CONTENTS
- Supplier Questions
- 0.1 I have been unable to locate a Single Line Diagram (SLD), what should I do?
- 0.2 On the Supplier commitment page, what is meant by pre-P283 and how do I find out if a Metering System is pre-P283?
- 0.3 Where can I find the number of circuits assigned to the MPAN?
- 0.4 When are new audits added to the Technical Assurance Agent Management Tool (TAAMT)?
- Half Hourly Meter Operating Agent (HHMOA) Questions
- 0.1 Which days and what format should the ‘Three days Settlement Data’ evidence be in?
- 0.2 I am unable to download ‘Three days of Settlement Data’ as the asset is adopted and I do not have the appropriate software
- 0.3 What is Overall Accuracy?
- 0.4 What supporting evidence is required to justify my Overall Accuracy calculation?
- 0.5 I am unable to obtain ‘Three Days Settlement Data’ as the Meter is currently on hand held reads
- Half Hourly Data Collector (HHDC)
- 0.1 Which days and what format should the ‘Three days Settlement Data’ evidence be in?
- 0.2 Getting the Cumulative reads for the exact dates that are submitted in the ‘Three days Settlement Data’
- 0.3 I am required to submit an Allocation Schedule as evidence, however the site is not shared SVA
- 0.4 I am unable to obtain ‘Three Days Settlement Data’ as the Meter is currently on hand held reads
- Licensed Distributor System Operator (LDSO)
- 0.1 What are my obligations for the submission of Single Line Diagrams?
- 0.2 Our Single Line Diagrams only show the network as owned by the Distributor, not the customer, is this acceptable?
- 0.3 Why I have received a non-compliance for failure to submit a D02158 , when I submitted a D0215?
- Need more information?
Technical Assurance of Metering Desktop Audits – FAQs V1.0