043 Default Data Teleswitch Report. | Electronic or other method as agreed. |
3.1.13 | If required | Request Standing Profile Data Report | Supplier / NHHDC | SVAA |
| Manual Process. |
3.1.14 | Within 3 WD of 3.1.13 | Send Standing Profile Data Report | SVAA | Supplier / NHHDC | D0028 Standing Profile Data Report | Manual Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2A.1 | On SD+3. | Send aggregated HH meter data, in clocktime, in MWh, for MSIDs to which DA is appointed in SMRS. | HHDA. | SVAA. | D0040 Aggregated Half Hour Data File (BM Unit(s) not supported) or D0298 BM Unit Aggregated Half Hour Data File (BM Unit(s) supported). | Electronic or other method as agreed. |
Send Allocated Metering System Metered Consumption (i.e. non- aggregated HH meter data), in clocktime, in kwh, for Metering System Numbers specified by the SVAA. |
|
| D0385 Metering System Half Hourly Metered Volumes |
| ||
3.2A.2 | On SD+3. | Send SPM data (EACs/AAs values) in MWh, for MSIDs to which DA is appointed in SMRS. | NHHDA. | SVAA. | D0041 Supplier Purchase Matrix Data File. | Electronic or other method as agreed. |
3.2A.3 | Before invoking run. | Load and validate incoming DA files. Check that DA files expected have been received: | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
| At least 4 working hours before deadline of end of SD+3. | a) If file expected but not received, ask DA to send file. | SVAA. | HHDA, NHHDA | P0034 Missing Data. | Electronic or other method as agreed. |
| On SD+3. | Send file to SVAA. | HHDA. NHHDA. | SVAA. | Refer to the dataflow listed in 3.2A.1. Refer to the dataflow listed in 3.2A.2. | Electronic or other method as agreed. |
|
| b) If file fails any validation check for reasons other than standing data mismatch8, ask DA to assess if file is valid. | SVAA. | HHDA, NHHDA. | P0035 Invalid Data. | Electronic or other method as agreed. |
| Within 2 working hours of notification received from SVAA. | If file is valid, notify the SVAA or send corrected file to SVAA. | HHDA. NHHDA | SVAA. | Refer to the dataflow listed in 3.2A.1. | Electronic or other method as agreed. |
|
| Re-load and validate DA files. | SVAA. |
| Refer to the dataflow listed in 3.2A.2. | Internal Process. |
| On receipt of a corrected file up until the VAR is invoked. | Re-load and validate DA files. | SVAA. |
| Refer to the dataflow listed in 3.2A.2. | Internal Process. |
3.2A.4 | On SD+3. | Send GSP Group Take data. | CDCA. | SVAA. | P0012 GSP Group Take Data File. | Electronic or other method as agreed. |
3.2A.5 | Following 3.2A.4. | Send acknowledgement confirming receipt of the GSP Group Take data. | SVAA. | CDCA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.2A.6 | Immediately following CDCA deadline. | Load and validate incoming CDCA data. | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
|
| a) If CDCA data missing, notify CDCA and await submission of data. | SVAA. | CDCA. | P0034 Missing Data. | Manual Process. |
| Within 1 working hour of receipt of notification from SVAA. | Send CDCA data to SVAA. | CDCA. | SVAA. | Refer to the dataflow listed in 3.2A.4. | Electronic or other method as agreed. |
|
| b) If CDCA data invalid, contact the Panel and carry out action as agreed with Panel. | SVAA. | Panel. |
| Manual Process. |
3.2A.7 | From 9:00 am on SD+4. | Invoke Interim Information Volume Allocation Run9: Review the DA files and check that the expected files have been received: | SVAA. |
| Appendix 4.1 - Validate Incoming Data. | Internal Process. |
|
| a) If file does not match expected details modify the standing data for this Settlement Day only and where appropriate re-load and validate data. | SVAA. |
|
| Internal Process. |
|
| Inform BSC Service Desk. | SVAA. | BSC Service Desk. |
| Electronic or other method as agreed. |
|
| BSC Service Desk logs call. | BSC Service Desk10. |
|
| Internal Process. |
|
| b) If file not received as expected use default data. | SVAA. |
|
| Internal Process. |
|
| Retrieve all input data for use in Interim Information Volume Allocation Run. | SVAA. |
|
| Internal Process. |
3.2A.8 | If data defaulted for use in run, by SD+4. | Send relevant notification to each of the parties listed that default data to be used in Interim Information Volume Allocation Run. | SVAA. | Suppliers. | P0036 Default Data (relating to DA defaults only). | Manual Process. |
|
|
|
| LDSO | P0036 Default Data (relating to LLF defaults only). |
|
|
|
|
| Panel. | P0036 Default Data (relating to all defaults excluding Base BM Unit data). |
|
3.2A.9 | After 3.2A.7. | Calculate the Supplier Deemed Take and GSP Group Correction Factor. | SVAA. |
| Base BM Unit Allocation: Allocate Base BM Unit per Supplier if no BM Unit nominated by Supplier or if invalid BM Unit received. Profile and Line Loss Adjust SPM: 1. Allocate NHH BMU(s) for nominated Supplier(s). 2. Profile SPM data. 3. Aggregate Profiled data. 4. Adjust for Line Losses. Supplier Deemed Take Calculate GSP Group Correction Factor and GSP Group uncorrected consumption.
