Balancing and Settlement Code
BSC PROCEDURE
Registration of Metering Systems for Central Volume Allocation
BSCP20
Date:
|
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
VERSION | DATE | DESCRIPTION OF CHANGES | CRs INCLUDED | MODS PANEL REF |
1.0 | Code Effective Date | Designated version | n/a | n/a |
2.0 | 14/12/2000 | Work outstanding at Go Active resolution of inconsistencies inclusion of consultation comments | 205, 224 | 09/006 |
3.0 | 22 February 2001 | Provision of Meter System and Outstation registration and technical details to TC | 171 | 13/007 |
4.0 | 13/08/2002 | Change Proposals for BSC Systems Release 2 | CP567, 569, 615, 521, 546, 726, 780 | ISG 16/166, 1SG 18/193 |
5.0 |
| Change Proposals for CDCA Improvement Project, P55/CP753 and December 02 Release | CP637, CP780, P55, CP753 |
|
6.0 | 24/06/2003 | Remove Proving Tests – following introduction of new BSCP02 | CP821 | ISG/17/176 |
7.0 | 01/08/2003 | Approved Modification P62 for June 03 Release | P62 | P62 48/003 |
8.0 | 15/03/2004 | Change Proposal CP1027 | CP1027 | ISG/37/414 |
9.0 | 30/06/2004 | Change Proposals for the CVA Programme June-04 Release. | CP940 CP971 CP946 | ISG/40/003 |
10.0 | 23/02/2005 | CVA Programme Feb 05 Release | BETTA 6.3, P159, CP1049 | 17/08/2004 |
11.0 | 02/11/2005 | CVA Programme November 05 Release | CP1108 P192 | ISG52/003 P96/004 |
12.0 | 28/06/2006 | June 06 Release | P190 | ISG/64/001 |
13.0 | 23/08/2007 | P197 Release | P197 |
|
14.0 | 28/02/08 | February 08 Release | CP1201 | ISG81/01 SVG81/01 |
15.0 | 26/06/08 | June 08 Release | CP1223 | SVG84/02, ISG84/01, TDC109/01, PAB84/11 |
16.0 | 26/02/09 | February 09 Release | CP1255 | ISG93/02 |
17.0 | 28/06/12 | June 2012 Release | CP1357 | ISG131/02 |
18.0 | 28/02/19 | February 2019 Release | P344 | Panel 284C/01 |
19.0 | 29/03/19 | March 2019 Standalone Release | P369 | Panel 285/12 |
20.0 | 03/11/2022 | November 2022 Release | CP1566 | ISG257/05, SVG259/09 |
BSCP02 | Proving Test Requirements for Central Volume Allocation Metering Systems |
BSCP06 | CVA Meter Operations for Metering Systems Registered in CMRS |
BSCP15 | BM Unit Registration |
BSCP25 | Registration of Transmission System Boundary Points, Grid Supply Points, GSP Groups and Distribution Systems Connection Points |
BSCP27 | Technical Assurance of Half Hourly Metering Systems for Settlement Purposes |
BSCP32 | Metering Dispensation |
BSCP38 | Authorisations |
BSCP68 | Transfer of Registrations of Metering Systems Between CMRS and SMRS |
BSCP75 | Registration of Meter Aggregation Rules for Volume Allocation Units |
BSCP501 | Supplier Meter Registration Service |
BSCP515 | Licensed Distribution |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs |
BSCCo | Balancing and Settlement Code Company |
BSCP | Balancing and Settlement Code Procedure |
BST | British Summer Time |
CDCA | Central Data Collection Agent |
CEEC | Commissioning End to End Check |
CMRS | Central Meter Registration Service |
CoPBLP | Change of Primary BM Unit Lead Party |
CoP | Code of Practice |
CRA | Central Registration Agent |
CT | Current Transformer |
CVA | Central Volume Allocation |
EFD | Effective From Date |
GSP | Grid Supply Point |
LDSO | Licensed Distribution System Operator |
LEG | License Exempt Generator |
MOA | Meter Operator Agent |
MSID | Metering System Identifier |
MSN | Meter Serial Number |
MTD | Meter Technical Details |
NETSO | National Electricity Transmission System Operator as the holder of the Transmission Licence and any reference to “NETSO”, “NGESO”, “National Grid Company” or “NGC” in the Code or any Subsidiary Document shall have the same meaning. |
PSTN | Public Switched Telephone Network |
REFD | Registration Effective From Date |
RETD | Registration Effective To Date |
SMRS | Supplier Meter Registration Service |
SVA | Supplier Volume Allocation |
VT | Voltage Transformer |
WD | Working Day |
