Balancing and Settlement Code BSC PROCEDURE Processing of Manifest Error Claims BSCP14 Version 8.0 Date: 29 March 2019 |
BSC Procedure 14 relating to PROCESSING OF MANIFEST ERROR CLAIMS
Reference is made to the Balancing and Settlement Code and, in particular, to the definition of “BSC Procedure” in Section X, Annex X-1 thereof.
This is BSC Procedure 14, Version 8.0 relating to the processing of Manifest Error Claims.
This BSC Procedure is effective from 29 March 2019.
This BSC Procedure has been approved by the Panel.
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in ELEXON or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
1.0 | 09/08/02 | New Procedure | CP735 | 48/023 |
2.0 | 24/06/03 | Changes for the CVA June 03 Release | CP735 (variation from original CP) | Panel 48/023 |
3.0 | 30/06/04 | Change Proposals for the CVA Programme June 04 Release | CP989 | ISG40/003 |
4.0 | 03/11/04 | Change Proposal for the CVA Programme Nov 04 Release – incorporating peer review comments | CP1032 | TDC58/03 |
5.0 | 23/02/05 | CVA Programme Feb 05 Release | BETTA 6.3 P159 | 78/007 |
6.0 | 28/02/08 | February 08 Release | CP1198 | TDC104/04 |
7.0 | 07/11/13 | November 2013 Release | CP1399 | TDC183/02 |
8.0 | 29/03/19 | 29 March 2019 Standalone Release | P369 | P285/12 |
1.1 Purpose and Scope of the Procedure
This Procedure describes the steps to be taken in order to process a Manifest Error claim, from the initial raising of such a claim by the Lead Party of an affected BM Unit or the National Electricity Transmission System Operator (NETSO), to the final settlement of any payments in relation to the claim.
1.2 Main Users of the Procedure and their Responsibilities
The main users of this procedure are:
(c) BSCCo (specifically the Disputes Secretary)
(d) The BSC Panel (or Panel Committee) and its secretariat
(e) The Balancing Mechanism Reporting Agent (BMRA)
(f) The Settlement Administration Agent (SAA)
(g) The Funds Administration Agent (FAA)
All of the above have a responsibility for fulfilling their obligations under the Balancing and Settlement Code (BSC), either directly or via other contractual arrangements with signatories to the BSC, in respect of ensuring adherence to the Manifest Error claims process.
The key milestones in this procedure are as follows:
(a) Raising and Flagging of Manifest Error claims (claims to be raised within 4 hours of the relevant Bid/Offer Acceptance Time, and notifications of such claims to be made within specified timescales);
(b) Investigation and collation of evidence in respect of Manifest Error claims. Where possible presentation of this information to the Panel/Panel Committee for adjudication and determination of any replacement Bid/Offer prices should be in such time as to allow these prices to be replaced prior to the relevant Initial Settlement Run;
(c) Raising claims for payment of an error compensation amount (as defined under BSC Section Q7.6.2) in relation to Manifest Errors. This must be done within 5 WD of the adjudication made in respect of Manifest Errors as described in paragraph (b) above; and
(d) Effecting payments in relation to Manifest Error claims (e.g. of any error compensation amount and/or fees to be paid by the Raising Party).
1.4 Balancing and Settlement Code Provision
This BSCP should be read in conjunction with the Code. This BSCP has been produced in accordance with the provisions of the Code. In the event of an inconsistency between the provisions of this BSCP and the Code, the provisions of the Code shall prevail.
1.5 Associated BSCP Procedures
The main BSCPs that interface with this procedure are detailed below:
BSCP11 – Trading Disputes.
1.6 Overview of Manifest Error Treatment in the BSC
BSC Section Q7 states that a Manifest Error claim may be raised by the Lead Party of a BM Unit in relation to a single Bid-Offer Pair; or by the NETSO in relation to a single Bid-Offer Acceptance (and, therefore, may be in relation to more than one Bid-Offer Pair). Such a Manifest Error may arise if a Lead Party submits an erroneously priced Bid/Offer in relation to one of its BM Units, and this Bid/Offer is accepted; or, if the NETSO erroneously accepts a Bid/Offer.
A Lead Party may raise a Manifest Error claim by giving notice of such claim to the NETSO. Within 15 minutes of the claim being raised the NETSO notifies BSCCo and the BMRA (although in practice, the NETSO enters the data directly into the BMRA system).
The NETSO may raise a Manifest Error claim by giving notice of such claim to BSCCo (Cc: the affected Lead Party) and the BMRA.
The information placed on the BMRS in relation to the claim includes the identity of the BM Unit concerned, the relevant Settlement Period, and the Bid Price or Offer Price to which the claimed error relates.
Claims must be raised as soon as is reasonably practicable, but in any event within 4 hours of the relevant Bid-Offer Acceptance Time. It is the responsibility of the Raising Party to ensure that the claim is made within this 4-hour time limit. For the purposes of determining whether or not this 4-hour time constraint has been complied with, claims will be deemed to have been received at the time of sending of the relevant email/fax.
Parties raising a Manifest Error claim are required to pay a non-returnable fee of £5000 (or such other amount determined by the Panel under Section Q7.2.3 of the BSC). Where a claim is raised outside of the 4-hour time limit, the Raising Party will still be required to pay this fee.