| Internal Process. |
3.2A.10 | After 3.2A.9 | Validate that the GSP Group Correction Factor is within pre-determined tolerances. If GSP Group Correction Factor is not within tolerance, abort Interim Information Volume Allocation Run and investigate source of error. If resolved, return to 3.2A.7. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
3.2A.11 | After 3.2A.10 | Validate difference between GSP Group uncorrected consumption and GSP Group Take values. If any value is not within tolerances abort and investigate source of error, otherwise proceed with Volume Allocation Run. If resolved, return to 3.2A.7. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
| If error unresolved following 3,2A.10 or 3.2A.11 | Inform BSCCo and return to 3.2.A.7 and override to continue the Volume Allocation Run. | SVAA. | BSCCo | Details of values outside tolerance and appropriate data to for BSCCo analysis. | Electronic or other method as agreed. |
| If process triggered by SVAA | Undertake analysis of data and resolve issues where possible by Initial Volume Allocation Run | BSCCo |
|
| Internal Process |
3.2A.12 | After 3.2A.11 | Calculate the Supplier Deemed Take11. | SVAA. |
| Supplier Deemed Take: 1. Apply GSP Group Correction Factor. 2. Calculate Supplier Deemed Take by BM Unit. 3. Produce the NETSO reports by Supplier. 4. Produce DUoS Report by Supplier and LDSO. 5. Produce BM Unit Supplier Take Energy Volume Data File. | Internal Process. |
3.2A.13 | To arrive by 9:00am on SD+5. | Send BM Unit Supplier Take Energy Volume Data File. | SVAA. | SAA. | P0182 BM Unit Supplier Take Energy Volume Data File. P0236 BM Unit SVA Gross Demand Data File | Electronic or other method as agreed. |
3.2A.14 | After 3.2A.13. | Send acknowledgement confirming receipt of the BM Unit Supplier Take Energy Volume Data File. | SAA. | SVAA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.2A.15 | After 3.2A.14 and if problem with file. | Send notification that problem with file. | SAA | SVAA. | P0187 SAA Data Exception Report. | Manual Process. |
3.2A.16 | By SD+5 | Send Interim Information Volume Allocation Run Reports to relevant Suppliers. | SVAA | Suppliers | D0296 Supplier BM Unit Report | Electronic or other method as agreed. |
3.2A.17 | To arrive before 12:30 on SD+5. | Send relevant NETSO reports. | SVAA. | NETSO. | P0210 TUoS Report (HH/NHH Split). | Electronic or other method as agreed. |
3.2A.18 | After 3.2A.12 | Calculate the Secondary Half Hourly Delivered Volumes where applicable12. | SVAA |
| Calculate Metering System Delivered Volume Calculate Secondary Half Hourly Delivered Volume (Losses) Calculate Secondary Half Hourly Delivered Volume (Non-Losses) | Internal process |
3.2A.19 | After 3.2A.12 | Calculate the Secondary Half Hourly Consumption Volumes where applicable. | SVAA |
| Calculate Metering System Metered Consumption Calculate Secondary Half Hourly Consumption Volume (Losses) Calculate Secondary Half Hourly Consumption Volume (Non-Losses) | Internal process |
3.2A.20 | After 3.2A.18 | Send the Secondary Half Hourly Delivered Volume (No Losses) and the Secondary Half Hourly Delivered Volume (Losses) to the Supplier(s) responsible for the Metering System Number(s)13 | SVAA | Supplier | P0287 - Secondary Half Hourly Delivered Volumes | Electronic or other method as agreed. |
3.2A.21 | After 3.2A.19 | Send the Secondary Half Hourly Consumption Volume (Non Losses) and the Secondary Half Hourly Consumption Volume (Losses) to the VLP(s) responsible for the Metering System Number(s) | SVAA | VLP | P0288 - Secondary Half Hourly Consumption Volumes | Electronic or other method as agreed. |
3.2A.22 | After 3.2A.18 | Calculate the Secondary BM Unit Supplier Delivered Volumes where applicable14. | SVAA |
|
| Internal Process |
3.2A.23 | After 3.2A.19 | Calculate the Secondary BM Unit Demand Volumes. | SVAA |
|
| Internal Process |
3.2A.24 | After 3.2A.22 | Send the Secondary BM Unit Supplier Delivered Volumes to the SAA | SVAA | SAA | P0289 - Secondary BM Unit Supplier Delivered Volumes | Electronic or other method as agreed. |
3.2A.25 | After 3.2A.23 | Send the Secondary BM Unit Demand Volumes to the SAA | SVAA | SAA | P0290 - Secondary BM Unit Demand Volumes | Electronic or other method as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2B.1 | By SD+14. | Send aggregated HH meter data, in clocktime, in MWh, for MSIDs to which DA is appointed in SMRS. | HHDA. | SVAA. | D0040 Aggregated Half Hour Data File (BM Unit(s) not supported) or D0298 BM Unit Aggregated Half Hour Data File (BM Unit(s) supported). | Electronic or other method as agreed. |
|
| Send non aggregated HH meter data, in clocktime, in kWh, for Metering System Numbers specified by the SVAA. |
|
| D0385 Metering System Half Hourly Metered Volumes |
|
3.2B.2 | By SD+14. | Send SPM data (EACs/AAs values) in MWh, for MSIDs to which DA is appointed in SMRS. | NHHDA. | SVAA. | D0041 Supplier Purchase Matrix Data File. | Electronic or other method as agreed. |
3.2B.3 | Before invoking run. | Load and validate incoming DA files. Check that DA files expected have been received. | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
| At least 4 working hours before deadline of SD+14. | a) If file expected but not received, ask DA to send file. | SVAA. | HHDA, NHHDA | P0034 Missing Data. | Electronic or other method as agreed. |
| By SD+14. | Send file to SVAA. | HHDA. NHHDA. | SVAA. | Refer to the dataflow listed in 3.2B.1. Refer to the dataflow listed in 3.2B.2. | Electronic or other method as agreed. |
|
| b) If file fails any validation check invalid for reason other than standing data mismatch8, ask DA to assess if is valid. | SVAA. | HHDA, NHHDA. | P0035 Invalid Data. | Electronic or other method as agreed. |
| Within 2 working hours of notification received from SVAA. | If file is valid notify the SVAA or send correct file to SVAA. | HHDA. NHHDA. | SVAA. | Refer to the dataflow listed in 3.2B.1. Refer to the dataflow listed in 3.2B.2. | Electronic or other method as agreed. |
| On receipt of corrected file until VAR is invoked. | Re-load and validate DA files. | SVAA. |
| Refer to the dataflow listed in 3.2B.1. Refer to the dataflow listed in 3.2B.2. | Internal Process. |
|
| Re-load and validate DA files. | SVAA. |
|
| Internal Process. |
3.2B.4 | By SD+14. | Send GSP Group Take data. | CDCA. | SVAA. | P0012 GSP Group Take Data File. | Electronic or other method as agreed. |