Registration Effective From Date (REFD) | The Settlement day from which the Metering System is to be utilised for trade. |
Registration Effective To Date (RETD) | The final Settlement day that the Metering System is to be utilised for trade. |
Instation | A computer system which collects or receives data remotely on a routine basis from selected Outstations by a Data Collector. |
Registration Systems | The systems(s) used by the CRA and CDCA to fulfil their obligations in respect of registration under the Code. |
Nominated Licensed Distribution System Operator | The Nominated LDSO is the LDSO who has obligations to submit the GSP Group Metered Volume Aggregation Rules. For the avoidance of doubt, the Nominated LDSO is the LDSO who was responsible for each GSP Group on 01 August 2003 or the Scottish Distribution Licensee in respect of that Bulk Supply Point Group under the Settlement Agreement for Scotland on 1 August 2003. |
EFD | The date that a specified change comes into effect |
REF | WHEN2 | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.1.13 | At least 20WD before REFD of Boundary / Systems Connection Point | Provide registration data of Boundary Point or Systems Connection Point1 at location of new Metering System as registered according to BSCP25. | LDSOs / NETSO (as appropriate) | CRA | Details as provided in BSCP25/5.1 (Registration/De-registration of Transmission System Boundary Point) or BSCP25/5.2 (Registration of Distribution Systems Connection Point) | Fax/Email |
3.1.2 | On receipt of 3.1.1 | Forward registration details of Boundary / Systems Connection Point to BSCCo Where the LDSO specified on the BSCP25/5.2 form is not the Nominated LDSO for the GSP Group, CRA should also inform the Nominated LDSO of the registration | CRA | BSCCo / Nominated LDSO | As submitted in 3.1.1 | Fax/Email |
3.1.3 | At least 20WD before the REFD of the Metering System | Provide registration data of Metering System4 | Registrant | CRA | BSCP20/4.1, Registration of Metering System signed by an authorised person, registered as such via BSCP38 Or CRA-I031 Metering System Data5 | Fax /Email /Post
Electronic |
3.1.4 | On receipt of notice in 3.1.3 | Check that the Registrant is a valid Party or is to become a Party before or on the REFD with the BSCCo | CRA | Internal/ BSCCo (as appropriate) | Registrant of the proposed Metering System | Fax/Internal (as appropriate) |
3.1.5 | On receipt of notice in 3.1.3 | Check that the MOA is registered. | CRA |
| MOA of the proposed Metering System | Internal Process |
3.1.6 | Within 1WD of receipt of 3.1.3 | Allocate a MSID to the Metering System and notify Registrant, MOA and CDCA. (The Registration Report CRA-I014 will be circulated at the end of each day once the change or registration has been input into the CRA system) | CRA | Registrant CDCA MOA | MSID of Metering System using data as submitted in 3.1.3 | Fax/Email
|
3.1.7 | Within 2WD of receipt from 3.1.6 | The MOA may object to the registration on the understanding that they are not the MOA for the Metering System. | MOA | CRA | MOA details why they are not the MOA for the Metering System. | Fax/Email |
3.1.8 | Where an objection has been raised by the MOA. | The CRA shall notify the Registrant that the MOA has objected to the registration and therefore registration has been rejected. | CRA | Registrant | MOA objection details. | Fax/Email |
3.1.9 | At least 16WD prior to REFD and after receipt of MSID allocation. | If no objections to the registration, provide Meter Technical Details and confirm whether a CEEC is required. | MOA or Registrant | CDCA | BSCP20/4.3, Registration of Meter Technical Details Signed by an authorised person, registered as such via BSCP38 (CDCA-I003 Meter Technical Details) | Fax/Post/Email
|
3.1.10 | Within 1WD of receipt of 3.1.9 | CDCA to validate the Meter Technical Details provided by the MOA or Registrant and inform MOA or Registrant of any discrepancies.6 | CDCA | MOA or Registrant | Meter Technical Details (CDCA-I051) | Fax/Email |
