HomeRulebook HomeBalancing and Settlement CodeGuidance NotesChange of Measurement Class and Change of Prof...
CONTENTS
- Introduction
- Change of Measurement Class
- Supplier-serviced Metering Systems
- Where is the CoMC processes defined for Supplier-serviced Metering Systems?
- Does a CoMC to HH require a change of Metering Equipment?
- How should Suppliers notify the new agents of a CoMC?
- How should Suppliers notify the old agents of a CoMC?
- HHDC-serviced Metering Systems
- Where is the CoMC process defined For HHDC-serviced Metering Systems?
- Does a CoMC to HH require a change of Metering Equipment?
- Is a site visit required for a CoMC to HH?
- How should Suppliers notify the new agents of a CoMC?
- How should Suppliers notify the old agents of a CoMC?
- When should Suppliers appoint and de-appoint their agents?
- How can interoperability issues be resolved?
- How should Suppliers manage the CoMC process?
- When should the HHMOA take the final NHH reading?
- What process should be followed where a CoMC is carried out at the same time as the upgrading of a service cable?
- CoMC for HHDC-Serviced Metering Systems above 100 kW or with Generating Plant above the Small Scale Third Party Generating Plant Limit (SSTPGPL)
- What is a 100kW Metering System?
- Does this mean that a Profile Class 1 to 4 Metering System cannot qualify as a 100kW Metering System?
- Who is responsible for identifying 100kW Metering Systems?
- What should the NHHDC include in the P0028 100kW Demand Report?
- What should Suppliers do on receipt of the P0028 100kW Demand Report?
- How soon must the Supplier arrange a CoMC?
- What happens when a Metering System no longer qualifies as 100kW?
- Change of Profile Class
- What is a Profile Class?
- Where is the Change of Profile Class process defined?
- When should a Supplier change the Profile Class?
- What Profile Class should be used if the Supplier does not know whether there is a switched load capability?
- How does the Supplier initiate the change of Profile Class process?
- What Profile Class should be used, where there is a DUoS charging requirement for maximum demand recording, before a Load Factor calculation has taken place?
- Need more information?
Change of Measurement Class and Change of Profile Class V15.0
Effective From Date:23/05/2023
Status:LIVE