3.2B.5 | Following 3.2B.6. | Send acknowledgement confirming receipt of the GSP Group Take data. | SVAA. | CDCA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.2B.6 | Immediately following CDCA deadline. | Load and validate incoming CDCA data. | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
|
| a) If CDCA data missing, notify CDCA and await submission of data. | SVAA. | CDCA. | P003 Missing Data. | Manual Process. |
| Within 1 working hour of receipt of notification from SVAA. | Send CDCA data to SVAA. | CDCA. | SVAA. | Refer to the dataflow listed in 3.2B.6. | Electronic or other method as agreed. |
|
| b) If CDCA data invalid, contact the Panel and carry out action as agreed with Panel. | SVAA. | Panel. |
| Manual Process. |
3.2B.7 | By SD+1415 | Send ABS MSID Pair Delivered Volume Notifications in MWh. | NETSO | SVAA | P0292 ABS MSID Pair Delivered Volume Notifications | Electronic or other method as agreed. |
3.2B.8 | Immediately following 3.2B.7 or 3.2B.9 | Validate ABS MSID Pair Delivered Volume Notification:
| SVAA |
|
| Internal Process |
|
| If valid, Confirmation of ABS MSID Pair Delivered Volume. | SVAA | NETSO | P294 Confirmation of ABS MSID Pair Delivered Volume | Electronic or other method as agreed. |
|
| If invalid, send Rejection of ABS MSID Pair Delivered Volume. Note that the entire file will be rejected if one ABS MSID Pair Delivered Volume fails validation. | SVAA | NETSO | P293 Rejection of ABS MSID Pair Delivered Volume | Electronic or other method as agreed. |
|
| And send a ABS MSID Pair Delivered Volume Exception Report for each ABS MSID Pair Delivered Volume that failed validation | SVAA | NETSO | P295 ABS MSID Pair Delivered Volume Exception Report | Electronic or other method as agreed. |
3.2B.9 | Within 1 WD of 3.2B.8 | Submit corrected ABS MSID Pair Delivered Volume Notification |
|
|
|
|
3.2B.10 | From 9:00 am on SD+15. | Invoke run16: Review the DA files and check that the expected files have been received: | SVAA. |
| Appendix 4.1 - Validate Incoming Data. | Internal Process. |
|
| a) If file does not match expected details modify the standing data for this Settlement Day only and where appropriate re-load and validate data. | SVAA. |
|
| Internal Process. |
|
| Inform BSC Service Desk. | SVAA. | BSC Service Desk. |
| Electronic or other method as agreed. |
|
| BSC Service Desk logs call. | BSC Service Desk10. |
|
| Internal Process. |
|
| b) If file not received as expected, default data. | SVAA. |
|
| Internal Process. |
|
| Retrieve all input data for use in Initial Volume Allocation Run. | SVAA. |
|
| Internal Process. |
3.2B.11 | If data defaulted for use in run, by SD+15. | Send relevant notification to each of the parties listed that default data to be used in Initial Volume Allocation Run. | SVAA. | Suppliers. | P0036 Default Data (relating to DA defaults only). | Manual Process. |
|
|
|
| LDSO | P0036 Default Data (relating to LLF defaults only). |
|
|
|
|
| Panel. | P0036 Default Data (relating to all defaults excluding Base BM Unit data). |
|
3.2B.12 | After 3.2B.10. | Calculate the Supplier Deemed Take11 and GSP Group Correction Factor. | SVAA. |
| Base BM Unit Allocation: Allocate Base BM Unit per Supplier if no BM Unit nominated by Supplier or if invalid BM Unit received. | Internal Process. |
|
|
|
|
| Profile and Line Loss Adjust SPM: 1. Allocate NHH BMU(s) for nominated Supplier(s). 2. Profile SPM data. 3. Aggregate Profiled data. 4. Adjust for Line Losses. Calculate GSP Group Correction Factor and GSP Group uncorrected consumption. |
|
3.2B.13 | After 3.2B.12 | Validate that the GSP Group Correction Factor is within pre-determined tolerances. If GSP Group Correction Factor is not within tolerance, abort Initial Volume Allocation Run and investigate source of error. If resolved, return to 3.2B.7. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
3.2B.14 | After 3.2B.13 | Validate difference between GSP Group uncorrected consumption and GSP Group Take values If any value is not within tolerances, abort and investigate source of error, otherwise proceed with Volume Allocation Run. If resolved, return to 3.2B.7. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
| If error unresolved following 3.2.B.11 or 3.2B.12 | Inform BSCCo and return to 3.2.B.7 and override to continue the Volume Allocation Run.. | SVAA. | BSCCo | Details of values outside tolerance and appropriate data to for BSCCo analysis. | Electronic or other method as agreed. |
| If process triggered by SVAA | Undertake analysis of data and resolve issues where possible by next Reconciliation Run | BSCCo |
|
| Internal Process |
3.2B.15 | After 3.2B.14 | Calculate the Supplier Deemed Take11. |
|
| Supplier Deemed Take: 1. Apply GSP Group Correction Factor. 2. Calculate Supplier Deemed Take by BM Unit. 3. Produce the NETSO reports by Supplier. 4. Produce DUoS Report by Supplier and LDSO. 5. Produce BM Unit Supplier Take Energy Volume Data File. |
|
3.2B.16 | To arrive by 9:00am on SD+16. | Send BM Unit Supplier Take Energy Volume Data File. | SVAA. | SAA. | P0182 BM Unit Supplier Take Energy Volume Data File. P0236 BM Unit SVA Gross Demand Data File | Electronic or other method as agreed. |
3.2B.17 | After 3.2B.16. | Send acknowledgement confirming receipt of the BM Unit Supplier Take Energy Volume Data File. | SAA. | SVAA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.2B.18 | After 3.2B.14 and if problem with file. | Send notification that problem with file. | SAA | SVAA. | P0187 SAA Data Exception Report. | Manual Process. |
3.2B.19 | To arrive before 12:30 on SD+16. | Send relevant NETSO reports. | SVAA. | NETSO. | P0210 TUoS Report (HH/NHH Split). | Electronic or other method as agreed. |
3.2B.20 | After 3.2B.16 | Calculate the Supplier BM Unit Non BM ABSVD where applicable. | SVAA |
| Calculate MPAN Applicable Balancing Services Volume Data (non-losses) Calculate MPAN Applicable Balancing Services Volume Data (non-losses) Calculate the Supplier BM Unit Non BM ABSVD | Internal process |
3.2B.21 | After 3.2B.20 | Send the Supplier BM Unit Non BM ABSVD to the SAA. | SVAA | SAA | P2096 Supplier BM Unit Non BM ABSVD | Electronic or other method as agreed. |
3.2B.22 | By SD+17. | Send remaining Initial Volume Allocation Run Reports to the LDSO, Suppliers and BSCCo. | SVAA. | LDSO. | Electronic or other method as agreed. | |
|
|
| SVAA. | Host LDSO | D0314 Non Half Hourly Embedded Network DUoS Report.18 |
|
|
|