3.1.11 | In accordance with BSCP02 | Carry out Proving Tests7 | MOA | CDCA | Refer to BSCP02 |
|
3.1.12 | Prior to REFD | Provide Metering Technical Details Report of data entered into system and Registrant to confirm accuracy. | CDCA | Registrant, MOA, NETSO and if appropriate relevant LDSO | Meter Technical Details Report (CDCA-I051). | Fax/Post/Email |
3.1.13 | Prior to REFD | Once the requirements of the relevant conditions set out in Section K.2.2.4 of the BSC have been fulfilled, provide registration reports of data entered into system and Registrant to confirm accuracy | CRA | Registrant
NETSO | Registration reports of data entered into systems – Registration Report (CRA-I014), NETSO Standing Data Report (CRA – I028). | Electronic |
3.1.14 | After REFD, and where required | Carry out CEEC in accordance with BSCP02. | CDCA | Registrant | Refer to BSCP02 |
|
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.2.1 | At least 20WD before relevant de-registration REFD | If appropriate, send Boundary Point or Systems Connection Point de-registration request to CRA | LDSOs / NETSO (as appropriate) | CRA | BSCP25/5.1 Registration/De-registration of Transmission System Boundary Point or BSCP25/5.5 De-registration of Distribution System Connection Point | Fax/Email |
3.2.2 | Upon receipt of 3.2.1 | Check that the details in the de-registration request are consistent with those in the CRA records and forward to BSCCo. Where appropriate, the LDSO specified on the BSCP25/5.52 form is not the nominated LDSO for the GSP group, CRA should also inform the Nominated LDSO of the de-registration | CRA | BSCCo / LDSO |
| Fax/Email |
3.2.33 | At least 20WD before ceasing to be Registrant | In the event of a Registrant ceasing to be Registrant (other than where he is being replaced by a change of Registrant) notification must be given | Registrant | CRA | BSCP20/4.7, De-Register Metering System, signed by authorised person, registered via BSCP38 Certificate of Disconnection8 Or CRA-I031 Metering Systems Data | Fax/Email/Post
Electronic |
3.2.4 | On receipt of notice in 3.2.3 | If the de-registration relates to only the Export MSID(s) at an Exemptable Generating Plant, CRA to inform BSCCo. | CRA | BSCCo | BSCP20/4.7: De-Register Metering System | Fax/ Email |
3.2.5 | On receipt of notice in 3.2.3 | BSCCo to check that the RETD is the same as that for the related Import MSID(s) at an Exemptable Generating Plant in the relevant SMRS, or that the Export MSID(s) at an Exemptable Generating Plant are being transferred to SMRS. | BSCCo | Relevant LDSO | Check RETD with relevant SMRA Note: Relevant SMRA will be identified on BSCP20/4.7 from ‘LDSO Id’ | Fax/ Email |
3.2.6 | Within 1WD of notification in 3.2.4 | If checks in 3.2.5 are unsatisfactory confirm de-registration details with Registrant. | BSCCo | Registrant | Confirm that information on BSCP20/4.7: De-Register Metering System is correct | Telephone/ Fax / Email |
3.2.7 | Within 1WD of notification in 3.2.4 | If checks in 3.2.5 are satisfactory inform CRA to continue with de-registration. | BSCCo | CRA | Notification that de-registration of Export MSID(s) only can proceed | Fax/ Email |
3.2.8 | At the same time as 3.2.7 | BSCCo to update internal records. | BSCCo |
| Update records for Metering Equipment at an Exemptable Generating Plant comprised in both an SVA Metering System and a CVA Metering System | Internal Process |
3.2.9 | Within 2WD of receipt of notice in Ref 3.2.3 above | Notify CDCA of the intended De-Registration of Metering System | CRA | CDCA | De-Registration Metering System details and RETD | Electronic |
3.2.10 | Prior to RETD | Amend register with Metering System details. | CRA |
Registrant
NETSO | Registration reports containing details (where required updated RETD). Registration report (CRA – I014),
