Virtual Lead Parties (VLP) and Asset Metering VLPs (AMVLP), via their relevant Authorised Signatory to raise / confirm VLP / AMVLP / Asset Metering Agent and Secondary BM Unit changes.
Suppliers, VLPs and AMVLPs, as Lead Parties of Baselined BM Units, via their relevant authorised signatory, to submit BM Unit Allocation Baselining Detail and BM Unit Allocation Event Day changes.
The SVAA who receives MSID Pair Allocation Notifications from VLPs, AMVLPs or the NETSO, and AMSID Pair Allocation Notifications from AMVLPs2, and who obtains the relevant:
MSID Standing Data which comprises details of the Grid Supply Point Group, HHDA, Supplier, Line Loss Factor Class and Consumption Component Class Id for each SVA Metering System;
AMSID Standing Data which comprises details of the Grid Supply Point Group, HHDC, AMHHDC, MOA, AMMOA, Line Loss Factor Class and Consumption Component Class Id for each Asset Metering System registered with the SVAA; and
The SVAA, who receives BM Unit Allocation Baselining Detail and BM Unit Allocation Event Day data from the Lead Parties of Baselined BM Units.
Following a Supplier’s initial entry into the market, Supplier and Supplier Agent related standing data must be provided no later than five Working Days (WD) after the first Supply Start Date (SSD) for the Supplier appointment in the GSP Group.
Following the initial registration of standing data, subsequent updates must be confirmed by the Supplier no later than ten WD following receipt of a monthly report of Standing Data changes from SVAA.
Following the initial registration of SVA Metering Systems in MSID Pairs, subsequent ad hoc notification of new or amended SVA Metering Systems or MSID Pairs by the VLP, [H/K] AMVLP or the NETSO.
Following the initial registration of Assets and related Asset Metering Systems, subsequent ad hoc notification of new or amended Assets and Asset Metering Systems by the AMVLP3,4 or Supplier.
Trading Disputes | |
Authorisations | |
Half Hourly Data Aggregation | |
Supplier Volume Allocation Agent | |
Changes to Market Domain Data | |
Licensed Distribution | |
PARMS Data Provision, Reporting and Publication of Peer Comparison Data | |
Qualification Process for SVA Parties, SVA Party Agents, VLPs, AMVLPs, Asset Metering Agents and CVA MOAs | |
SVA Metering System & Asset Metering System Register |
AFYC | Average Fraction of Yearly Consumption |
AMSID | Asset Metering System Identifier |
AMVLP | Asset Metering Virtual Lead Party |
BCA | BSC Change Administrator |
BM | Balancing Mechanism |
BSC | Balancing and Settlement Code |
BSCCo | Balancing and Settlement Code Company |
BSCP | Balancing and Settlement Code Procedure |
CRA | Central Registration Agent |
EMR | Electricity Market Reform |
GSP | Grid Supply Point |
LDSO | Licensed Distribution System Operator |
MDD | Market Domain Data |
MSID | Metering System Identifier |
NETSO | National Electricity Transmission System Operator |
PARMS | Performance Assurance Reporting and Monitoring System |
PC | Profile Class |
Ref | Reference |
SMRA | Supplier Meter Registration Agent |
SMRS | Supplier Meter Registration Service |
SSC | Standard Settlement Configuration |
SSD | Supply Start Date |
SSR | Supplier Settlement and Reconciliation |
SVA | Supplier Volume Allocation |
SVAA | Supplier Volume Allocation Agent |
VLP | Virtual Lead Party |
WD | Working Day |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | a) Following initial market entry, no later than 5 WD after the SSD for a Supplier appointment. b) Subsequent to initial market entry, as required by the Supplier. | Authorised signatory to send the BSCP507/01A Form to SVAA. | Supplier. | SVAA. | Details of Supplier / Supplier Agent appointments including the effective date of the relationship starting and (if applicable) ending for the GSP Group(s). Complete Form BSCP507/01A, Part A. | Fax / Email. |
c) Following initial market entry d) Subsequent to initial market entry, as required by the VLP or NETSO. | Register MSID Pairs with the SVAA in accordance with BSCP602.
For VLPs and AMVLPs only, allocate MSID Pairs to Secondary BM Units. | VLP, AMVLP, NETSO
| SVAA
| P0278
|
| |
e) Following initial market entry f) Subsequent to initial market entry, as required by the AMVLP. | Register Assets, Asset Metering Agents and Asset Meters with the SVAA in accordance with BSCP602.
