CONTENTS

  • GENERAL
    • Introduction
    • THE SUPPLIER METER REGISTRATION SERVICES
    • DATA COLLECTION AND PROVISION
      • Supplier’s responsibility for the collection and provision of UTC Period Level Consumption data
      • Responsibility for the collection of half hourly data for Asset Metering Systems
      • UTC Period Level Consumption Data Collection
      • Determination of Load Shape Data
      • Determination of Supplier’s Metered Consumption and/or Asset Meter Register Virtual Lead Party’s Consumption
      • Determination of BM Unit’s Period Level Consumption
      • Determination of Supplier’s Metering System Metered Consumption
      • Aggregation for DUoS Report calculations by the Market-wide Data Service
      • Estimation of BM Unit’s Demand Disconnection Volumes
      • Determination of Allocated Metering System Metered Consumption
      • Determination of Metering System Delivered Volumes
      • Determination of MSID Pair Delivered Volumes and AMSID Pair Delivered Volumes
      • Determination of Annual Consumption for Metering Systems
    • SUPPLIER VOLUME ALLOCATION DATA INPUT
      • Supplier Volume Allocation Standing Data
      • Supplier Volume Allocation Periodic Data
    • VOLUME ALLOCATION RUNS
    • GSP GROUP CORRECTION
      • Delays and Failures
    • DETERMINATION OF PERIOD BM UNIT GROSS NON-FINAL DEMAND FOR SVA NON-FINAL DEMAND FACILITIES
    • DETERMINATION OF PERIOD BM UNIT NON CHARGEABLE DEMAND FOR EMR MSID DELARATIONS AND FOR EMR AMSID DELARATIONS

ANNEX S-3: SUPPLIER VOLUME ALLOCATION RULES FOR MHHS METERING SYSTEMS V1.0

Effective From Date:22/09/2025
Status:LIVE
Download