CONTENTS

  • Introduction
    • Testing Basic Requirements
    • Application Details
    • Test Result Summary
    • Information to be recorded
    • Test DR1 – Data Collection
    • DR1-1 – Initial Data Collection and Data File Creation (if applicable)
      • DR1-2 – Repeat Data Collection
    • Test DR2 – Data Security5
      • DR2-1 – Incorrect Access Protocol
      • DR2-2 – Correct Access Protocol
    • Test DR3 – Clock Resets6
    • DR3-1 – Clock Reset (UTC minus 10mins) with incorrect access protocol
      • DR3-2 – Clock Reset (UTC minus 10mins) with correct access protocol
      • DR3-3 – Clock Reset (UTC plus 10mins) with correct access protocol
  • Further Information

BSCP601 Protocol Test Script CoP11 Asset Metering V1.0

Effective From Date:30/06/2022
Status:LIVE
Download