NETSO Standing Data Report (CRA – I028). | Electronic |
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM | ||||||||
| 3.3.1 | At least 20WD before REFD | Provide Registration data of Metering System | New Registrant | CRA Existing Registrant | BSCP20/4.1, Registration of Metering System signed by an authorised person, registered as such via BSCP38 Or CRA-I031 Metering System Data | Fax/Email
Electronic | |||||||
| 3.3.2 | Within 1WD of receipt of notice in Ref 3.3.1 | Notify CDCA of the intended Change of Registrant of Metering System | CRA | CDCA | Registration Metering System details and REFD | Fax/Email | |||||||
| 3.3.3 | Within 5WD of 3.3.1 | The Existing Registrant returns form BSCP20/4.6 if they have any objections | Existing Registrant | CRA New Registrant | BSCP20/4.6, Objection to change of Metering System Registration | Fax /Email | |||||||
| 3.3.4 | Within 1WD of receipt of objection in 3.3.3 | If the Existing Registrant objects the CRA must refer the matter to BSCCo to resolve.10 | CRA | BSCCo | Details of registration and objection including copies of relevant forms | Post/Fax/Email/ Electronic | |||||||
| 3.3.5 | At the same time as 3.3.4 | Inform CDCA of the objection to the Metering System registration and leave pending | CRA | CDCA | Objection of Metering System registration | Fax/Email | |||||||
| 3.3.6 | Prior to REFD | If no objection to the registration has been received, or any objection has been resolved, update and send details of Metering Systems to be effective on REFD. | CRA |
Registrant NETSO | Registration reports of data entered into the system Registration report (CRA – I014), NETSO Standing Data Report (CRA – I028). | Electronic | |||||||
3.3.7 | After REFD, and where requested | Establish whether a CEEC has been completed and, if necessary, request a CEEC is carried out in accordance with BSCP02. | Registrant | CDCA | Refer to BSCP02 |
|
|
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.4.1 | At least 20WD before REFD | Registrant to provide notification of a change in MOA associated with a Metering System to CRA MOAs and where only the Export MSID(s) relating to Exemptable Generating Plant is registered in CRA, to BSCCo. | Registrant | CRA New MOA Old MOA BSCCo (as appropriate) | BSCP20/4.8, Appointment of New Meter Operator Agent signed by an authorised person, registered as such via BSCP38 Or CRA-I003 Party Agent Registration Data | Fax/Email
Electronic |
3.4.2 | Within 3WD of receipt of notice in 3.4.1 | The Old or New MOA may object to the intended registration on the understanding that they will not be the MOA for the Metering System. | New MOA Old MOA | CRA | MOA details why they are not the MOA for the Metering System. | Fax/Email |
3.4.3 | Upon receipt of 3.4.1 | Check that the new MOA is registered. | CRA |
| Check that the MOA is registered | Internal Process |
3.4.4 | Within 1WD of receipt of notice in 3.4.1 | Check that new MOA is responsible for both Import and Export Meter(s) registered in CRA. | CRA |
| Check database for Import and Export MSID(s) | Internal Process |
3.4.5 | Within 1WD of receipt of notice in 3.4.1 | Where only the Export Meter(s) relating to Exemptable Generating Plant is registered in CRA, check that the related Import Meter(s) at that same Exemptable Generating Plant is registered in relevant SMRS, and that the appointed MOA is Qualified for both CVA and SVA Metering Systems. | BSCCo |
| a) Confirmation of registration of Import MSID(s) in SMRS b) Confirmation that appointed MOA is Qualified for CVA and SVA Metering Systems | Internal Process |
3.4.6 | Within 1WD of 3.4.4 | If checks in 3.4.5 are unsatisfactory confirm change of MOA associated with a Metering System details with Registrant and if necessary notify the CRA that the process has been rejected. | BSCCo | Registrant CRA | Confirm that information on BSCP20/4.8, Appointment of New Meter Operator Agent is correct | Telephone/ Fax/Email |