| SVAA. | Suppliers. | D0030 Aggregated DUoS Report’.18 D0043 Supplier Deemed Take Report. D0079 Supplier Purchase Report. D0081 Supplier Half Hourly Demand Report. D0082 Supplier – Supplier Purchase Matrix Report. D0266 Supplier Settlement Header Report. D0276 GSP Group Consumption Totals Report. D0296 Supplier BM Unit Report.19. |
|
|
|
| SVAA. | BSCCo. | P0276 BSCCo GSP Group Consumption Totals Report.20 P0277 GSP Group Market Matrix Report. |
|
3.2B.21 | Following 3.2B.20 | Publish BSCCo GSP Group Consumption Totals Report and GSP Group Market Matrix Report | BSCCo |
| P0276 BSCCo GSP Group Consumption Totals Report. P0277 GSP Group Market Matrix Report. | BSC Website. |
3.2B.22 | After 3.2B.14 | As for 3.2A.17 - 3.2A.20 |
|
|
|
|
REF | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD | |
3.3.1 | By T-6 WD. | Send revised aggregated HH meter data in clocktime, in MWh for MSIDs to which DA is appointed in SMRS. | HHDA. | SVAA. | D0040 Aggregated Half Hour Data File (BM Unit(s) not supported) or D0298 BM Unit Aggregated Half Hour Data File (BM Unit(s) supported). | Electronic or other method as agreed. |
3.3.2 | By T-6 WD. | Send SPM data (EACs/AAs values) in MWh, for MSIDs to which DA is appointed in SMRS. | NHHDA | SVAA. | D0041 Supplier Purchase Matrix Data File. | Electronic or other method as agreed. |
3.3.3 | Before invoking run. | Load and validate incoming DA files. Check that DA files expected have been received : | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
| At least 4 working hours before T-6 WD. | a) If file expected but not received, ask DA to send file. | SVAA. | HHDA, NHHDA. | P0034 Missing Data. | Electronic or other method as agreed. |
| By T-6 WD. | Send file to SVAA. | HHDA. NHHDA. | SVAA. | Refer to the dataflow listed in 3.3.1. Refer to the dataflow listed in 3.3.2. | Electronic or other method as agreed. |
|
| b) If file fails any validation check invalid for reasons other than standing data mismatch8, ask DA to assess file is valid. | SVAA. | HHDA, NHHDA. | P0035 Invalid Data. | Electronic or other method as agreed. |
| Within 2 working hours of notification received from SVAA. | If file is valid notify the SVAA or send corrected file to SVAA. | HHDA. NHHDA. | SVAA. | Refer to the dataflow listed in 3.3.1. Refer to the dataflow listed in 3.3.2. | Electronic or other method as agreed. |
| On receipt of corrected file up until the VAR is invoked. | Re-load and validate DA files. | SVAA. |
| Refer to the dataflow listed in 3.3.1. Refer to the dataflow listed in 3.3.2. | Electronic or other method as agreed. |
|
| Re-load and validate DA files. | SVAA. |
|
| Internal Process. |
3.3.4 | By T-6 WD. | Send GSP Group Take data. | CDCA. | SVAA. | P0012 GSP Group Take Data File. | Electronic or other method as agreed. |
3.3.5 | Following 3.3.4. | Send acknowledgement confirming receipt of the GSP Group Take data. | SVAA. | CDCA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.3.6 | By T-5 WD. | Load and validate incoming CDCA data. If CDCA data missing or invalid then default data. | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
3.3.7 | No later than the 45th calendar day after the relevant Settlement Day23 | Send ABS MSID Pair Delivered Volume Notifications in MWh. | NETSO | SVAA | P0292 ABS MSID Pair Delivered Volume Notifications | Electronic or other method as agreed. |
3.3.8 | By T-5 WD. | Invoke run24: Review the DA files and check that the expected files have been received : | SVAA. |
| Appendix 4.1 – Validate Incoming Data. | Internal Process. |
|
| a) If file does not match expected details modify the standing data for this Settlement Day only and where appropriate, re-load and validate data. | SVAA. |
|
| Internal Process. |
|
| Inform BSC Service Desk. | SVAA. | BSC Service Desk. |
| Electronic or other method as agreed. |
|
| BSC Service Desk logs call. | BSC Service Desk10. |
|
| Internal Process. |
|
| b) If file not received as expected, default data. | SVAA. |
|
| Internal Process. |
|
| Retrieve all input data for use in Timetabled Reconciliation Volume Allocation Run. | SVAA. |
|
| Internal Process. |
3.3.9 | If data defaulted for use in run, by T-5 WD. | Send relevant notification to each of the parties listed that default data to be used in the Timetabled Reconciliation Volume Allocation Run. | SVAA25. | Suppliers. | P0036 Default Data (relating to DA defaults only). | Manual Process. |
|
|
|
| LDSO | P0036 Default Data (relating to LLF defaults only). |
|
|
|
|
| Panel. | P0036 Default Data (relating to all defaults excluding Base BM Unit data). |
|
3.3.10 | By T-5 WD. | Calculate the Supplier Deemed Take11. | SVAA. |
| Base BM Unit Allocation: Allocate Base BM Unit per Supplier if no BM Unit nominated by Supplier or if invalid BM Unit received. Profile and Line Loss Adjust SPM: 1. Allocate NHH BMU(s) for nominated Supplier(s). 2. Profile SPM data. 3. Aggregate Profiled data. 4. Adjust for Line Losses. Calculate GSP Group Correction Factor and GSP Group uncorrected consumption. Supplier Deemed Take : 1. Calculate and apply GSP Group Correction Factor. 2. Calculate Supplier Deemed Take, by BM Unit. 3. Produce the NETSO reports by Supplier. 4. Produce DUoS Report by Supplier and LDSO 5. Produce BM Unit Supplier Take Energy Volume Data File. | Internal Process. |
3.3.11 | After 3.3.10. | Validate that the GSP Group Correction Factor is within pre-determined tolerances. If GSP Group Correction Factor is not within tolerance, abort Reconciliation Volume Allocation Run and investigate source of error. If resolved, return to 3.3.8. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
3.3.12 | After 3.3.11. | Validate the difference between GSP Group uncorrected consumption and GSP Group Take. If any value is not within tolerances, abort and investigate source of error. Otherwise proceed with Volume Allocation Run. If resolved, return to 3.3.8. | SVAA. |
| Appendix 4.2 - Validate Volume Allocation Run Data. | Internal Process. |
| If error unresolved following 3.3.11 or 3.1.12 | Inform BSCCo and return to 3.3.8 and override to continue the Volume Allocation Run. | SVAA. | BSCCo | Details of values outside tolerance and appropriate data to for BSCCo analysis. | Electronic or other method as agreed. |
| If process triggered by SVAA | Undertake analysis of data and resolve issues where possible by next Reconciliation Run | BSCCo |
|
| Internal Process |
3.3.13 | After 3.3.12. | Calculate the Supplier Deemed Take11. |