Allocate AMSID Pairs to Secondary BM Units.
Include AMSID Pairs in an EMR AMSID Declaration | AMVLP5, Supplier | SVAA | P0297 - Asset Registration P0300 - Asset Metering Agent Appointments P0303 - Asset Meter Registration
P0306 - AMSID Pair Allocation to a Secondary BM Unit EMR AMSID Declaration | Electronic or other method, as agreed.
Self-service Gateway
Self-service Gateway | |
3.1.2 | Within 1 WD of 3.1.1. | Log details of the Form. | SVAA. |
| Complete Form BSCP507/01A, Part B. | Internal Process. |
3.1.3 | Within 1 WD of 3.1.2 | Verify authorised signatory details. | SVAA. |
| Form BSCP507/01A, Part B Relevant authorised signatories list | Internal Process |
3.1.4 | If required, within 1 WD of 3.1.3 | Resolve any problems with the authorised signatory details. If the authorised signatory details cannot be accepted, reject form and notify reasons for rejection. | SVAA.
SVAA. | BSCCo.
Supplier, NETSO, VLP, or AMVLP. | Form BSCP507/01A, Part A Relevant authorised signatories list Notification of rejection, including reasons for rejection | As agreed. |
3.1.5 | Where there are any queries with the changes requested on the BSCP507/01A, Part A form, on same day as 3.1.2. | Liaise with the Supplier, NETSO, VLP or AMVLP to resolve any issues. | SVAA. | Supplier, NETSO, VLP or AMVLP. |
| Fax / Email |
3.1.6 | Within 1 WD of successful verification of both: a) authorised signatory details; and b) changes requested.. | Implement changes requested in the SVAA System. | SVAA. |
| Complete Form BSCP507/01A, Part B. Proceed in accordance with BSCP508. | Internal Process. |
3.1.7 | Within 1 WD of 3.1.6. | Send notification that change(s) incorporated in the SVAA System. | SVAA. | Supplier, NETSO, VLP or AMVLP. | Form BSCP507/01A. | Fax / Post / Email. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.1 | To be received by SVAA no later than Gate Closure for the Settlement Period to which BM Unit applies. | Send the NHH BM Unit Allocation / revised NHH BM Unit Allocation change proposal (following rejection of change proposal by SVAA). | Supplier.7 | SVAA. | Form BSCP507/02. P0185 NHH BM Unit Allocation. | Fax / email. |
3.2.2 | Following 3.2.1 and by Gate Closure for the Settlement Period to which BM Unit applies. | Log change proposal. | SVAA. |
| Confirmation to date and timestamp all change requests received up to and including Gate Closure on every day of the year. | Internal Process. |
3.2.3 | Within 1 WD of 3.2.2. | Load and validate change. | SVAA. |
| Check : 1. that Supplier is a valid Supplier in Market Domain Data. 2. That change is valid for the Supplier / GSP Group combination. 3. That new BM Unit allocation is not inconsistent with existing BM Unit allocation for same PC/SSC/GSP Group/Supplier combination. 4. That new BM Unit allocation for the PC/SSC/GSP Group combination is associated with AFYC data. 5. The date and timestamp indicated on the confirmation : a) If date and timestamp after Gate Closure then BM Unit invalid for use for period indicated in change request. Proceed to 3.2.4 b) If date and timestamp prior to Gate Closure then BM Unit valid for use for period indicated in change request. Proceed to 3.2.5. | Internal Process. |
3.2.4 | Within 1 WD of 3.2.2. | If BM Unit Allocation invalid, send rejection of BM Unit Allocation. Return to 3.2.1 if Supplier wishes to provide revised change proposal. | SVAA. | Supplier. | P0035 Invalid Data. | Fax / email. |
3.2.5 | Within 1 WD of 3.2.2. | If BM Unit Allocation valid send confirmation of acceptance of BM Unit Allocation. | SVAA. | Supplier. | Form BSCP507/02. Proceed in accordance with BSCP508. | Fax / email. |
If Supplier notices an error | ||||||
3.2.6 | Within 1 WD of identifying the error | Notify SVAA of error in BM Unit Allocation. | Supplier. | SVAA. | Details of suspected error. | Fax / email |
3.2.7 | On same day as 3.2.6 | Notify BSCCo of detection of error by Supplier or SVAA. | SVAA | BSCCo | Details of suspected error. | Fax / email |