Manifest Error claims are considered by the Panel (or a Committee appointed by the Panel) in accordance with Section Q7.4 of the BSC. The Panel (or Panel Committee) is responsible for determining whether a Manifest Error occurred, and (in consultation with the NETSO) the replacement price which should be substituted for both the Bid Price and the Offer Price of the erroneously accepted Bid-Offer Pair should the Manifest Error claim be upheld.
The affected Lead Party may also raise a claim for payment of an error compensation amount in relation to the Manifest Error. If such a claim is raised, the Panel (or Panel Committee) determines (broadly speaking):
in the case of an Offer that is the subject of a Manifest Error claim, whether the avoidable costs associated with the change in output arising from the physical response from the affected BM Unit exceeded the amount paid to the Lead Party by virtue of replacing the Offer Price with the replacement Offer Price; or
in the case of a Bid that is the subject of a Manifest Error claim, whether the avoidable costs associated with the change in output arising from the physical response from the affected BM Unit was less than the amount paid by the Lead Party by virtue of replacing the Bid Price with the replacement Bid Price;
and in each case what additional payments are to be made to the affected Lead Party to cover such difference.
In practice, error compensation payments that amount to less than £500 will not be processed.
In the case of a Manifest Error on the part of the NETSO, any error compensation amount payable to the Lead Party shall be recovered from the NETSO. In the case of a Manifest Error on the part of the Lead Party, the error compensation amount shall be recovered from each Trading Party (in accordance with its Party Daily Reallocation Proportions).
2 Acronyms and Definitions
The terms used in this BSCP are defined as follows:
BMRA | Balancing Mechanism Reporting Agent |
BMRS | Balancing Mechanism Reporting Service |
BMU | Balancing Mechanism Unit |
BOA | Bid-Offer Acceptance |
BSC | Balancing & Settlement Code (“the Code”) |
BSCCo | Balancing & Settlement Code Company (i.e. ELEXON) |
DS | Disputes Secretary |
FAA | Funds Administration Agent |
NETSO | National Electricity Transmission System Operator as the holder of the Transmission Licence and any reference to "NETSO", "NGESO", "National Grid Company" or "NGC" in the Code or any Subsidiary Document shall have the same meaning. |
SAA | Settlement Administration Agent |
TDC | Trading Disputes Committee |
WD(s) | Working Day(s) |
Lead Party The BSC Party registered to the BMU that is the subject of the Manifest Error claim.
Raising Party The Party (i.e. the NETSO or the Lead Party) that originally raises the Manifest Error claim.
Affected Party In relation to a particular Manifest Error claim, whichever of the NETSO or the relevant Lead Party did not raise that claim.
From hereon within this procedure, the
Panel Committee to whom the BSC
Panel has delegated authority for its obligations under BSC
Section Q7 (i.e. the TDC) shall be referred to directly.
Similarly the DS shall be referred to directly where that role fulfils in practice the obligations of the
Panel Secretary or
BSCCo as referred to in BSC
Section Q7.
3 Interface and Timetable Information
3.1 Manifest Error Claims raised by the Lead Party
REF. | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1 | As soon as reasonably practicable after becoming aware of the error, but in any event within 4 hours of the relevant Bid-Offer Acceptance Time | Make a claim for a Manifest Error | BSC (Lead) Party for BM Unit under claim | NETSO | Completed Lead Party Manifest Error Claim Form (F14/01) | Email/fax |
3.1.2 | Within 15 minutes of receipt of the claim in 3.1.1 | Validate claim to confirm that it has been raised within the above timescales and notify the Raising Party | NETSO | BSC (Lead) Party | Lead Party Manifest Error Claim Form (F14/01) signed by the NETSO | Email/fax |
3.1.3 | The same timescales as 3.1.2 | Notify BSCCo | NETSO | DS | Lead Party Manifest Error Claim Form (F14/01) signed by the NETSO | Email/fax |
3.1.4 | The same timescales as 3.1.2 | Place Lead Party Manifest Error claim information on BMRS | NETSO | BMRA | Identity of BM Unit, relevant Settlement Period and the Bid Price or Offer Price to which the claim relates | Electronic |
3.2 Manifest Error Claims raised by the NETSO
REF. | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.1 | As soon as is reasonably practicable after becoming aware of the error, but in any event within 4 hours of the relevant Bid-Offer Acceptance time | Make a claim for a Manifest Error, | NETSO | DS, : BSC (Lead) Party for BM Unit under claim | Completed NETSO Manifest Error Claim Form (F14/02) In the event of a BOA number not being generated (e.g. when a BOA is issued via telephone during an outage), the NETSO should provide details of the relevant BOA as required under Manifest Error Claim Form (F14/02). | Email/fax |