3.4.7 | Within 1WD of 3.4.5 | If checks prove satisfactory inform CRA that change of registration of MOA can proceed. | BSCCo | CRA | Confirmation that change of registration of MOA can proceed | Fax |
3.4.8 | Where an objection has been raised by the MOA. | The CRA shall notify the Registrant that the MOA has objected to the registration and therefore change in MOA has been rejected. | CRA | Registrant | MOA objection details. | Fax/Email |
3.4.9 | Within 5WD of receipt of 3.4.1 | If the MOA has not objected, notify CDCA of change in MOA. | CRA | CDCA | Notification that the MOA is to change on the REFD for the Metering System. | Fax/Email |
3.4.10 | At least 10WD prior to REFD | Pass Meter Technical Details to new MOA (if appropriate). | CDCA | New MOA | Meter Technical Details | Fax followed by postal delivery |
3.4.11 | After REFD, and where requested | Establish whether a CEEC has been completed and, if necessary, request a CEEC is carried out in accordance with BSCP02. | Registrant | CDCA | Refer to BSCP02 |
|
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.5.1 | At least 20WD11 before the EFD for the change | Provide Meter Technical Details update, proposed change dates, confirm if a CEEC is required and if appropriate Proving Test date in accordance with BSCP02. | MOA Or Registrant | CDCA | BSCP20/4.3, Registration of Meter Technical Details12 Signed by an authorised person, registered as such via BSCP38 Letter with proposed dates (CDCA-I003 Meter Technical Details) | Fax/Post/Email
|
3.5.2 | If appropriate, at least 3WD prior to Proving Test | Confirm that the Metering System has been installed and is operational in accordance with the appropriate Code of Practice. | MOA | CDCA | Refer to BSCP02 | Fax/Post/Email |
3.5.3 | In accordance with BSCP02 | Carry out Proving Tests (if required) | MOA | CDCA | Refer to BSCP02 |
|
3.5.4 | Prior to EFD | Provide Metering Technical Details Report of data entered into system and Registrant to confirm accuracy. | CDCA | Registrant, MOA, NETSO and if appropriate relevant LDSO | Meter Technical Details Report (CDCA-I051). | Fax/Post/Email |
3.5.5 | After REFD, and where required | Carry out CEEC in accordance with BSCP02. | CDCA | Registrant | Refer to BSCP02 |
|
Item | Description |
Associated Meter Id | The Serial Number for the corresponding main Meter. |
Associated Meter Register Id | The Register Id for the corresponding main register. |
Commissioning End to End Check | Where approporiate, an indication that a Commissioning End to End Check is required |
Communications Address | The PSTN/Paknet number associated with the Outstation modem. |
Communications Type | The method by which an Outstation is interrogated, e.g. PSTN, Paknet, etc. |
Energisation Status | A field to indicate whether the Metering System is energised. Options are Energised or De-Energised. |
Maximum Demand (MWh) | The maximum energy value expected to be recorded by the Meter Register. |
Meter Register Id | A two character field which uniquely identifies the Meter Register. |
Meter Register Multiplier | A multiplier which converts the Meter Register cumulative reading into MWh/MVArh values. |
Metering Subsystem Id | An identifier of up to 10 alphanumeric characters which identifies the defined metering point. The ID is usually the circuit/Boundary Point name. This identifier, along with the MSID and the Measurement Quantity ID, is used in the Aggregation Rules as defined in BSCP75. |
Minimum Demand (MWh) | The minimum energy value expected to be recorded by the Meter Register. |
MSID | A unique Metering System identifier supplied by the CRA. |
O/S Channel Multiplier | The constant which has to be applied to the collected cumulative data from the Outstation to convert the values to MWh/MVArh. |