3.2.8 | Within 1 WD of 3.2.7 | Decide whether the BM Unit Allocation should be modified for the Supplier. | BSCCo |
|
| Internal Process |
3.2.9 | On same day as 3.2.8 | Inform SVAA of the decision. | BSCCo | SVAA | Details of change required. | Fax / email |
3.2.10 | Within 1 WD of 3.2.9 | If instructed, modify the BM Unit Allocation for the Supplier. | SVAA |
|
| Internal Process |
3.2.11 | Once every week | Send BSCCo a summary of BM Unit Allocations covering the previous 5 days, listing those BM Unit Allocations entered correctly and those that required additional alteration. | SVAA | BSCCo | P0209 Summary of NHH BM Unit Allocation Standing Data Changes. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | Within 1 WD of change(s) becoming effective. | Send SVAA contact detail change(s). | SVAA. | CRA. | P0194 Receive BSC Agent Details. | Manual Process / Self-Service Gateway. |
3.3.2 | Within 1 WD of 3.3.1. | Log and validate change proposal. | CRA. |
|
| Internal Process. |
3.3.3 | Within 1 WD of 3.3.2. | Send rejection of change(s). | CRA. | SVAA. | P0035 Invalid Data. | Manual Process. |
3.3.4 | Within 1 WD of 3.3.2. | Send confirmation of acceptance of change(s). | CRA. | SVAA. | P0195 Issue Registration Report. | Manual Process / Self-Service Gateway. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | Within 3 WD of any updates to relevant authorised signatories list | Issue relevant authorised signatories list. | BSCCo. | SVAA. | Relevant authorised signatories list | |
3.4.2 | By 3rd WD of each month | Issue report of all Standing Data changes made in the previous calendar month. | SVAA. | Supplier. BSCCo. | P0219 Standing Data Changes for Supplier in a GSP group P0220 Standing Data Changes for Supplier/ Data Aggregator in a GSP group P0219 and P0220 Instructions for Suppliers Form BSCP507/01B | |
3.4.3 | Within 10 WD of 3.4.2 | Review P0219 and P0220 data. | Supplier. |
|
| As agreed. |
3.4.4 | Within 10 WD of 3.4.2 | If the changes are not consistent with the Supplier’s view of the Appointment of the Data Aggregator, Supplier to correct the issue accordingly. | Supplier. | HHDA. NHHDA. | The association marked Y in the Accept Action or Reject Action columns from the P0219 and/or P0220 flow(s) | As agreed. |
3.4.5 | Within 10 WD of 3.4.2 | If the changes are consistent with the Supplier’s view of the Appointment of the Data Aggregator, accept or reject each change (providing alternative date ranges if necessary). | Supplier. | SVAA. BSCCo. | P0219 Standing Data Changes for Supplier in a GSP group P0220 Standing Data Changes for Supplier/ Data Aggregator in a GSP group Form BSCP507/01B, Part A For details on completing the forms see the Instruction Sheet which is provided with the P0219 and P0220 emails | Email/Fax |
3.4.6 | Within 1 WD of receipt of P0219 and P0220 | Log P0219 and P0220 forms. | SVAA. |
| P0219 Standing Data Changes for Supplier in a GSP group P0220 Standing Data Changes for Supplier/ Data Aggregator in a GSP group Form BSCP507/01B | Email/Fax |
3.4.7 | Within 1 WD of 3.4.6 | Verify authorised signatory details. | SVAA. |
| Form BSCP507/01B, Part B | Internal Process |
3.4.8 | Within 1 WD of 3.4.6 | Resolve any problems with the authorised signatory details. If the authorised signatory details cannot be accepted, reject form and inform Supplier of reasons for rejection. | SVAA. SVAA. | BSCCo. Supplier. | Form BSCP507/01B, Part A Relevant authorised signatories list Notification of rejection, including reasons for rejection | As agreed. |
3.4.9 | Within 1 WD of 3.4.6 | Resolve any problems on P0219 and P0220 flows. | SVAA. | Supplier. | P0219 Standing Data Changes for Supplier in a GSP group P0220 Standing Data Changes for Supplier/ Data Aggregator in a GSP group | As agreed. |
