CONTENTS

  • Purpose
  • 1. Introduction
    • 1.1 Scope
    • 1.2 Approval Process
    • 1.3 Assumptions
  • 2. Test Approach
  • 3.Test Environment and Data Requirements
  • 4. Key Test Scenarios for Central Management systems
    • 4.1 Scenario 1 – Switch Regime 999
    • 4.2 Scenario 2 – Switch Regime 998
    • 4.3 Scenario 3 – Control Failure for Multiple CMS Unit References
    • 4.4 Scenario 4 – Revised Data after Control Failure (following day)
  • 5. Requirements Test Checklist
    • 5.1 Central Management Systems
    • 5.2 Meter Administrator System
  • 6. Test Group Summary
    • 6.1 Central Management System
    • 6.2 Meter Administrator System
  • 7. Recording Test Results
    • Appendix A – Terms used in this Document
    • Need more information?

Central Management System Equivalent Meter Test Specification V6.0

Effective From Date:21/01/2019
Status:SUPERSEDED
Other versions
Download