Outstation Id | A unique identifier of up to 20 alphanumeric characters used in the interrogation of the Outstation, the first four digits being the MSID and the remainder any combination of characters (usually the Outstation serial number). |
Outstation Number of Channels | The total number of channels configured in the Outstation. |
Outstation Number of Dials | The maximum number of digits for the cumulative channel readings of the Outstation. |
Outstation Password A | The Code of Practice Level 1 password for the Outstation. |
Outstation Password B | The Code of Practice Level 2 password for the Outstation. |
Outstation Password C | The Code of Practice Level 3 password for the Outstation. |
Outstation PIN | PIN of the Outstation (up to 5 characters). |
Outstation Serial Number | The serial number of the Outstation. |
Outstation Type | The type of Outstation e.g. CM10 |
Previous MSID | Where appropriate the MSID that the Outstation was daisy chained to. |
Previous Outstation Id | Where appropriate, the Id of the Previous Outstation to which the Outstation is daisy chained to. |
Primary/Secondary | Primary indicates Main 1 Outstation, Secondary indicates Main 2 Outstation. |
Pulse Multiplier | The constant which has to be applied to the collected period data from each Outstation Channel to convert the values to MWh/MVArh. |
To: CRA | Date Sent: __________ | |
From: Participant Details | ||
Party ID: ______________________________ | Name of Sender: _________________________ | |
Participation Capacity: ______________________________________________________ | ||
Contact email address: ______________________________________________________ | ||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | |
Name of Authorised Signatory: ______________________________________________________ | ||
Authorised Signature: ______________________ | Password: ___________________ |
Boundary Point/Systems Connection Point/Circuit Name(s): |
| ||
GSP Group ID (if applicable): |
| MSID (if previously registered): |
|
Site Name: |
| ||
Site Address: |
| ||
|
| ||
|
|
Tick if site is an Exemptable Generating Plant |
|
| |
If the Registration is only for the Export from an Exemptable Generating Plant, provide the associated Import SVA MSID(s) |
| ||
LDSO Id13 |
|
MOA Id: |
|
MOA Name: |
|
Tick One |
|
[ ] | New Metering System not currently registered in CMRS or SMRS |
[ ] | Change of Metering System Registrant9 |
[ ] | Metering System transferring from SMRS in accordance with BSCP68 |
To: CDCA | Date Sent: __________ | ||
From: Participant Details | |||
MOA/Registrant ID: __________________________ | Name of Sender: _____________________ | ||
Contact email address: _______________________________________________________________ | |||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | ||
Name of Authorised Signatory: ______________________________________________________ | |||
Authorised Signature: ______________________ | Password: ___________________ | ||
| Tick box if this is a Registration Transfer in accordance with BSCP68 | ||
| Tick box if a Commissioning End to End Check is required14 |
Description of Meter Technical Details to be amended15: |
Data Item | Data Content | Enter ‘*’ if data has changed |
Metering System Id (MSID) |
|
|
MTD Effective From Date |
|
|
Party ID (LDSO)16 |
|
|
Metering Equipment/Service Location |
|
|
Dispensation Reference |
|
|
Dispensation Effective From Date |
|
|
Dispensation Effective To Date |
|
|
Reason for Dispensation |
|
|
Metering Site Contact Name |
|
|
Metering Site Contact Tel Number |
|
|
Metering Site Contact Fax Number |
|
|
Metering Site Address Line 1 |
|
|
Metering Site Address Line 2 |
|
|
Metering Site Address Line 3 |
|
|
Metering Site Address Line 4 |
|
|
Metering Site Post Code |
|
|
Energisation Status (ES) |
|
|
ES Effective From Date |
|
|
ES Effective To Date |
|
|