3.2.2 | Within 15 minutes of 3.2.1 | Place the NETSO Manifest Error claim information on BMRS | NETSO | BMRA | Identity of BM Unit, relevant Settlement Period(s) and the Bid Price(s) or Offer Price(s) to which the claim relates | Electronic |
3.2.3 | The same timescales as 3.2.2 | Confirm receipt | BSC (Lead) Party | NETSO, Cc: DS | The NETSO Manifest Error Claim Form (F14/02) signed by the Lead Party | Email/fax |
3.3 Investigation and Adjudication of Manifest Error Claims
REF. | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1 | On the same Working Day of receipt of the Manifest Error Claim Form received in accordance with 3.1.3 or 3.2.1. | Validate the Manifest Error Claim Form to confirm that it was originally raised within 4 hours of the relevant Bid-Offer Acceptance Time | DS | | Lead Party Manifest Error Claim Form (F14/01) or the NETSO Manifest Error Claim Form (F14/02) | Internal process |
3.3.2 | On the same WD as 3.3.1 | Notify Receipt of Manifest Error Claim Form at the DS, issuing log number If a manifest Error Claim request information from the Raising Party in accordance with Section Q7.4.3(a)(i) of the BSC | DS | BSC (Lead) Party or the NETSO (whichever is the Raising Party) | Notification of Receipt of Manifest Error Claim Form by the DS (F14/03) In the event of a BOA number not being generated (e.g. when a BOA is issued via telephone during an outage), the Disputes Secretary should provide details of the relevant BOA as required under Notification of Manifest Error Claim Form (F14/03). | Email/fax |
3.3.3 | On the same WD as 3.3.1 | Consider if there is a scheduled TDC meeting prior to the Initial Settlement Run (and in such time as to allow sufficient information to be collated for the TDC to consider the Manifest Error). If yes, include Manifest Error claim as agenda item. If no, notify TDC of a requirement to meet, or participate in a telephone meeting, in order to consider the Manifest Error claim | DS | TDC Chairman, TDC Secretary, TDC Members (via TDC Secretary) | TDC meeting dates Settlement Calendar | Verbal/email |
3.3.4 | Within 5 WD of 3.3.2 | Provide the evidence and supporting information requested under 3.3.2 | BSC (Lead) Party or NETSO | DS | Information required under Section Q7.4.3(a)(i) of the BSC | Email/fax |
3.3.5 | Within 1 WD of 3.3.4 | Forward response provided by the Raising Party in 3.3.4 above to the Affected Party and Request information from the NETSO in accordance with Section Q7.5.2(a) of the BSC | DS | Affected Party NETSO | Information required under Section Q7.4.3(a)(i) of the BSC Information required under Section Q7.5.2(a) of the BSC | Email/fax |
3.3.6 | Within 3 WD of 3.3.5 | In accordance with Section Q7.4.3(a)(ii) of the BSC, provide comments in response to the information submitted by the Raising Party under 3.3.4 above Provide information requested under 3.3.5 above in accordance with Section Q7.5.2(a) of the BSC | Affected Party NETSO | DS | Agreement/disagreement to the Manifest Error claim details submitted under 3.3.4 above Information required under Section Q7.5.2(a) of the BSC | Email/fax |
3.3.7 | At least 2 WD prior to the Initial Settlement Run | Reach consensus or a majority decision on whether (or not) the Manifest Error claim is valid Or If a Manifest Error claim is valid reach consensus or a majority decision on whether (or not) a Manifest Error occurred and if so, the replacement price(s) for the Error Bid/Offer Pair(s). Instruct TDC Secretary to raise the Manifest Error Finding Form Or Defer decision and instruct DS (via TDC Secretary) to seek further information under 3.3.2 or 3.3.5 above, and continue as from 3.3.2 or from 3.3.5 (calling emergency TDC meeting if required) | TDC | TDC Secretary DS (via TDC Secretary) | Determination of TDC Details of further information required | At TDC meeting |
3.3.8 | On the same WD as 3.3.7 | Notify BSCCo Finance Department to invoice Raising Party for Manifest Error claim fee in accordance with BSC Section Q7.4.3 (g) | DS | BSCCo | Raising Party, Manifest Error Log Number, Settlement Date/Period, Amount (£) | Email |
3.3.9 | Within 1 WD of 3.3.8 | Complete TDC Finding Form and request signature of TDC Chair | TDC Secretary | TDC Chair | TDC Manifest Error Finding Form (F14/04) | In person/fax |
3.3.10 | Within 1 WD of 3.3.8 | Sign TDC Finding Form and return to TDC Secretary | TDC Chair | TDC Secretary | Signed TDC Manifest Error Finding Form (F14/04) | In person/fax/ email |
3.3.11 | Within 1 WD of 3.3.8 where appropriate | Communicate TDC decision | TDC Secretary | DS, NETSO, BSC (Lead) Party and all BSC Parties | Signed TDC Manifest Error Finding Form (F14/04) to DS, Raising and Affected Party ELEXON Circular to all other BSC Parties | Email/fax |
3.3.12 | By 12:00 on the working day before the Initial Settlement Run | Instruct the SAA to amend the Offer Price and Bid Price of the Error Bid-Offer Pair(s), to equal the replacement prices as determined by TDC | DS | SAA | Signed Instruction to Resolve Manifest Error Form (F14/05) | Email/fax |