|
| Supplier Deemed Take : 1. Apply GSP Group Correction Factor. 2. Calculate Supplier Deemed Take, by BM Unit. 3. Produce the NETSO reports by Supplier. 4. Produce DUoS Report by Supplier and LDSO 5. Produce BM Unit Supplier Take Energy Volume Data File. |
|
3.3.14 | For receipt by 09:00 hrs on T-4 WD. | Send BM Unit Supplier Take Energy Volume Data File. | SVAA. | SAA. | P0182 BM Unit Supplier Take Energy Volume Data File. P0236 BM Unit SVA Gross Demand Data File | Electronic or other method as agreed. |
3.3.15 | After 3.3.14. | Send acknowledgement confirming receipt of the BM Unit Supplier Take Energy Volume Data File. | SAA. | SVAA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.3.16 | After 3.3.15 and prior to 3.3.17 and if problem with file. | Send notification that problem with file. | SAA. | SVAA26. | P0187 SAA Data Exception Report. | Manual Process. |
3.3.17 | By 12:30 hrs on T-4 WD. | Send relevant NETSO reports. | SVAA. | NETSO. | P0210 TUoS Report (HH/NHH Split). | Electronic or other method as agreed. |
3.3.18 | By T-3 WD. | Send remaining Timetabled Reconciliation Volume Allocation Run Reports to the LDSO, Suppliers and BSCCo. | SVAA. | LDSO. | D0030 Non Half Hourly DUoS Report.17,18 | Electronic or other method as agreed. |
|
|
| SVAA. | Host LDSO | D0314 Non Half Hourly Embedded Network DUoS Report.18 |
|
|
|
|
| Suppliers. | D0030 Non Half Hourly DUoS Report.18 D0043 Supplier Deemed Take Report. D0079 Supplier Purchase Report. D0081 Supplier Half Hourly Demand Report. D0082 Supplier – Supplier Purchase Matrix Report. D0266 Supplier Settlement Header Report. D0276 GSP Group Consumption Totals Report. D0296 Supplier BM Unit Report19 |
|
|
|
| SVAA. | BSCCo. | P0276 BSCCo GSP Group Consumption Totals Report.20 P0277 GSP Group Market Matrix Report. |
|
3.3.19 | Following 3.3.18 | Publish BSCCo GSP Group Consumption Totals Report and GSP Group Market Matrix Report | BSCCo |
| P0276 BSCCo GSP Group Consumption Totals Report. P0277 GSP Group Market Matrix Report. | BSC Website. |
3.3.20 |
| As for 3.2A.17 -3.2A.20 |
|
|
|
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | At any time. | Request receipt of the latest Annual Profile Data Set. | BSC Party. Non-BSC party. | BSCCo. | Contact details of party. | Manual Process (via BSC Service Desk). |
For BSC Parties | ||||||
3.4.2 | Within 5 WD of 3.4.1. | Validate request and forward to the SVAA. | BSCCo. | SVAA. | Contact details of BSC Party. | Manual Process. |
3.4.3 | Upon receipt of request, or as soon as the data is available. | Send CD-ROM containing D0018 reports from the preceding year. | SVAA. | BSC Party. | Annual Profile Data Set. | Post. |
For non-BSC parties | ||||||
3.4.4 | Within 5 WD of 3.4.1. | Validate request and issue invoice to non-BSC party. | BSCCo. | Non-BSC party. | Contract and Invoice for provision of Annual Profile Data to non-BSC party. | Post. |
3.4.5 | Upon receipt of 3.4.4. | Sign appropriate documents and provide payment by cheque. | Non-BSC party. | BSCCo. | Contract signed by non-BSC party and cheque to the amount required by invoice. | Post. |
3.4.6 | Upon receipt of payment and signed contract. | Validate documentation and forward request to the SVAA. | BSCCo. | SVAA. | Contact details of non-BSC party. | Manual Process. |
3.4.7 | Upon receipt of request, or as soon as the data is available. | Send CD-ROM containing D0018 reports from the preceding year. | SVAA. | Non-BSC party. | Annual Profile Data Set. | Post. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | On demand when appointed to GSP Group. | Request Daily Profile Coefficients from SVAA, for the GSP Group(s). | NHHDC. | SVAA. | P0040 Request Daily Profile Coefficients. | Manual Process. |
3.6.2 | On receipt of request. | Send the relevant Daily Profile Coefficients to the NHHDC for the GSP Group(s). | SVAA. | NHHDC. | D0039 Daily Profile Coefficient File. | Electronic Interface. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.7.1 | Following approval of MDD change(s). | Send agreed MDD updates to MDDM. | BSCCo. | MDDM. | As per BSCP509. | Electronic or other method as agreed. |
3.7.2 | Following 3.7.1. | Liaise with BSCCo to establish when MDD will be published to MPs and agree relevant date(s) for use in MDD CMC. | MDDM. | BSCCo. |
| Electronic or other method as agreed. |
3.7.3 | Following 3.7.2. | Validate incoming MDD updates. | MDDM. |
|
| Internal Process. |
3.7.4 | If file not readable / complete. | Inform BSCCo and request re-transmission of correct MDD (return to 3.7.1). | MDDM. | BSCCo. | P0035Invalid Data. | Electronic or other method as agreed. |
3.7.5 | In accordance with timescales published in MDD CMC. | If file readable and complete update MDD database (in sequence order of version number) with updates received. | MDDM. |
|
| Internal Process. |
3.7.6 | Within 5 WD of implementing agreed MDD updates into database. | Confirm changes have been successfully incorporated into a revised MDD. | MDDM. | BSCCo. | As per BSCP509. | Fax / post. |
3.7.7 | In accordance with timescales published in MDD CMC. | a) Send Complete and Incremental MDD27.
b) Send Technical Product Deliverables (TPD) in accordance with the confidentiality agreement28.
c) Send remaining MDD dataflows. | MDDM.
MDDM.
MDDM. | Relevant MDD Recipients29.
SVAA, HHDC.
NHHDC30.
NHHDA31.
Non-BSC Parties32 | D0269 Market Domain Data Complete Set. D0270 Market Domain Data Incremental Set. D0269 Market Domain Data Complete Set. D0270 Market Domain Data Incremental Set. P0190 GSP Group Profile Class Tolerances30. D0227 BSCCo Market Domain Data File30 33. D0227 BSCCo Market Domain Data File33 D0286 Data Aggregation and Settlements Timetable File. P0223 GSP Group Profile Class Default EAC D0269 Market Domain Data Complete Set (excluding TPD). D0270 Market Domain Data Incremental Set (excluding TPD). | Electronic or other method as agreed.
Manual Process.
Electronic or other method as agreed.
|
3.7.7 (Cont/d.) |
|
| MDDM. | SVAA31. | P0015 Profile Data File. D0278 Teleswitch BSCCo Market Domain Data File. D0286 Data Aggregation and Settlements Timetable File.34 D0299 Stage 2 BM Unit Registration Data File. | Manual Process. Electronic or other method as agreed. |
|
|
|
| Supplier. | P0186 Half Hourly Default EAC. P0190 GSP Group Profile Class Tolerances30. D0280 Teleswitch Contact to Register Mapping File. D0299 Stage 2 BM Unit Registration Data File19. | Manual Process.