Data Item | Data Content (Primary Outstation or Main Meter Outstation) | Enter ‘*’ if data has changed | Data Content (Secondary Outstation or Check Meter Outstation) | Enter ‘*’ if data has changed |
MSID |
|
|
|
|
Outstation Id |
|
|
|
|
Outstation Number of Dials |
|
|
|
|
Outstation Type |
|
|
|
|
Outstation Number of Channels |
|
|
|
|
Communications Address |
|
|
|
|
Communication Type |
|
|
|
|
Baud Rate |
|
|
|
|
Previous MSID |
|
|
|
|
Previous Outstation Id |
|
|
|
|
Outstation Serial Number |
|
|
|
|
Outstation Password A |
|
|
|
|
Outstation Password B |
|
|
|
|
Outstation Password C |
|
|
|
|
Outstation PIN |
|
|
|
|
Enter ‘*’ if data has changed | MSID: |
| |||||||
Meter Serial Number17 | Meter Current Rating | Manuf Make & Type | CT Ratio | VT Ratio | System Voltage | No. of Phases | CoP | ||
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
Enter ‘*’ if data has changed | MSID: |
| |||||||
Metering Subsystem ID | Meter Serial No.17
| Main / Check | Meter Register ID | Measurement Quantity ID
(AI, AE, RI, or RE) | No of Register Dials | Meter Register Multiplier | Associated Meter ID 17 | Associated Meter Register ID | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Outstation ID : |
| ||||||||
Enter ‘*’ if data has changed | Channel Number | Meter Serial Number.17 | Meter Register ID | Primary / Secondary (or Main / Check) Outstation
| Pulse Multiplier | O/S Channel Multiplier | Channel Minimum (MWh) | Channel Maximum (MWh) | |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
To: CRA | Date Sent: __________ | |
From: Participant Details | ||
Party ID: ______________________________ | Name of Sender: _________________________ | |
Participation Capacity: ________________________________________________________________ | ||
Contact email address: ________________________________________________________________ | ||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | |
Name of Authorised Signatory: ______________________________________________________ | ||
Authorised Signature: ______________________ | Password: ___________________ |
|
| GSP reference (if applicable) |
|
Boundary Point/Systems Connection Point/Circuit Name: |
| MSID: |
|
Site Name: |
| ||
Site Address: |
| ||
|
| ||
|
|
To: CRA | Date Sent: __________ | |
From: Participant Details | ||
Party ID: ______________________________ | Name of Sender: _________________________ | |
Participation Capacity: ________________________________________________________________ | ||
Contact email address: _______________________________________________________________ | ||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | |
Name of Authorised Signatory: ______________________________________________________ | ||
Authorised Signature: ______________________ | Password: ___________________ |
|
| GSP reference (if applicable) |
|
Boundary Point/Systems Connection Point/Circuit Name: |
| MSID: |
|
Site Name: |
| ||
Site Address: |
| ||
|
| ||
|
|
Tick if site is an Exemptable Generating Plant |
|
| |
If the Registration is only for the Export from an Exemptable Generating Plant, provide the associated Import SVA MSID |
| ||
LDSO Id |
|
Tick One |
|
[ ] | Metering System to be de-commissioned and no longer subject to a BSC registration |
[ ] | Metering System subject to a Registration Transfer to SMRS in accordance with BSCP68 |
To: CRA | Date Sent: __________ | |
From: Participant Details | ||
Party ID: ______________________________ | Name of Sender: _________________________ | |
Participation Capacity: _____________________________________________________________ | ||
Contact email address: _____________________________________________________________ | ||
Our Ref: _______________________________ | Contact Tel. No. _________________________ | |
Name of Authorised Signatory: ______________________________________________________ | ||
Authorised Signature: ______________________ | Password: ___________________ |
MOA Id: |