3.3.13 | Within 1 WD of 3.3.12 | Provide confirmation that replacement prices have been/will be included in the appropriate Initial Settlement Run | SAA | DS | Confirmation that prices have been/will be included in the appropriate Initial Settlement Run, which is achieved by the SAA completing and returning the Instruction to Resolve Manifest Error form (F14/05). | Verbal agreement backed up with subsequent email |
3.4 Claims for Payment of an Error Compensation Amount
REF. | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1 | Within 5 WD of 3.3.11 | If required submit claim for payment of error compensation amount (“compensation claim”) | BSC (Lead) Party | DS | Authorised Claim for Payment of Error Compensation Amount Form (F14/06) plus supporting documentation required in accordance with Section Q7.6.4 (and G2.2.1) of the BSC | Email/fax |
3.4.2 | Within 1 WD of 3.4.1. | Validate compensation claim for authorised signature and the timescales detailed in 3.4.1 | DS | | Claim for Payment of Error Compensation Amount Form (F14/06). | Internal process |
3.4.3 | Within 1 WD of 3.4.1 | Acknowledge compensation claim | DS | BSC (Lead) Party | Acknowledgement of Manifest Error Compensation Claim Form (F14/07) | Email/fax |
3.4.4 | Within 1 WD of 3.4.1 if appropriate | Where the original Manifest Error claim was raised by the NETSO in accordance with 3.2.1, notify the NETSO that a compensation claim has been raised | DS | NETSO | Acknowledgement of Manifest Error Compensation Claim Form (F14/07) | Email/fax |
3.4.5 | For the next appropriate TDC meeting | Place compensation claim on meeting agenda | DS | TDC Secretary, TDC Chairman | Claiming Party, Manifest Error Log Number | Internal process |
3.4.6 | Next appropriate TDC meeting | Submit claim | DS | TDC | Details of compensation claim and supporting documentation submitted under 3.4.1. TDC Manifest Error Finding Form (F14/04) | In person |
3.4.7 | TDC meeting | Consider claim and determine: 1) The values in accordance with BSC Section Q7.6.3; 2) The Avoidable Costs in accordance with BSC Section G2.1.2; 3) Whether any adjustments or reconciliation should be made in relation to the associated Ad-Hoc Trading Charges in accordance with BSC Section G1.2.1(b). | TDC | | TDC determination | At TDC meeting |
3.4.8 | Within 5 WD of 3.4.7 | Communicate decision of TDC | TDC Chairman via the TDC Secretary | DS, BSC (Lead) Party, NETSO, Trading Parties | Signed TDC Finding Form for Compensation Claims arising out of Manifest Errors (F14/08) | Email/fax |
3.4.9 | Within 10 WD of 3.4.8 | Calculate error compensation amount in accordance with BSC Section Q7.6.2 and notify BSC (Lead) Party | DS | BSC (Lead) Party | Error compensation amount | Email/fax |
3.4.10 | Within 5 WD of 3.4.9 | Finalise Ad Hoc Trading Charge details with BSCCo, and complete Form F14/09 | DS | BSCCo | Ad Hoc Trading Charge Payment Authorisation Form (F14/09) | Internal BSCCo process |
3.4.11 | Within 1 WD of 3.4.10 | Obtain signature of TDC Chair to authorise payment of Ad Hoc Trading Charge | DS | TDC Chair | Ad Hoc Trading Charge Payment Authorisation Form (F14/09) | In person/fax |
3.4.12 | Within 1 WD of 3.4.11 | Instruct FAA to action Ad-Hoc Trading Charge in accordance with BSC Section Q7.6.5 | DS | FAA | Ad Hoc Trading Charge Payment Authorisation Form (F14/09) | Email/fax |
3.4.13 | As required by the Payment Authorisation Form | Implement the instructions in the Payment Authorisation Form and issue notification to affected Parties and the DS | FAA | Affected Parties and DS | Advice note and Ad Hoc Trading Charge Payment Authorisation Form (F14/09) | Letter |
4.1 Lead Party Manifest Error Claim Form (F14/01)
Lead Party Manifest Error Claim Form
For completion by the Raising Party
Fax: _________________________ Email: ______________________________________
From: Company Name ____________________________________________________________
Location __________________________________________________________________
Fax: _________________________ Email: ______________________________________
Date of Claim: ____________________________
Time of Claim: ____________________
Claim Details: * Delete as appropriate
Affected BM Unit | |
BSC (Lead) Party of BMU | |
Affected Settlement Day | |
Affected Settlement Period | |
Affected Bid-Offer Pair Number | |
Affected Bid/Offer* Price | |
Relevant Bid-Offer Acceptance Time(s) | |
Relevant Bid-Offer Acceptance Number(s) | |
Additional Relevant Information: ______________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Manifest Error Claim Made by (name): ____________________Signature: _____________________
For completion by the NETSO
Received By (signature): ____________________________________
Date and Time of Receipt: ________________________________ Valid: Y/N
Claims (where notice has been given in accordance with this BSCP and Section Q7.2 of the Code) should be notified to the DS, and where the claim is deemed valid a notice placed on the BMRS within 15 minutes of receipt.
