Production of annual Meter reading schedule.
Take Meter readings and carry out a visual inspection of the Metering Equipment.
Performing MAR and providing results to the Registrants.
Informing BSCCo of MAR result where there is an error.
Responsible for obtaining the Meter readings.
Witnessing Meter readings, if in attendance.
Raising disputes as appropriate as a result of MAR discrepancy.
As Registrant
Annual notification of the Meter reading schedule for a 12 month period to the Registrant and Meter Operator Agent (MOA) of the Metering Equipment and the BSCCo.
Taking Meter readings according to the Meter reading schedule.
BSCCo | Balancing and Settlement Code Company |
BST | British Summer Time |
CDCA | Central Data Collection Agent |
CT | Current Transformer |
LDSO | Licensed Distribution System Operator |
LIU | Local Interrogation Unit |
MAR | Meter Advance Reconciliation |
MOA | Meter Operator Agent |
MSID | Metering System Identifier |
MSSY | Metering Sub System Identifier |
SVA | Supplier Volume Allocation |
UTC | Co-ordinated Universal Time |
VT | Voltage Transformer |
WD | Working Day |
For Meters with integral Outstations that provide a cumulative reading of the prime Meter register equivalent to the total consumption or production of that Meter, the CDCA shall carry out an in-house daily Meter Advance Reconciliation (MAR) using the period half hour data and associated cumulative register data collected as part of the routine dial up process. The tolerance for this MAR shall be ±5%1. The CDCA shall schedule a site visit to carry out an MAR and visual check every 12 months.
For Meters with integral Outstations that do not provide a cumulative reading of the prime Meter register equivalent to the total consumption or production of that Meter, the CDCA shall schedule a site visit to carry out an MAR and visual check every 6 months.
For Meters with external Outstations, the CDCA shall schedule a site visit to carry out an MAR and visual check every 3 months.
For Meters with external Outstations which are located Offshore at Offshore Power Park Modules, the CDCA shall schedule an initial site visit to carry out a MAR and visual check within 3 months of the Metering Equipment becoming registered in CMRS. Thereafter site visits will be conducted every 12 months.
REF | WHEN | ACTION | FROM | TO | INPUT INFORMATION REQUIRED | MEDIUM |
3.1.1 | Annually | Notification of the Meter reading schedule for a 12 month period. | CDCA | Registrant MOA | Date and site(s) for Meter reading | Fax / Post / Email |
3.1.2 | At least 5 WD before the Meter reading | Confirmation of particular Meter reading(s) arrangements. | CDCA | Registrant MOA | Date and site(s) for Meter reading | Fax / Post / Email |
3.1.3 | As scheduled. | Record the physical Meter reading(s), date and time in the presence of the Registrant’s representative, if attending. Where the Meter has an integral outstation and the facility for electronic local interrogation, the CDCA may utilise a LIU for this purpose. | CDCA |
| Signed record of Universal Meter Reading Sheet (BSCP05/4.1) Or LIU data BSCP05/4.1 requires any witness who signs to be an authorised person. An authorised person must be registered under BSCP38 by the Party. |
|
3.1.4 | At the time of the Meter reading | Carry out a visual inspection of the Metering Equipment as specified in Appendix 4.3 and complete Form BSCP05/4.3. | CDCA |
| BSCP05/4.3 CDCA Metering System Visual Inspection |
|
3.1.5 | Within 5 WD of Meter reading | Copy the completed Meter reading sheets to the Registrant and MOA and retain originals. | CDCA | Registrant(s) MOA | Signed record of Universal Meter Reading Sheet (BSCP05/4.1) | Post/ Electronic |
3.1.6 | Within 5 WD of Meter reading | Copy the completed CDCA Metering System Status Report to BSCCo. | CDCA | BSCCo | BSCP05/4.3 CDCA Metering System Visual Inspection | Fax/ Post/ Email |
3.1.7 | Within 5 WD of Meter reading | Notify Registrant and MOA of any metering defects that they should remedy. | CDCA | Registrant MOA | Details of any metering defects as a result of the visual inspection carried out at the time of the Meter reading. | Fax/ Post/ Email |
3.1.8 | Within 5 WD of Meter reading | Perform MAR | CDCA |
| BSCP05/4.1, Universal Meter Reading Sheet | Internal Process |
3.1.9 | Within 15 WD of Meter reading | Notify the Registrant and MOA of the MAR result(s) and request an explanation of discrepancies greater than ±0.1%. | CDCA | Registrant(s)2, MOA (and if appropriate LDSO) | MAR result and explanation of discrepancy, as appropriate. | Fax/ Post/ Email |
3.1.10 | Within 5 WD of 3.1.9 | Provide explanation of any discrepancies greater than ±0.1%. | MOA | CDCA | Explanation of any discrepancies greater than ±0.1%. | Fax/ Post/ Email |
3.1.11 | Within 15 WD of Meter reading | Notify the BSCCo of the MAR results where there is a discrepancy greater than ±0.1% | CDCA | BSCCo | MAR error result | Fax/ Post/ Email |
3.1.12 | Within 20 WD of Meter reading. | Discuss possible erroneous values resolving, if possible, any apparent discrepancy. | MOA | CDCA | Explanation of discrepancy | Fax/ Post/ Email |
3.1.13 | Within 21 WD of Meter reading | Submit corrected data to the following Volume Allocation Runs unless the discrepancy is not yet resolved. Once resolved submit corrected data or, failing this, proceed to 3.1.14 | CDCA |
|
| Internal Process |
3.1.14 | Within 60 WD of receipt of report | If discrepancy not resolved raise a formal dispute in accordance with BSCP11. | Registrant | Disputes Registrar | MAR report along with any supporting information. | Fax/ Post/ Email |
Short period between current and previous reading, (e.g. less than one week)
Mis-read/written by a factor of 10.