|
MOA Name |
|
|
| GSP reference (if applicable) |
|
Boundary Point/Systems Connection Point/Circuit Name: |
| MSID: |
|
Site Name: |
| ||
Site Address: |
| ||
|
| ||
|
|
Tick if site is an Exemptable Generating Plant |
|
| |
If the Registration is only for the Export from an Exemptable Generating Plant, provide the associated Import SVA MSID |
| ||
LDSO Id |
|
1 Where the New Metering System is associated with an Exemptable Generating Plant and the Import Meter(s) is Registered in SMRS, refer to process 3.8 ‘Registration of a New Metering System which is associated with Exemptable Generating Plant and where the Import Meter(s) is Registered in SMRS’
2 The timescales in this process may vary when there is a transfer of registration as outlined in BSCP68. In this instance, the timescales in BSCP68 should be followed.
3 Suppliers that have Customers directly connected to the Transmission System can register and de-register the Primary BM Unit associated with that Customer premises within 5WD in limited circumstances in accordance with BSCP15
4 In the event that the Metering System is at a Systems Connection Point between two Distribution Systems, the owners of each Distribution System must agree on the identity of the Registrant using Form BSCP20/4.1
5 Where the Electronic flow CRA-I031 is used to register a Metering System the Registrant will need to confirm manually (email/Fax/Post) whether it is the Metering System owner or that it has obtained the Metering System owners consent
6 Where the Meter Technical Details are not valid the registration will be rejected, and the MOAs or Registrant will be required to resubmit the Meter Technical Details under step 3.1.9.
7 The MOA shall seal the new Metering System in accordance with BSCP06
8 Certificate of disconnection is only required where the circuit being de-registered has been disconnected and there is no potential for electricity transfer. Where the circuit is to be registered in Supplier Metering Registration System (SMRS) for trade purposes the certificate of disconnection is not required but the effective date in SMRS shall be required from Supplier Metering Registration Agent. The Certificate of Disconnection is only required prior to the Effective To date.
9 This process shall not apply where a Metering System is being transferred from one Party to another as part of the CVA Primary BM Unit CoPBLP in BSCP15 which defines the process for transferring the ownership of Metering Systems in such circumstances.
10 If the registration is objected to, the new registration will not be accepted and the current Registrant shall remain until the objection is resolved
11 Where the Metering Equipment needs to be changed due to a fault or an emergency replacement is required a shorter notice period shall be acceptable in accordance with BSCP06. The notice period may also be decreased if agreed upon by all parties concerned.
12 BSCP20/4.3 shall only be submitted as appropriate where there has been a change to the Meter Technical Details
13 For Distribution Systems connected at Distribution System Connection Points the LDSO registering the metering system should enter the LDSO Id of the other Distribution System to which the relevant DSCP connects. This will enable both LDSOs to receive the CDCA-I012. If there are more than two LDSOs then the CDCA-I012 can be requested through flexible reporting, please refer to BSCP41.
14 In the description of Meter Technical Details to be amended, specify which Metering Sub-system IDs (or all) require a CEEC
15 Relevant fields in sections below should also be completed.
16 In the case of an embedded Primary BM Unit this is the Contracted LDSO.
17 Maximum 10 characters. N.B. If the MSN has to be adjusted by agreement between the MOA and CDCA, then both the old and new values must be recorded on this form, which will constitute the only record of the adjustment.