DS Contact details: Fax _________________________ Email________________________________
DS Log Number: ___________________
Date/Time received at DS: ________________________
4.2 NETSO Manifest Error Claim Form (F14/02)
NETSO Manifest Error Claim Form
For completion by the NETSO
Fax: _________________________ Email: _______________________________________
Cc: Company Name of BSC (Lead) Party ____________________________________________
Location ___________________________________________________________________
Fax: _________________________ Email: _______________________________________
From: NETSO Control Centre
Fax: _________________________ Email: _______________________________________
Date of Claim: ____________________________
Time of Claim: ____________________
Claim Details: * Delete as appropriate
Error Acceptance Volume Pairs:
(complete if BOA number unavailable)
Affected BM Unit | | | From | From | To | To |
BSC (Lead) Party of BMU | | | MW | Time | MW | Time |
Affected Settlement Day | | | | | | |
Affected Settlement Period(s) | | | | | | |
Affected Bid-Offer Pair Number(s) | | | | | | |
Affected Bid/Offer* Price(s) | | | | | | |
Bid/Offer* Price 1 | | | | | | |
Bid/Offer* Price 2 | | | | | | |
Bid/Offer* Price 3 | | | | | | |
Bid/Offer* Price 4 | | | | | | |
Bid/Offer* Price 5 | | | | | | |
Relevant Bid-Offer Acceptance Time | | | | | | |
Relevant Bid-Offer Acceptance Number | | | | | | |
Additional Relevant Information: ______________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Manifest Error Claim Made by (name): ____________________Signature: ___________________
For completion by the Receiving (Lead) Party
(To be returned to the NETSO : DS, within 15 minutes of receipt.)
Received By (signature): ____________________________________
Date and Time of Receipt: ________________________________
DS Log Number: ___________________
Date/Time Claim initially received at DS: ________________________ Valid: Y/N
4.3 Notification of Receipt of Manifest Error Claim Form by the DS (F14/03)
Notification of Receipt of Manifest Error Claim Form by the DS
To: 1) (name) ___________________________________________
Fax: _________________________ Email: ____________________________________
2) (name) ___________________________________________
Lead Party Company Name _________________________________________________
Fax: _________________________ Email: _____________________________________
Date: ____________________________
Claim Details: * Delete as appropriate
Error Acceptance Volume Pairs:
(complete if BOA number unavailable)
Affected BM Unit | | | From | From | To | To |
BSC (Lead) Party of BMU | | | MW | Time | MW | Time |
Affected Settlement Day(s) | | | | | | |
Affected Settlement Period(s) | | | | | | |
Affected Bid-Offer Pair Number(s) | | | | | | |
Affected Bid/Offer* Price(s) | | | | | | |
Bid/Offer* Price 1 | | | | | | |
Bid/Offer* Price 2 | | | | | | |
Bid/Offer* Price 3 | | | | | | |
Bid/Offer* Price 4 | | | | | | |
Bid/Offer* Price 5 | | | | | | |
Relevant Bid-Offer Acceptance Time | | | | | | |
Relevant Bid-Offer Acceptance Number | | | | | | |
The claim raised by (company) ____________________________ on (date) __________________ at (time) ____________ has/has not* been raised within 4 hours of the Bid-Offer Acceptance Time and has therefore been determined to be Valid/Invalid* by the Disputes Secretary for raising a claim under the Balancing and Settlement Code (BSC). * DS to delete as appropriate
Your Manifest Error Log number is: ______________________________
(To be quoted in all subsequent correspondence)
For valid claims the following information is now requested:
1. Supporting information from the Raising Party in accordance with section 3.3.2 of this procedure
2. Information from the NETSO in accordance with section 3.3.2 of this procedure
Deadline Date for reply: _________________________________________
If you require any further information on this Manifest Error claim please contact: ________________
Telephone: __________________ Fax: __________________ Email: __________________________
DS Log Number: ___________________
Date Initial Settlement Run due to be completed: ________________________
4.4 TDC Manifest Error Finding Form (F14/04)
TDC Manifest Error Finding Form
For completion by the TDC Secretary
Copy To: _________________________________________________________________________
Raising and Affected Party
Email/fax: _______________________________________________________________________
From: Trading Disputes Committee
TDC Meeting Number: ________________________ Date: ___________________________
Manifest Error Log Number(s) For Settlement Day and Time Period
___________________________ ____________________________________
The Trading Dispute Committee Findings are:
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Signed: _____________________________________ Date: ________________________
Chairman, Trading Disputes Committee
4.5 Instruction to Resolve Manifest Error (F14/05)
Instruction to Resolve Manifest Error
Copy To: _________________________________________________________________________
Email/fax: _______________________________________________________________________
Date: _______________________________
DS Log Number of Manifest Error: ____________________
In accordance with the Trading Disputes Committee ruling dated _______________ please update the erroneously accepted Bid/Offer price(s) with the replacement Bid/Offer price(s) outlined in the table below:
Affected BM Unit | Settlement Day | Settlement Period | Erroneous Bid/Offer Pair Number | Erroneous Bid/Offer* Volume (MWh) | Erroneous Bid/Offer* Price (£/MWh) | Replacement Bid Price (£/MWh) | Replacement Offer Price (£/MWh) |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
| | | | | | | |
Additional Instructions/Notes: ____________________________________________________________________________________________________________________________________________________________________
__________________________________________________________________________________
Signature of TDC Chair: ______________________________________________________________
For completion by the SAA
I confirm that the above information has been included in the Initial Settlement Run for Settlement Date _______________ and that this run was/is due to be executed on Calendar Date _________________.