3.4.10 | Within 5 WD of 3.4.6 | Implement changes in SVA System, based upon information provided by Suppliers in the P0219 and P0220 flows. Confirm implementation. | SVAA. | Supplier. | P0219 Standing Data Changes for Supplier in a GSP group P0220 Standing Data Changes for Supplier/ Data Aggregator in a GSP group Form BSCP507/01B, Part C | Email/Fax |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.1 | Annually, by 40 Calendar Days before 1 April each year. | Send Standard Settlement Configuration and Time Pattern Regime combination to be used to report aggregated HH data for each relevant Line Loss Factor Class. | LDSO | SVAA | P0239 Mapping Data for HH Aggregated Metering Systems. | Electronic or other method as agreed. |
3.5.2 | Following 3.5.1. | Enter LDSOs mapping data and validate against the received data. | SVAA |
| P0239 Mapping Data for HH Aggregated Metering Systems. | Internal Process. |
3.5.3 | Following 3.5.2. | Notify relevant LDSO that its mapping data has been processed. | SVAA | LDSO |
| Electronic or other method as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.6.1 | At any time | Receive notification of a VLP or AMVLP and Secondary BM Units from the CRA | CRA | SVAA | P0181 Stage 2 BM Unit Registration8 | Electronic or other method as agreed. |
3.6.2 | Following 3.6.1 | Store data in the SVA Metering System and Asset Metering System Register | SVAA |
| P0181 Stage 2 BM Unit Registration99 P0297 Asset Registration P0300 Asset Metering Agent Appointments P0303 Asset Meter Registration | Internal Process |
3.6.3 | At any time | SVAA to receive and validate MSID Pair details from the VLP, AMVLP or the NETSO in accordance with BSCP602 | VLP, AMVLP, NETSO | SVAA | P0278 MSID Pair Allocation
| Self Service Gateway or other method as agreed. |
SVAA to receive and validate AMSID Pair details from an AMVLP5 or Supplier in accordance with BSCP602. | AMVLP5, Supplier | SVAA | P0306 AMSID Pair Allocation to a Secondary BM Unit
| Self Service Gateway or other method as agreed. | ||
3.6.4 | Within 1 WD of 3.6.3 | Procure and record MSID and AMSID Standing Data | SVAA |
|
| Internal Process |
3.6.5 | At any time | Receive notification of HHDA Metering System Reporting Rejection | HHDA | SVAA | D0356 - Metering System Reporting Rejection |
|
3.6.6 | Within 1 WD of 3.6.5 | Re-procure and record MSID Standing Data | SVAA |
|
|
|
3.6.7 | Within 1 WD of 3.6.5 | Where re-procurement of MSID Standing Data results in change of HHDA send reporting notification to new HHDA | SVAA | HHDA | D0354 – Metering System Reporting Notification9 | Electronic or other method as agreed. |
3.6.8 | As late as possible (to ensure most recent data from HHDA) to meet SVAA’s Calendar. | SVAA identify missing MSID Metered Volumes expected from the HHDA | SVAA |
|
| Internal Process |
3.6.8A | 4 hours before the end of business hours on the SF SVA Notification Date in the SVA Settlement Calendar
and, where estimated data was submitted at SF, and no actual data has been submitted subsequently
4 hours before the end of business hours on the relevant Reconciliation VAR SVA Notification Date in the SVA Settlement Calendar | SVAA to identify missing AMSID Metered Volumes expected from the HHDC
| SVAA |
|
| Internal Process |
SVAA notifies HHDC & AMVLP or Supplier | SVAA | HHDC AMVLP or Supplier | P0310 – Missing Metering System Data | Electronic or other method as agreed. | ||
3.6.9 | Within 1 WD of 3.6.8 | Re-procure and record MSID Standing Data | SVAA |
|
| Internal Process |
3.6.10 | Within 1 WD of 3.6.8 | Where re-procurement of MSID Standing Data results in change of HHDA send reporting notification to new HHDA | SVAA | HHDA | D0354 – Metering System Reporting Notification9 | Electronic or other method as agreed. |
3.6.11 | Upon receipt of a D0385 Metering System Half Hourly Metered Volumes | Validate that the Supplier held within the D0385 matches the Supplier recorded in the SVA Metering System and Asset Metering System Register | SVAA |
| D0385 Metering System Half Hourly Metered Volumes | Internal Process |
3.6.11A | Upon receipt of a D0268 Asset Metering System Half Hourly Metered Data | Validate that the HHDC issuing the D0268 matches the HHDC recorded in the SVA Metering System and Asset Metering System Register for each AMSID | SVAA |
