HomeRulebook HomeBalancing and Settlement CodeGuidance NotesBSCp601 Protocol Test Script Cops 1 2 3 5 and 10
CONTENTS
- Introduction
- Testing Basic Requirements
- Application Details
- Test Result Summary
- Information to be recorded
- Test DR1 – Data Collection
- DR1-1 – Initial Data Collection
- DR1-2 – Repeat Data Collection
- Test DR2 – Passwords5
- DR2-1 – Incorrect Level 2 Password
- DR2-2 – Correct Level 2 Password
- Test DR3 – Clock Resets6
- DR3-1 – Clock Reset (UTC minus 10mins) with incorrect Level 2 Password
- DR3-2 – Clock Reset (UTC minus 10mins) with correct Level 2 Password
- DR3-3 – Clock Reset (UTC plus 10mins) with correct Level 2 Password
- Test DR4 – Event Alarm Flags7
- DR4-1a Phase Fail – One Phase/Each Phase8 in Consecutive Settlement Periods
- DR4-1b Outstation Supply Failure10 – in Consecutive Settlement Periods
- DR4-2 Battery Fail (where fitted)
- DR4-3 Metering Equipment Resets - Caused by other than a supply failure (where fitted)
- DR4-4 Interrogation Port Access
- DR4-5 Reverse Running (where fitted)
- Further Information
BSCP601 Protocol Test Script: CoPs 1, 2, 3, 5 and 10 V2.0
Effective From Date:30/06/2022
Status:LIVE
Other versions
Download