Home
Rulebook Home
Balancing and Settlement Code
Guidance Notes
Radio Teleswitch Standard Settlement Configura...
Previous version
Next version
CONTENTS
BACKGROUND
Step 1- How do I identify the SSCs that need to be mapped?
Step 2- How do I replicate Load Managed Area (LMA) SSC’s and TPR’s
Step 3 - How do I identify the switched load TPR?
Step 4 - How will I know if switching times are in GMT or Clock Time?
Step 5 - How do I identify the Teleswitch User Groups and Teleswitch Group Ids
?
Step 6- How do I identify the most common switching times associated with each TPR?
Step 7 - How do I identify a non-Teleswitch equivalent SSC?
Step 8 - How do I check the
Line Loss Factor
s are valid?
General Considerations
Dynamically Teleswitched SSCs
APP
E
NDIX
A
Further Information:
Issues associated with the introduction of smart
Meter
s
Establishing valid SSCs
THE GUIDANCE
The Process Steps
Radio Teleswitch - Standard Settlement Configuration Mapping V3.0
Effective From Date:
11/10/2022
Status:
LIVE
Other versions
Download
Defined Terms
Cross-references