| D0268 Asset Metering System Half Hourly Metered Data |
|
3.6.12 | Within 1 WD of 3.6.11 | SVAA identify an inconsistency between Supplier held on D0385 and the SVA Metering System Register | SVAA |
|
| Internal Process |
3.6.12A | Within 1 WD of 3.6.11A | SVAA identify an inconsistency between HHDC issuing a D0390 and the SVA Metering System and Asset Metering System Register | SVAA |
|
| Internal Process |
3.6.13 | Within 1 WD of 3.6.11 | Re-procure and record MSID Standing Data |
|
|
| Internal Process |
3.6.13A | Within 1 WD of 3.6.11A | Re-procure and record AMSID Standing Data |
|
|
| Internal Process |
3.6.14 | Within 1 WD of 3.6.8 | Where re-procurement of MSID Standing Data results in change of HHDA send reporting notification to new HHDA | SVAA | HHDA | D0354 – Metering System Reporting Notification9 | Electronic or other method as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.7.1 | At any time | Receive notification of a Baselined BM Unit and validate it in accordance with BSCP6029. | Lead Party
| SVAA
| P0335 - BM Unit Baselining Status | Electronic or other method, as agreed. |
3.7.2 | Immediately following 3.7.1 | Store valid Baselined BM Unit data in the SVA Metering System and Asset Metering System Register. | SVAA |
|
| Internal |
3.7.3 | At any time after 3.7.2 | Receive notification of BM Unit Baselining Allocation Detail and validate it in accordance with BSCP602. | Lead Party
| SVAA
|
| Electronic or other method, as agreed. |
3.7.4 | Immediately following 3.7.3 | Store valid BM Unit Baselining Allocation Detail data in the SVA Metering System and Asset Metering System Register. | SVAA |
|
| Internal |
3.7.5 | At any time after 3.7.2 | Receive notification of BM Unit Baselining Event Day data and validate it in accordance with BSCP602. | Lead Party
| SVAA
| P0323 - BM Unit Baselining Event Day | Electronic or other method, as agreed. |
3.7.6 | Immediately following 3.7.5 | Store valid BM Unit Baselining Event Day data in the SVA Metering System and Asset Metering System Register. | SVAA |
|
| Internal |
Data Flow | DC Flow Ref | From | To |
Supplier in a GSP Group | P0030 | Supplier | SVAA |
Data Aggregator in a GSP Group | P0031 | Supplier | SVAA |
Data Collector in a GSP Group | P0032 | Supplier, VLP, AMVLP | SVAA |
Acknowledgement | P0024 | SVAA | Supplier |
Missing Data | P0310 | SVAA | VLP, AMVLP, HHDA, HHDC Supplier |
Invalid Data | P0035 | SVAA | Supplier |
NHH BM Unit Allocation | P0185 | Supplier | SVAA |
Receive BSC Agent Details | P0194 | SVAA | CRA |
Issue Registration Report | P0195 | CRA | SVAA |
Standing Data Changes for Supplier in a GSP group | P0219 | SVAA | Supplier, BSCCo |
Standing Data Changes for Supplier in a GSP group | P0219 | Supplier | SVAA, BSCCo |
Standing Data Changes for Supplier/ Data Aggregator in a GSP group | P0220 | Supplier | SVAA, BSCCo |
Standing Data Changes for Supplier/ Data Aggregator in a GSP group | P0220 | SVAA | Supplier, BSCCo |
Supplier Volume Allocation Agent System Supplier / Supplier Agent Standing Data Change Form BSCP507/01B | Email or Fax | SVAA Use Only |
| Ref No | |
AUTHORISATION OF CHANGES REQUIRED PART A - SUPPLIER FOR P0219 and P0220 FORMS
Supplier ID:
AUTHORISED SIGNATORY NAME: _______________________________ PARTY ID: _____________________________________________________ PASSWORD: ___________________________________________________ SIGNATURE: _________________________________________(only if sent via FAX) DATE: ___________________________________________________________
| ||
VERIFICATION OF DETAILS PART B – SVAA DATE RECEIVED _____________________ NAME AND PASSWORD/SIGNATURE VALID (Y/N) ____________________
| ||
CHANGE APPLIED PART C – SVAA NAME DATE DATE CONFIRMATION SENT TO SUPPLIER |
Supplier Volume Allocation Non Half Hourly Balancing Mechanism Unit Allocation Standing Data Change Form BSCP507/02 |
| SVAA Use Only |
| Ref No |
Supplier Id |
|
GSP Group Id |
|
Change Type (Ad / Am / De10) | BM Unit Id (maximum of 11 characters)