Electronic or other method as agreed. |
|
|
| MDDM. | IARA31. | P0015 Profile Data File. D0278 Teleswitch BSCCo Market Domain Data File. | Manual Process. Electronic or other method as agreed. |
|
|
|
| HHDA. | D0299 Stage 2 BM Unit Registration Data File35. | Electronic or other method as agreed. |
|
|
|
| HHDC. | P0186 Half Hourly Default EAC. | Manual Process. |
|
|
|
| HHDA. | P0186 Half Hourly Default EAC. | Manual Process. |
|
|
|
| LDSO. | P0186 Half Hourly Default EAC. | Manual Process. |
3.7.8 | Within 4 working hours of receipt of MDD. | Send acknowledgement confirming receipt of MDD. | MDD Recipients. | MDDM. | P0024 Acknowledgement. | Electronic or other method as agreed. |
3.7.9 | By 1 WD after 3.7.6. | If acknowledgement not received that MDD has been received, re-send MDD36. Return to 3.7.7. | MDDM. | MDD Recipients. | Refer to 3.7.7 – Information Required box. | Electronic. |
3.7.10 | When acknowledgement overdue and by 1 WD after 3.7.8. | Inform BSC Service Desk that confirmation has not been received from MDD Recipient, as expected, either from the original transmission or from the subsequent transmission of MDD. | MDDM. | BSC Service Desk. | P0037 Lack of MDD Receipt Confirmation. | Electronic or other method as agreed. |
3.7.11 | On receipt. | Validate incoming MDD updates. | MDD Recipients. |
| File level validation. | Internal Process. |
3.7.12 | If file not readable / complete. | Send notification that correctness of data in question. | MDD Recipients. | BSC Service Desk. | P0035 Invalid Data. | Electronic or other method as agreed. |
3.7.13 | On receipt of notification. | Contact MDDM and agree relevant course of action. | BSC Service Desk. | MDDM. |
| Internal Process. |
3.7.14 |
| Carry out action as agreed with BSC Service Desk and inform affected parties of action being taken. | MDDM. | MDD Recipients. |
| Electronic or other method as agreed. |
3.7.15 | If file readable / complete. | Update database with MDD. | MDD Recipients. |
|
| Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.8.1 | Within 1 WD of receipt of notification of change. | Send notification of change(s) relating to the receipt of MDD. | MDD Recipient. | BSC Service Desk. | P0184 MDD Matrix Changes. | Manual Process. |
3.8.2 | Within 1 WD of 3.8.1. | Log call and pass on to the MDDM. | BSC Service Desk. | MDDM. |
| Internal Process. |
3.8.3 | At least 1 WD before Go Live date. | Confirm intended change with MDD recipient. | MDDM. | MDD Recipient. |
| Manual Process. |
3.8.4 | In accordance with timescales published in MDD CMC. | Update MDD Distribution Matrix for the relevant MDD recipient as part of the MDD update. | MDDM. |
|
| Internal Process. |
3.8.5 | In accordance with timescales published in MDD CMC. | Send MDD flows in accordance with the revised MDD Distribution Matrix. | MDDM. | MDD Recipient | MDD data flows as required. The MDDM will the updated MDD Distribution Matrix prior to the distribution of the dataflows listed in Business Event 3.7 - Implementation of MDD Changes. | Manual Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.9.1 | Annually in February or at an alternative period specified by BSCCo. | Re-calculate for all GSP Groups on a Settlement Day basis for the previous 12 month37 period the AFYC, GSP Group Profile Class Average EAC and GSP Group Profile Class Default EAC values38, spanning the 12 month period. | SVAA. |
|
| Internal Process. |
3.9.2 | Within 2 WD of 3.9.1. | Send revised AFYC, GSP Group Profile Class Average EAC and GSP Group Profile Class Default EAC values for approval. Also send any exceptions generated. | SVAA. | BSCCo. | Proceed in accordance with BSCP509. | Electronic or other method as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.10.1 | Prior to effective date of BM Unit(s). | Send BM Unit(s) data (Base and / or Additional). | CRA. | MDDM. | P0181 BM Unit Registration Data File40. | Electronic or other method as agreed. |
3.10.2 | Within the same WD where possible otherwise by the close of the next WD. | Send acknowledgement confirming receipt of the BM Unit(s) data. | MDDM. | CRA.
CCC. | P0183 Stage 2 NETA Acknowledgement Message. P0024 Acknowledgement. Proceed to Business Event 3.7 – Implementation of MDD Changes. | Electronic or other method as agreed. |
3.10.3 | Within 1 WD of receipt of P0181 from CRA. | Send all BM Unit Registration Data files received from CRA since last MDD publish. | MDDM. | BSCCo. | P0181 BM Unit Registration Data File. | Email. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.11.1 | As Required. | Send schedule of LLFs. | BSCCo. | SVAA. | D0265 Line Loss Factor Data File. | E-mail. |
3.11.2 | Within a timescale agreed between SVAA and BSCCo. | Implement into systems and validate. | SVAA. |
|
| Internal Process (Appendix 4.1). |
3.11.3 | Within 1 WD of 3.11.2. | Notify BSCCo of successful D0265 load. | SVAA. | BSCCo. |
| E-mail. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.12.1 | As Required. | Request re-send of file(s) where positive acknowledgement received by SVAA for original send. | BSC Party / Party Agent. | BSC Service Desk. | Party/Party Agent contact details. Name(s) of file(s) requested. | Phone/E-mail. |
3.12.2 | Within 1 WD following 3.12.1, where number of files requested is not more than 3. | Refer call and authorise SVAA to re-send file(s). | BSCCo. | BSC Service Desk. | As 3.12.1. | E-mail. |
3.12.3 | Within 5 WD following 3.12.2. | Re-send file(s). | SVAA. | Requesting Party/Party Agent. | As 3.12.1. | Electronic or other method as agreed. |
3.12.4 | Within 1 WD following 3.12.2, where number of files requested is greater than 3. | Obtain further details and advise that BSCCo will seek to recover the cost to the SVAA of re-sending the files. | BSCCo. | Requesting BSC Party/Party Agent. | If not provided in 3.12.1, request:
| Phone/E-mail. |
3.12.5 | Immediately following 3.12.4. | Refer call, and request quote for re-send. | BSCCo. | SVAA. | As 3.12.4. | E-mail. |
3.12.6 | Within 1 WD following 3.12.5. | Request further details. | SVAA. | Requesting Party/Party Agent. | If not provided in 3.12.1 or 3.12.4, request:
| Fax/E-mail. |
3.12.7 | Following 3.12.6. | Return requested details. | Requesting Party /Party Agent. | SVAA. | Completed template in 3.12.6. | Fax/E-mail. |
3.12.8 | Within 3 WD following 3.12.7. | Provide quotation for re-send. | SVAA. | BSCCo. | Quotation for file re-send. | E-mail. |
