Advanced Search

BSCP128 Appendix 08: SVA Summary Report V2.0

Effective From Date:
Status:LIVE
Download

BSCP128 - Appendix 8 relating to SVA Summary Report

1. Reference is made to the Balancing and Settlement Code (the Code) for the Electricity Industry in Great Britain and, in particular, to the definition of "BSC Procedure".

2. This is BSCP128 Appendix 8, Version 2.0 relating to the SVA Summary Report.

3. This BSC Procedure Appendix is effective from 26 June 2014.

4. This BSC Procedure has been approved by the Panel.

The Summary Report is a schedule of Line Loss Factors provided to the LDSO:

Line Loss Factor Information

LDSO

Distributor Id

Line Loss Factor Class Id(s)

Start Date

End Date

Day Type

P01

F01

P02

F02

P03

F03

P04

F04

P05

F05

P06

F06

P07

F07

P08

F08

01/04/98

30/09/98

WD

01

1.065

16

1.075

01/10/98

31/10/98

WD

01

1.080

16

1.085

26

1.075

36

1.070

01/11/98

30/11/98

WD

01

1.085

06

1.080

12

1.085

18

1.090

26

1.085

30

1.090

36

1.085

42

1.080

01/12/98

31/01/99

WD

01

1.085

06

1.080

12

1.085

18

1.090

26

1.085

30

1.095

36

1.085

42

1.080

01/02/99

28/02/99

WD

01

1.085

06

1.080

12

1.085

18

1.090

26

1.085

30

1.090

36

1.085

42

1.080

01/03/99

31/03/99

WD

01

1.080

16

1.085

26

1.075

36

1.070

01/04/98

30/09/98

NWD

01

1.065

16

1.075

01/10/98

31/10/98

NWD

01

1.080

16

1.085

26

1.070

01/11/98

30/11/98

NWD

01

1.085

06

1.080

14

1.085

26

1.080

01/12/98

31/01/99

NWD

01

1.085

06

1.080

14

1.085

26

1.080

01/02/99

28/02/99

NWD

01

1.085

06

1.080

14

1.085

26

1.080

01/03/99

31/03/99

NWD

01

1.080

16

1.085

26

1.070

The SVA Summary Report shows the start periods and applicable line loss factors for a group of Line Loss Factor Classes. The report will be in rich text format.

complex image of process

AMENDMENT RECORD – BSCP128 APPENDIX 8

Version

Date

Description of Changes

Changes Included

Mods Panel Ref

1.0

20/04/09

First Published

P216

153/04

2.0

26/06/14

June 2014 Release

CP1407 v2.0

ISG157/01

SVG160/05

P225/12

Intellectual Property Rights, Copyright and Disclaimer

The copyright and other intellectual property rights in this document are vested in ELEXON or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make.

All other rights of the copyright owner not expressly dealt with above are reserved.

No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it.