| Profile Class ID (maximum of 1 character) | SSC ID (maximum of 4 characters) | Effective From Settlement Date (NHH BM Unit Allocation) | Effective To Settlement Date (NHH BM Unit Allocation) | |||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Change Type (Ad / Am / De11) | BM Unit Id (maximum of 11 characters)
| Profile Class ID (maximum of 1 character) | SSC ID (maximum of 4 characters) | Effective From Settlement Date (NHH BM Unit Allocation) | Effective To Settlement Date (NHH BM Unit Allocation) | ||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Version | Date | Description of Changes | CRs Included | Mods Panel Ref |
1.0 | Code Effective Date | Re-badging version. |
|
|
2.0 | Code Effective Date | Approved for use by the Panel. |
|
|
3.0 | 02/07/02 | Changes relating to the reduction in Gate Closure time period embodied for P12. | AR1220 | SVG/17/204 |
4.0 | 03/02/03 | SVA Documentation Batch Release. | CPs 518, 668, 680, 786 | SVG/22/275 |
5.0 | 24/06/03 | Changes for the CVA Programme June 03 Release. | CP695 |
|
7.011 | 01/08/03 | Updated for Modification P62. | P62 | SVG/29/390 |
8.0 | 30/06/2004 | Change proposal for the CVA Programme June 04 release | CP971 | SVG/40/004 |
9.0 | 03/11/2004 | Change Proposal for the CVA Programme Nov 04 release | CP1032 | TDC/58/03 |
10.0 | 23/02/2005 | SVA February 2005 Release and BETTA 6.3 | P159, CP942, CP1091 and BETTA 6.3 | SVG/47/004 |
11.0 | 23/02/2005 | SVA February 2006 Release | CP1093, CP1130 | SVG/51/003 SVG/53/002 |
12.0 | 22/02/2007 | February 2007 Release | CP1156, CP1176 | SVG/62/03 SVG67/17 ISG68/02 |
13.0 | 23/08/2007 | P197 Release | P197 | P/115/04 |
14.0 | 05/11/09 | November 2009 Release | CP1278 v 2.0 | ISG100/01 SVG100/02 |
15.0 | 05/11/15 | November 2015 Release | P300 | P228/06 |
16.0 | 28/02/19 | February 2019 Release | P344 | P284C/01 |
|
| February 2019 Release | CP1510 | ISG211/06 SVG214/02 |
17.0 | 01/04/20 | April 2020 Standalone Release | P354, P388 | SVG229/07 |
18.0 | 30/06/22 | June 2022 Standard Release | P375 | P309/06 |
19.0 | 23/02/2023 | February 2023 Standard Release | P376 | P314/06 |
20.0 | 13/07/2023 | November 2023 Standard Release | P395 | P340/05 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 MDD also maintains information regarding the GSP Groups in which Licensed Distribution System Operators (LDSOs) and Supplier Meter Registration Agents (SMRAs) are operating.
3Note that SVAA will generate an AMSID Pair on the successful registration of an Asset and related Asset Metering System(s).
4VLPs that wish to register an Asset and its Asset Metering Systems and to allocate the related AMSID Pair to a Secondary BM Unit must complete the Asset Metering VLP Qualification process to become AMVLPs.
5 VLPs that wish to register an Asset and its Asset Metering Systems and to allocate the related AMSID Pair to a Secondary BM Unit must additionally complete the Asset Metering VLP Qualification process.
6 Suppliers should note the following:
If an NHH BM Unit Allocation is only required to be effective for a particular Settlement Day, Form BSCP507/02 should be submitted with dates in both the Effective From and Effective To fields;
Non Half Hourly consumption will be allocated to the Base BM Unit by default, without any need to submit additional allocations;
Specifying an Effective To date will terminate an allocation to an additional BM Unit once the date has been reached.
7 The originator of the NHH BM Unit data must be authorised in accordance with BSCP38.
8 The SVA shall specify the Effective from Settlement Date (J1869) the Effective to Settlement Date (J1870) in the D0354 Metering System Reporting Notification
9 Note that the Lead Party may alternatively register the Baselined BM Unit with CRA in accordance with BSCP15, in which case the SVAA will be able to access the data through the shared Elexon Kinnect database.
10 Select one of the following change types: Ad – Addition, Am – Amendment, De - Deletion
11 Version 6.0 was not issued due to an administrative error.