Signed: _________________________________ Print Name: ________________________________
Date: ___________________________________
4.6 Claim for Payment of Error Compensation Amount (F14/06)
Claim for Payment of Error Compensation Amount
For completion by the BSC (Lead) Party making claim
Fax: _________________________ Email: _______________________________________
From: Name _____________________________________________________________________
Authorised Signature: ________________________________________________________________
Company: _________________________________________________________________________
Location: __________________________________________________________________________
Telephone: __________________ Fax: __________________ Email: __________________________
Date Submitted: ________________________________
Manifest Error Log Number: ___________________________________________
To be quoted in all correspondence
BM Unit: __________________________
Settlement Date: ___________________________ Period: ______________________
Claimed net quantity change (in MWh) in Export or Import: _____________________
This value shall be negative where it represents an increase in net Imports or a reduction in net Exports, and otherwise positive.
Supporting Information (or attach separately): ____________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Avoidable Costs (in £): _______________________________________
Explanation / Supporting Information (or attach separately): _________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Error Compensation Amount: ______________________________________
DS Log Number: ___________________ Date received at DS: _____________________
Date of Meeting at which TDC heard Manifest Error Claim: __________________ Valid: Y/N
4.7 Acknowledgement of Manifest Error Compensation Claim (F14/07)
Acknowledgement of Manifest Error Compensation Claim
To: (name) ___________________________________________
Lead Party Company Name ____________________________________________
Fax: _________________________ Email: _______________________________
*Delete if not appropriate (only required where the original Manifest Error claim was raised by the NETSO using Form F14/02)
Fax: _________________________ Email: _______________________________
Date: ____________________________
Your compensation claim raised on (date) _________________________ relating to Manifest Error Log Number _____________, BM Unit ______________, Settlement Date _____________________ and Period _________ has/has not* been raised within the timescales defined within this BSCP and Section Q7.6.1 of the Code and has therefore been determined to be Valid/Invalid* by the Disputes Secretary.
* DS to delete as appropriate
Manifest Error claim raised by (Company) __________________________
This is the raising party of the original Manifest Error claim via form F14/01 or F14/02
All valid claims are submitted to the TDC for determination and must be supported with the information detailed in the BSC Sections Q7.6.4 (and G2.2.1). Should you wish to make any further submissions, please provide to the DS by (date) _______________________.
If you require any further information on this compensation claim please contact: _______________
Telephone: __________________ Fax: __________________ Email: ________________________
DS Log Number: ___________________
TDC meeting held on Manifest Error: Y/N TDC Meeting Date at which compensation claim will be heard: ____________________
4.8 TDC Finding Form for Compensation Claims arising out of Manifest Errors (F14/08)
TDC Finding Form for Compensation Claims arising out of Manifest Errors
For completion by TDC Secretary
Copy To: _________________________________________________________________________
Email/fax: _______________________________________________________________________
TDC Meeting Number: ________________________ Date: ___________________________
Manifest Error Log Number(s) For Settlement Day and Time Period
___________________________ ____________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Signed: _____________________________________ Date: ________________________
Chairman, Trading Disputes Committee
Signed: _____________________________________ Date: ________________________
4.9 Ad Hoc Trading Charge Payment Authorisation Form (F14/09)
Ad Hoc Trading Charge Payment Authorisation Form
For completion by the TDC Secretary
Email/fax: _______________________________________________________________________
Copy To: _________________________________________________________________________
BSC (Lead) Party making claim:
Manifest Error Log Number | Settlement Date | Value of Ad Hoc Trading Charge Payment (Net of Interest) £ |
| | |
Reason for Ad Hoc Trading Charge: ____________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
Proposed Date for Recovery (in accordance with BSC Section N 6.9.1 (b)): _____________________
__________________________________________________________________________________
Method of Recovery: From ______________________________________
Method of Recompense: To ________________________________________
RECOMMENDED BY: APPROVED BY:
Signed: ________________________________ Signed: __________________________
(TDC Chairman) (BSCCo Chief Executive)
Date: ________________________________ Date: __________________________
4.10 Format of BMRS Lead Party Manifest Error Claim Notification
The following states the form of the text that the NETSO should enter as a free-text message into the BMRS System:
“A Manifest Error claim has been raised by [insert Lead party name] in relation to an accepted [Bid/Offer*] for BM Unit [insert BM Unit ID] for Settlement Period(s) [insert affected Settlement Period(s)] on [insert affected Settlement Day]. The affected [Bid/Offer*] price is [insert relevant price].”
4.11 Format of BMRS NETSO Manifest Error Claim Notification
The following states the form of the text that the NETSO should enter as a free-text message into the BMRS System:
“A Manifest Error claim has been raised by the NETSO in relation to an accepted [Bid/Offer*] for BM Unit [insert BM Unit ID] for Settlement Period(s) [insert affected Settlement Period(s)] on [insert affected Settlement Day]. The affected [Bid/Offer*] price is [insert relevant price].”
4.12 Manifest Error Claim Fee
A fee of £5,000 (or the value determined by the Panel under Section Q7.2.3 of the BSC) shall be payable to BSCCo for all valid Manifest Error claims received by the DS. This fee, which shall not be reimbursed in any circumstances, shall be invoiced by BSCCo in accordance with Section Q7.4.3(g).
