- FOREWORD
- 1 SCOPE
- 2 REFERENCES
- 3 DEFINITIONS AND INTERPRETATIONS
- 3.1 100kW Metering System *
- 3.2 Accredited Laboratory ‡
- 3.3 Active Energy *
- 3.4 Active Power *
- 3.5 Actual Metering at the Asset Point ‡
- 3.6 Affected Party ‡
- 3.7 Apparatus *
- 3.8 Apparent Energy ‡
- 3.9 Apparent Power ‡
- 3.10 Asset ‡
- 3.11 Asset Differencing ‡
- 3.12 Asset Export ‡
- 3.13 Asset Export ID ‡
- 3.14 Asset Import ‡
- 3.15 Asset Import ID ‡
- 3.16 Asset Meter ‡
- 3.17 Asset Metering Point ‡
- 3.18 Asset Metering System ‡
- 3.19 Asset Metering System Number ‡
- 3.20 Asset Metering Type ‡
- 3.21 Associated Distribution System *
- 3.22 Auxiliary Load ‡
- 3.23 Balancing Service *
- 3.24 Boundary Point *
- 3.25 Boundary Point Metering System *
- 3.26 British Summer Time ‡
- 3.27 Co-ordinated Universal Time *
- 3.28 Commissioning ‡
- 3.29 Compensation ‡
- 3.30 Data Collector ‡
- 3.31 Data Retriever Instation ‡
- 3.32 Defined Metering at the Asset Point ‡
- 3.33 Demand Period ‡
- 3.34 Demand Values ‡
- 3.35 Dependent Load ‡
- 3.36 Dispatchable Asset ‡
- 3.37 Distribution Licence *
- 3.38 Distribution System *
- 3.39 Electricity *
- 3.40 Embedded Metering Device ‡
- 3.41 Equipment Owner *
- 3.42 Export *
- 3.43 Generating Unit *
- 3.44 Grid Code *
- 3.45 Half Hourly Integral Outstation Meter ‡
- 3.46 Import *
- 3.47 Independent Load ‡
- 3.48 Instation ‡
- 3.49 Interrogation Unit ‡
- 3.50 Licensed Distribution System Operator *
- 3.51 Maximum Demand ‡
- 3.52 Measured Quantity ‡
- 3.54 Meter Register ‡
- 3.55 Metering System Identifier Pair ‡
- 3.56 National Electricity Transmission System Operator *
- 3.57 Net Output ‡
- 3.58 Offshore Transmission System *
- 3.59 Offshore Transmission System User Assets *
- 3.60 Outstation ‡
- 3.61 Overall Accuracy ‡
- 3.62 Password ‡
- 3.63 Plant *
- 3.64 Proving Test ‡
- 3.65 Rated Measuring Current ‡
- 3.66 Reactive Energy *
- 3.67 Reactive Power *
- 3.68 Retail Energy Code*
- 3.69 Settlement Instation ‡
- 3.70 Settlement Period ‡
- 3.71 Single Line Diagram ‡
- 3.72 Supplier Meter Registration Service *
- 3.73 Electricity System Operator (ESO) Licence *
- 3.74 Transmission System *
- 3.75 Total System *
- 4 MEASUREMENT CRITERIA
- 4.1 Measured Quantities
- 4.2 Demand Values
- 5 ACCURACY REQUIREMENTS
- 5.1 Compensation for Measurement Transformer Error
- 5.2 Compensation for Power Transformer and/or Line Losses or Inverter Losses or Rectifier Losses
- 6 METERING EQUIPMENT CRITERIA
- 6.1 Asset Meters
- 6.1.1 Half Hourly Integral Outstation Meters (Approved for use under Code of Practice 1, 2, 3, 5 and 10) used as Asset Meters
- 6.1.2 Asset Meters whose primary purpose is the measurement of Active Power and/or Active Energy that are not approved13 Half Hourly Integral Outstation Meters
- 6.1.3 Asset Meters whose primary purpose is not the measurement of Active Power and/or Active Energy and are not a Half Hourly Integral Outstation Meter. These Embedded Metering Devices are embedded within equipment used for other purposes.
- 6.1.4 Facilities
- 6.1.5 Data Security
- 6.2 Measurement Transformers
- 7 TESTING FACILITIES
- 8 SEALING
- 9 COMMISSIONING AND PROVING
- 10 SINGLE LINE DIAGRAM
- 11 Asset Differencing
- 12 RECORD KEEPING
- 12.1 Metering Technical Details for Asset Metering Systems
- APPENDIX A – DEFINED METERING AT THE ASSET POINT
- APPENDIX B – IMPORT/EXPORT CONVENTION
- APPENDIX C – HALF HOURLY INTEGRAL OUTSTATION / SEPARATE OUTSTATION REQUIREMENTS
- 1. Outstation
- 1.1 Displays
- 1.2 Data storage
- 1.3 Time Keeping
- 1.4 Monitoring Facilities
- 1.5 Communications
- 1.6 Local Interrogation
- 1.7 Remote Interrogation
- APPENDIX D – COMMISSIONING REQUIREMENTS
- APPENDIX E – SINGLE LINE DIAGRAM REQUIREMENTS
- APPENDIX F – ASSET METERING COMPLEX SITE SUPPLEMENTARY INFORMATION FORM (COP11/FA)
Code of Practice11: Code of Practice for the Metering of Balancing Services Assets for Settlement Purposes V4.0
Effective From Date:27/11/2025
Status:LIVE
Other versions
Download