CONTENTS

  • Summary
  • 1 Introduction
  • 2 Background
  • 3 Production or Consumption Status of a Primary BM Unit
  • 4 Generators and Directly Connected Consumption Primary BM Units
  • 5 Supplier Meter Registration Service (SMRS) Registered Primary BM Units
  • 6 Trading Units
  • 7 Commissioning Primary BM Units
  • 8 Pumped Storage
  • 9 Interconnectors
  • 10 Credit Qualifying Primary BM Units
  • 11 Exemptable Generating Plant Primary BM Units
  • 12 Requests for Redetermination of an Assigned WDCALF, NWDCALF or SECALF value
    • 12.1 Appendix 1 – Calculation of Energy Indebtedness
    • 12.2 Appendix 2 – Calculation of HOL-WDCALF, HOL-NWDCALF, XHOL-WDCALF and XHOL-NWDCALF for SMRS Registered Primary BM Units
    • 12.3 Appendix 3 – Example Trading Unit Calculations
    • 12.4 Appendix 4 – CALF values for Commissioning Plant
    • 12.5 Appendix 5 – Form for Requesting a Redetermination of a WDCALF, NWDCALF or SECALF value
    • 12.6 Appendix 6 – Appeal of Assigned WDCALF, NWDCALF or SECALF – Form for Completion by Elexon
    • 12.7 Appendix 7 – Application to Request Alternative Methodology for Supplier Primary BM Units or Exempt Export Primary BM Units with Embedded Generation
    • 12.8 Appendix 9 – Amendment Record

Credit Assessment Load Factors (CALF) V32.0

Effective From Date:07/05/2024
Status:SUPERSEDED
Other versions
Download