4.13 Withdrawing a Manifest Error Claim or Claim for Payment of Error Compensation Amount
Withdrawal/closure requests will only be accepted by the DS where these are made in writing by an Authorised Signatory and the request is received prior to the claim being submitted to the TDC for consideration. Withdrawal requests do not impact on the fee payable under 4.12 above.
All withdrawal/closure requests for Manifest Error claims submitted to the DS will be reported to the TDC at its next scheduled meeting. The TDC may still wish to consider the Manifest Error claim.
4.14 Determining Replacement Prices for Utilisation in the Correction of Manifest Errors
In determining the replacement prices to be used in the processing of a Manifest Error, a number of steps need to be followed:
Step 1: Identify the acceptance quantities for which replacement Offers and/or Bids need to be determined.
Step 2: Identify the replacement Offers and Bids to use.
Step 3: Determine the weighted average replacement price.
The approach to be followed differs depending upon the circumstances of the Manifest Error. If, for example, the Acceptance associated with the Manifest Error was necessarily issued to a BM Unit with particular dynamic characteristics (for example because energy was needed in short timescales to control system frequency) then the detailed dynamics of possible replacement Offers and Bids should be given more consideration in the identification of possible replacement Offers and Bids. In other cases, a more approximate simplified approach should be adopted which it is intended will reduce the administrative burden of processing the Manifest Error. The flow diagram overleaf identifies the main steps involved.
Step 1: Identifying Acceptance Quantities for Replacement
Under the BSC, a particular Acceptance may result in the acceptance of one or more Bids and/or Offers. Furthermore, depending upon the nature of any Manifest Error, one or more of the Bids and/or Offers accepted as a result of an Acceptance relating to the Manifest Error may form part of an Error Bid/Offer Pair.
Step 1a – Identification of Accepted Bid Volume and/or Accepted Offer Volume
In order to determine the appropriate replacement price for a particular Error Bid/Offer Pair, the quantity of accepted Offers and/or Bids that need to be “replaced” should first be determined. This quantity is initially determined as a power profile of the relevant Accepted Offer Volume and/or Accepted Bid Volume associated with each Error Bid/Offer Pair.
For more straightforward Manifest Errors, the erroneous Accepted Offer Volume and/or Accepted Bid Volume associated with the Error Bid/Offer Pair may be determined simply as being equal to the Accepted Bid Volume and/or Accepted Offer Volume for each Error Bid/Offer Pair associated with the relevant Acceptance. There are, however, a number of more complex situations that may arise in which the determination of these quantities is less straightforward. The more complex scenarios considered in this procedure are as follows:
1) Two Acceptances, each resulting in the acceptance of a particular Bid-Offer Pair. One Acceptance being entirely erroneous, the other entirely correct;
2) Two Acceptances each resulting in the acceptance of a particular Bid-Offer Pair, both Acceptances being erroneous;
3) A single Acceptance accepting both one Bid-Offer Pair correctly and a different Bid-Offer Pair in the same Settlement Period erroneously;
4) A single Acceptance accepting the same part (i.e. Offer part or Bid Part) of a single Bid-Offer Pair, partly correctly and partly erroneously.
5) A single Acceptance accepting part of the Offer of a Bid-Offer Pair correctly, and part of the Bid incorrectly.
The approach to be adopted in each of these cases is discussed in turn below:
1) In the first case, Section Q7.5.2(a)(ii) of the BSC implies that the “correct” acceptance should be disregarded for the purposes of the determination of the replacement quantities. This is because Q7.5.2(a)(ii) refers effectively only to the identification of other Bid/Offer Pairs which would have been accepted by the NETSO if it had not accepted (by the relevant Acceptance). Hence, for example, if Acceptance k erroneously accepts 5 units of Bid-Offer Pair n, and Acceptance m correctly accepts 6 units of Bid-Offer Pair n, the quantity of replacement Offers or Bids is 5 units.
2) In the case where two Manifest Errors affect a single Bid-Offer Pair, the application of the rules in the BSC would appear to be ambiguous. It is not clear whether based on a strict reading of the BSC, the replacement price to be used should be based on the first or second Manifest Error.
3) In case 3, those quantities of other Bid-Offer Pairs correctly accepted by an Acceptance, which has also erroneously accepted part of a different Bid-Offer Pair, may be disregarded for the purposes of processing the Manifest Error claim. Q7.5.2(a)(ii) includes the words: “…if it had not accepted (by the relevant Acceptance) the Error Bid/Offer Pair”. This only requires consideration of the acceptance insofar as it relates to of the Error Bid Offer Pair(s), and not to other Bid-Offer Pairs.
4) In case, 4, it is assumed that a single Acceptance has both correctly accepted part of a particular Offer (or Bid) and erroneously accepted part of the same Offer (or Bid). For example this may arise if the NETSO wished to accept an Offer for 10 minutes, but in practice did so for 20. In this case, because the entire Bid-Offer Pair is an Error Bid-Offer Pair, then again from Q7.5.2(a)(ii), it would be appropriate to determine a replacement price taking into account the entire quantity of accepted Offer (or Bid) from that Bid-Offer Pair (i.e. including that part of the Offer (or Bid) that was correctly accepted).
