CONTENTS

  • Summary
  • Introduction
  • Installation and Commissioning of new Metering System.
  • MOA Commissions Metering Equipment.
  • Notification of Commissioning Status following completed, compliant Commissioning
  • Changes to Items of Metering Equipment comprised within an existing Metering System.
  • Transfer of Commissioning information within the COA process.
  • Transfer of Commissioning information where Commissioning is incomplete.
  • Appendix A - Example Data Flows
    • New Connection (no defect/omission)
    • New Connection (defect/omission)
    • Changes to items of Metering Equipment comprised within a Metering System
    • Change of Agent
  • Appendix B - High level process map of the transfer of Commissioning information.
  • Appendix C - Rejection to a request for a D0215 via the D0382 dataflow.

Notification of Commissioning Status Guidance V3.0

Effective From Date:11/02/2019
Status:LIVE
Other versions
Download