3.12.9 | Within 1 WD following 3.12.8. | Advise quotation price and request agreement to meet cost. | BSCCo. | Requesting Party/Party Agent. | Quotation in 3.12.8. | E-mail. |
3.12.10 | Following 3.12.9. | Agree to meet quoted cost. | Requesting Party/Party Agent. | BSCCo. | Written confirmation of agreement to meet costs of re-send. | E-mail. |
3.12.11 | Within 1 WD, following receipt of confirmation in 3.12.10. | Advise SVAA of agreement and authorise SVAA to re-send files. | BSCCo. | SVAA. | Confirmation in 3.12.10. | E-mail. |
3.12.12 | Within 10 WD of 3.12.11. | Re-send files. | SVAA. | Requesting Party/Party Agent. | Details in 3.12.6. | Electronic or other method as agreed. |
3.12.13 | Following 3.12.12. | Advise of re-send. | SVAA. | BSCCo. |
| Phone/Fax/E-mail. |
3.12.14 | Following 3.12.13. | Invoice for cost of re-send. | BSCCo. | Requesting Party/Party Agent. | Quotation in 3.12.8. | Post. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.13.1 | Within the period of 1WD commencing on the Business Day after the BMRA receives the data from the NETSO specified in Section Q6.9.5 | BSCCo will assess the costs and value of the DCE in accordance with the Demand Event Threshold Rules and notify BSC Parties, Party Agents and BSC Panel Members of the outcome of its assessment | BSCCo | BSC Parties, Party Agents and BSC Panel | Notice of the outcome of BSCCo’s assessment | Email, Circular, BSC Website |
3.13.2 | Within 5WD of 3.13.1 | Send notification of Demand Disconnection Event and all affected MSIDs | LDSO | BSCCo | P0238 MSIDs affected by Demand Control Event | Email to bscservicedesk@cgi.com |
3.13.3 | Within 1WD of 3.13.2 | Acting on behalf of LDSOs, BSCCo will forward notifications received from LDSOs to HHDCs, HHDAs, NHHDCs, NHHDAs. SVAA | BSCCo | HHDC, HHDA, NHHDC, NHHDA, SVAA | P0238 MSIDs affected by Demand Control Event | BSCCo will maintain details of Party Agent contact details to ensure it is able to send P0238 |
3.13.4 | Within 1WD of 3.13.3 | Send daily profile data for all Settlement Dates with one or more Demand Control Impacted Settlement Periods | SVAA | NHHDC | D0018 Daily Profile Data Report | Electronic or other method as agreed |
3.13.5 | Within 25WD of 3.13.1 | Send notification of any MSIDs subject to demand side Non-BM STOR instruction along with estimated volumes of reduction | NETSO | SVAA | P0241 Disconnected MSIDs and Estimated Half Hourly Demand Disconnection Volumes | Electronic or other method as agreed |
3.13.6 | Within 1WD of 3.13.5 | Forward notification of Non-BM STOR MSIDs and estimated volumes of reduction | SVAA | NHHDC, NHHDA, HHDC, HHDA | D0375 Disconnected MSIDs and Estimated Half Hourly Demand Disconnection Volumes | Electronic or other method as agreed |
3.13.7 | By T-6WD | Send revised aggregated HH meter data in clocktime, in MWh for MSIDs to which DA is appointed in SMRS. | HHDA | SVAA, | D0040 Aggregated Half Hour Data File (BM Unit(s) not supported) or D0298 BM Unit Aggregated Half Hour Data File (BM Unit(s) supported). | Electronic or other method as agreed |
|
| Send aggregated estimated HH Disconnection Volumes |
|
| D0376 Supplier’s Demand Disconnection Volume Data File |
|
3.13.8 | By T-6WD | Send revised aggregated HH meter data in clocktime, in MWh for MSIDs to which DA is appointed in SMRS. | HHDA. | SVAA. | D0040 Aggregated Half Hour Data File (BM Unit(s) not supported) or D0298 BM Unit Aggregated Half Hour Data File (BM Unit(s) supported). | Electronic or other method as agreed. |
3.13.9 | By T-6WD | Send Disconnection Purchase Data Matrix File | NHHDA | SVAA. | D0377 Disconnection Purchase Matrix Data File | Electronic or other method as agreed |
|
| Send Supplier Purchase Matrix File, adjusted for disconnection |
|
| D0041 Supplier Purchase Matrix Data File |
|
3.13.10 | Following 3.13.9 | Process HHDA and NHHDA data and invoke run in accordance with Section 3.3, steps 3.3.3-3.3.9 |
|
|
|
|
3.13.11 | Following 3.13.10 and For receipt by 09:00hrs on T-4 WD. | Send BM Unit Supplier Take Energy Volume Data Files. | SVAA. | SAA. | P0182 BM Unit Supplier Take Energy Volume Data File. P0237 BM Unit Disconnected Supplier Take Energy Volume Data File. P0236 BM Unit SVA Gross Demand Data File. | Electronic or other method as agreed. |
3.13.12 | After 3.13.11 | Send acknowledgement confirming receipt of the BM Unit Supplier Take Energy Volume Data File. | SAA. | SVAA. | P0183 Stage 2 NETA Acknowledgement Message. | Electronic or other method as agreed. |
3.13.13 | After 3.13.11 | Send notification that problem with file. | SAA. | SVAA27. | P0187 SAA Data Exception Report. | Manual Process. |
3.13.14 | By 12:30hrs on T-4 WD. | Send relevant NETSO reports. | SVAA. | NETSO. | P0210 TUoS Report (HH/NHH Split). |
|
3.13.15 | By T-3 WD. | Send remaining Timetabled Reconciliation Volume Allocation Run Reports to the LDSO and Suppliers. | SVAA. | LDSO. | D0030 Non Half Hourly DUoS Report.17 D0369 Aggregated Disconnected DUoS Report | Electronic or other method as agreed. |
|
|
| SVAA. | Host LDSO | D0314 Non Half Hourly Embedded Network DUoS Report D0372 Aggregated Embedded Network Disconnected DUoS Report |
|
|
|
|
| Suppliers. | D0030 Non Half Hourly DUoS Report. D0369 Aggregated Disconnected DUoS Report D0043 Supplier Deemed Take Report. D0079 Supplier Purchase Report. D0081 Supplier Half Hourly Demand Report. D0082 Supplier – Supplier Purchase Matrix Report. D0371 Supplier – Supplier Disconnection Matrix Report D0266 Supplier Settlement Header Report. D0370 Supplier Half Hourly Demand Disconnection Report D0276 GSP Group Consumption Totals Report. D0373 GSP Group Demand Disconnection Totals Report D0296 Supplier BM Unit Report19 D0374 Supplier BM Unit Demand Disconnection Report |
|
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.14.1 | Two months after end of each calendar quarter. | Generate and send Supplier Quarterly Volume Report containing sum of Supplier volumes and average number of Metering Systems for Settlement Days in the quarter, as determined at First Reconciliation. | SVAA. | BSCCo. | P0275 Supplier Quarterly Volume Report. | Email. |
3.14.2 | Following receipt of 3.14.1 | Generate Supplier Market Share Data in accordance with Section V4.2.10 of the BSC | BSCCo. |
| P0275 Supplier Quarterly Volume Report. BM Unit Metered Volumes. | Internal process. |
|
| Format and publish data | BSCCo. |
| Supplier Market Share Data. | BSC Website. |
Settlement Date; and
Supplier and GSP Group to which it relates.