5) In case 5, it is assumed that a single Acceptance results in the erroneous Acceptance of an Offer from a particular Bid-Offer Pair, and partly in the correct Acceptance of a Bid from the same Bid-Offer Pair. Given that both the Bid and the Offer form part of the Bid-Offer Pair, this case is very similar to case 4 and based upon the an interpretation of the existing BSC rules, the correctly accepted Bid (or Offer) quantity would be taken into account in determining the replacement price.
Whilst some consideration has been given to ensuring the above list covers the set of possible scenarios, it is possible that there may be other scenarios that may arise that have not been identified. To the extent that this is the case, then it would be necessary to determine the replacement quantities based upon consideration of the detailed circumstances of each particular case.
Step 1b – Conversion of Accepted Bid Volume and/or Accepted Offer Volume into MWh replacement quantity
The approach used in determining the replacement price should, by default, but not in all cases, adopt a simplified approach in order to assist in the determination of the alternative Bids and Offers that were “available” to the NETSO. Under the simplified approach the Accepted Bid Volumes and Accepted Offer Volumes associated with a particular Error Bid/Offer Pair would be integrated over the Settlement Period in order to determine a single MWh new error quantity.
This simplified approach should not be adopted where spot MW values that adequately represent the system requirements at the time of the erroneous Bid-Offer Acceptance could not have been met by the BM Unit(s) indicated by the simplified approach.
Step 2: Identifying Replacement Bids and Offers
In determining the replacement Offer and Bids available to the NETSO, the following process should be followed:
If Step 1b) above has been followed then:
Step 2a) - convert the MWh quantity of energy determined under Step 1b) to a power equivalent (by dividing by ½ an hour).
Step 2b) - based on a subset of dynamic and other data (specifically, only MIL, MEL, run-up and run-down rates, Notice to Deviate from Zero, Notice to Deliver Offers/Bids and FPN - taking into account other acceptances), identify the quantity of power that could have been delivered by other Offers (or, if the power value is negative, then Bids) at the end of each relevant Settlement Period, assuming that the acceptance was issued at the Bid-Offer Acceptance time of the Acceptance associated with the Manifest Error. This delivers a list of alternative Offers or Bids from other BM Units, and the quantity of replacement MW available at the end of each relevant Settlement Period.
Step 2c) - identify which of the replacement Offers or Bids would have been chosen in accordance with Q7.5.2(a)(ii). In following this step, it is proposed that unless the Panel (in consultation with the NETSO) reasonably believes that (i) some or all of those Offer or Bids would not have been chosen, (ii) certain quantities of other Offer or Bids would have been chosen, or (iii) the aggregate quantity of the replacement Offers or Bids determined at the end of the Settlement Period does not reasonably reflect the quantity required to be determined, then Bids and Offers would be selected from those determined to be available in price merit order. This means that for Offers, the cheapest would be selected such that the aggregate MW quantity of Offers is equal to the MW quantity of the Manifest Error identified in Step 2a. In the case of Bids, the most expensive Bids are identified. If any of the criteria (i-iii) are met, then the Panel (in consultation with the NETSO) will determine the quantities of those Offers and Bids that are available, and/or the replacement quantity to be selected.
If Step 1b) above has not been followed then:
Step 2d) - Identify which of the replacement Offers or Bids would have been chosen in accordance with Q7.5.2(a)(ii).
It is recognised that this is a subjective process that will require detailed consideration of the exact nature of the particular Manifest Error in question. It is noted that it may not always be appropriate to identify replacement MW to match the entire power profile identified in Step 1a), and indeed in some cases the exact power profile may be exceeded.
It is not considered practicable to further document the selection process at this stage. Instead, it is envisaged that a “case law” approach to selection of replacement prices in such circumstances should be permitted to emerge.
Step 3: Determining Replacement Prices
Determine the replacement price based upon the MW (or MWh) weighted average of the replacement Offers or Bids available identified.
The following example is included to further explain the approach proposed if Step 1b) is taken. The following diagram shows the power profile of a Manifest Error relative to FPN over two Settlement Periods.
The erroneous acceptance results in the acceptance of both Bids and Offers in each Settlement Period. There is a net overall quantity of accepted Offers in SP1 and of Bids in SP2. For the purposes of this example, these are assumed to be +10MWh and –5MWh respectively.
These net energy quantities are converted to a power value equivalent of +20MW and –10MW for Settlement Periods SP1 and SP2 respectively.
For SP1, a list of potentially available Offers is constructed, identifying the quantity of additional power (arising from a reduction in demand or increase in generation) that BM Units participating in the balancing mechanism could deliver. In constructing this list a subset of dynamic and other data is used (as described above). For the purposes of this example, the following replacement Offers are assumed to be available:
BM Unit Power Level Price £/MWh
BMU1 8MW 5MW@ £20/MWh, 3MW@ £50/MWh
The NETSO further identifies that BMU2 was not available because it was operating behind an export constraint. Hence, the replacement Offers selected are as follows:
Hence, the MW weighted average replacement price is £25/MWh.
A similar exercise is conducted by selecting replacement Bids in SP2.