Mis-interpretation of UTC/BST local time.
Transposition of digits.
(a) Environment | Check that all Metering Equipment other than outdoor measurement transformers, are accommodated in a clean dry environment. |
(b) Identification | Check that all Settlement Meters are labelled or otherwise readily identifiable in terms of applicable circuit, measured quantity and power flow direction. |
(c) Indicators | Check Meter panels lamps, where fitted, are working satisfactorily and report any alarm indications. |
(d) Operation | Check that all Settlement Meters and Outstations are functioning correctly and that no circuits are de-energised. |
(e) Seals | Check that all Metering Equipment has appropriate seals and report any missing seals to the relevant MOA, Registrant and BSCCo. The equipment to check are:
|
(f) Register of seals applied | Check that the register of seals applied is kept on site, located near to the metering panel and is up-to-date. |
(g) Miscellaneous | Other information detailing areas of concern. |
Site Name: |
| |
Registrant: |
| |
Date: |
| |
MSID: |
| |
|
| |
(a) | Environment | Check that all Metering Equipment other than outdoor measurement transformers, are accommodated in a clean dry environment. |
|
| All Satisfactory YES/NO* |
(b) | Identification | Check that all Settlement Meters are labelled or otherwise readily identifiable in terms of applicable circuit, measured quantity and power flow direction. |
|
| All Satisfactory YES/NO* |
(c) | Indicators | Check Meter panel lamps, where fitted, are working satisfactorily and report any alarm indications. |
|
| All Satisfactory YES/NO* |
(d) | Operation | Check that all Settlement Meters and Outstations are functioning correctly and that no circuits are de-energised. |
|
| All Satisfactory YES/NO* |
(e) | Seals | Check that all Metering Equipment have appropriate seals and report any missing seals to the relevant MOA, Registrant and BSCCo. The equipment to check are:
|
|
| All Satisfactory YES/NO* |
(f) | Register of seals applied | Check that the register of seals applied is kept on site, located near to the metering panel and is up-to-date. |
|
| All Satisfactory YES/NO* |
(g) | Miscellaneous |
|
|
| |
Carried out by:
|
| |
Date:
|
|
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
1.0 | Code Effective Date | Designated Version | n/a | n/a |
2.0 | 14/12/00 | Work outstanding at Go Active resolution of inconsistencies inclusion of consultation comments | NCR219 | 09/006 |
3.0 | 24/06/03 | Approved Modification for June 03 Release | P62 | P62 48/003 |
4.0 | 30/06/04 | Change Proposal for June 04 Release | CP609 | ISG40/003 |
5.0 | 03/11/04 | Change Proposal for the CVA Programme Nov 04 Release | CP1032 | TDC58/03 |
6.0 | BETTA Effective Date | BETTA 6.3 rebadging for the CVA Feb 05 Release | BETTA 6.3 |
|
7.0 | 28/06/06 | June 06 Release | P190 | ISG/64/001 |
8.0 | 22/02/07 | February 07 Release | CP1153 v2.0 CP1176 | ISG65/02 ISG68/002 SVG67/002 |
9.0 | 26/06/08 | June 08 Release | CP1223 | SVG84/02 ISG84/01 TDC109/01 PAB84/11 |
10.0 | 24/06/10 | June 10 Release | CP1324 | ISG111/03 |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in ELEXON or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
1 If the daily MAR exceeds this tolerance, and the CDCA considers it to be a significant error, then the CDCA shall report it to the registrant as a metering fault.
2 In the case where difference metering is used to determine a Registrant’s Import / Export, the non-metered Registrant shall be provided with the Meter advance readings and MAR results of the metered Registrant.
3 These checks should be completed annually
** Delete as appropriate