1 The BM Unit will be one nominated by the Supplier or alternatively where one is not nominated a Base BM Unit will be provided to the SVAA by the MDDM (following receipt of the Base BM Unit from the Central Registration Agent (CRA)).
2 The CDCA will be responsible for the collection and processing of all Metering Systems registered by the CRA.
3 For P344 Proposed, only if Customer consent has been granted.
4 BSCCo will provide the regression equations to the SVAA on an annual basis, as this data is required for use in the DPP Runs.
5 If problem with MDD, raise this with BSCCo via BSCP509.
6 The DPP Run cannot be re-run after the Initial Volume Allocation Run.
7 If a query or dispute is required to be raised, refer to BSCP11.
8 The SVAA standing data will be automatically amended to agree with the data provided by the Data Aggregator by the SVAA software (BSCP507).
9 If more than one file is received from the sender, the SVAA will use the file with the latest creation timestamp in the run. The SVA System must store data relating to the latest Settlement and its associated Interim Information Volume Allocation Run for each Settlement Day for the subsequent reporting. The following data items cannot be modified once the Interim Information Volume Allocation Run has taken place – SSC, Profile Class, Measurement Requirement, Valid SSC Profile Class, Valid Measurement Requirement Profile Class. However, the following data items can be modified once the Interim Information Volume Allocation Run has taken place, subject to authorisation – Supplier, Supplier in GSP Group, DA, DA in GSP Group, GSP Group Correction Scaling Factor, LLFC and Settlement Period LLF.
10 The BSC Service Desk will request second line support from SVAA to resolve the validation errors.
11 The SVA System will allow for the energy volume total to be either negative or positive (i.e. negative consumption totals should not be treated as spill and should not be allocated to other Suppliers).
12 If a MSID Pair delivered volume has been received
13 For P344 Proposed, only where Customer Consent has been given.
14 If a MSID Pair delivered volume has been received.
15 Where such data is available to the NETSO
16 If more than one file is received from the sender, the SVAA will use the file with the latest creation timestamp in the run. The SVA System must store data relating to the latest Settlement and its associated Initial Volume Allocation Run for each Settlement Day for the subsequent reporting. The following data items cannot be modified once the Initial Volume Allocation Run has taken place – SSC, Profile Class, Measurement Requirement, Valid SSC Profile Class, Valid Measurement Requirement Profile Class. However, the following data items can be modified once the Initial Volume Allocation Run has taken place, subject to authorisation – Supplier, Supplier in GSP Group, DA, DA in GSP Group, GSP Group Correction Scaling Factor, LLFC and Settlement Period LLF.
17 Each LDSO will receive a single D0030 dataflow containing data for customers connected to their Distribution System(s) in all the GSP Groups in which the LDSO is operating. Host LDSOs will additionally receive a D0314 dataflow containing data for all embedded networks operated by other LDSOs in the GSP Group corresponding to their distribution services area (with the exception of any directly-connected networks which SVAA has been requested to exclude from the report to the Host LDSO. Such a request should be made to the BSC Service Desk, identifying the LLFC(s) corresponding to the directly connected network, at least 5 Working Days in advance).
18 The D0030 and D0314 will be produced using LDSO mapping data provided on the P0239.
19 This dataflow is optional and is only sent by the SVAA if the Supplier requests the dataflow via the BSC Service Desk.
20 This data flow is only produced for the Initial Settlement (SF), Final Reconciliation (RF) and Final Dispute (DF) Settlement Types
21 T is the Payment Date and this relates to the Settlement Day. All Timetabled Reconciliation Volume Allocation Runs take place a number of Working Days prior to the financial transfers (which take place on the Payment Date) between the FAA and Parties’ Banks.
22 All timescales up to and including the sending of the BM Unit Supplier Take Energy Volume Data File to the SAA are dependent on the SVAA Calendar.
23 If not already sent under 3.2B.3
24 If more than one file received from the sender, the SVAA will use the file with the latest creation timestamp in the run. The SVA System must store data relating to the latest Settlement and its associated Reconciliation Volume Allocation Run for each SD, for subsequent reporting.
25 If CDCA data is to be defaulted, the SVAA will not report that this data is being defaulted to any of the parties listed in this step.
26 Following receipt of this dataflow, the SVAA will investigate the problem and notify the Panel of the outcome of the investigation.
27 The SVAA will distribute a cut down version of these dataflows unless the MDD recipients have specifically requested, via the BSC Service Desk, a full version of these dataflows. However, if all of the data items within the dataflows have changed, the SVAA will provide the complete dataflows to the recipients.
28 The SVAA will distribute a cut down version of these dataflows unless the MDD recipients have specifically requested, via the BSC Service Desk, a full version of these dataflows.
29 MDD recipients for these dataflows will include: Suppliers, DAs, DCs, SVA MOAs, LDSOs, UMSO, Panel, SAA, CDCA, OFGEM, SMRS, NETSO, and SVAA (for use in Stage 2 DPP and Initial Volume Allocation Run). The SVAA will use the MDD matrix to determine how many versions of these dataflows are distributed to each MDD recipient. These dataflows will be sent automatically from the MDDM system to the SVA System. These recipients may also request data on an ad-hoc basis from MDDM.
30 This dataflow will be provided with every publication of the MDD, even though the data contained within the file may not have changed.
31 These dataflows will be provided with every publication of the MDD, even though the data contained within the file may not have changed.
32 These dataflows are optional and will only be provided to a non-BSC party if the SVAA is directed to do so by BSCCo.
33 The version of the D0227 dataflow being sent is the Standard Settlement Configuration extract file.
34 This dataflow will be sent automatically from the MDDM system to the SVA System.
35 This dataflow is optional and is only sent by the SVAA if the HHDA requests the dataflow via the BSC Service Desk.
36 This will not apply for MDD flows that are issued to Parties manually.
37 Where 12 months of data is not available, the SVAA will continue with the re-calculation and the exceptions generated as a result of this will be forwarded to BSCCo for consideration on the next course of action i.e. whether or not to accept the re-calculated values.
38 AFYC, GSP Group Profile Class Average EAC and GSP Group Profile Class Default EAC values will not be re-calculated for those SSCs used only for unmetered supplies.
39 For the avoidance of doubt, this does not include Secondary BM Units
40 The BM Unit data will be received directly by MDDM however the MDDM will not publish this MDD until a request is received from the CCC via Business Event 3.7.
41 A file re-send request is defined as a request from a BSC Party or Party Agent to the SVAA for a file (or files) for which the SVAA has already received a positive acknowledgement.