HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 9 The Metering of Import and ...Code of Practice 9 The Metering of Import and ... V 1 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy *
- 3.2 Active Power *
- 3.3 Certified
- 3.4 Current Transformer
- 3.5 De-Energised ‡
- 3.6 Defined Metering Point ‡
- 3.7 Distribution System *
- 3.8 electricity *
- 3.9 Export †
- 3.10 Import †
- 3.11 Isolating Switch
- 3.12 Meter *
- 3.13 Metering Equipment ‡
- 3.14 Meter Register ‡
- 3.15 Radio Teleswitch
- 3.16 Registrant *
- 3.17 SVA Customer *
- 3.18 Telemeter
- 3.19 Timeswitch
- 4. MEASUREMENT CRITERIA – WHOLE CURRENT METERS
- 4.1 Measured Quantities
- 4.1.1 Measured Quantities
- 4.2 Accuracy Requirements
- 4.2.1 Type Test Requirements
- 4.2.2 Import Active Energy Accuracy Requirements (M1)
- 4.2.3 Export Active Energy Accuracy Requirements (M2)3
- 4.2.4 Calibration
- 4.2.5 In-service Accuracy Limits
- 4.2.6 Type Approval
- 5. MEASUREMENT CRITERIA – CURRENT TRANSFORMER OPERATED METERS
- 5.1 Measured Quantities
- 5.1.1 Measured Quantities
- 5.2 Accuracy Requirements
- 5.2.1 Type Test Requirements
- 5.2.2 Import Active Energy Accuracy Requirements (M1)5
- 5.2.3 Export Active Energy Accuracy Requirements (M2)
- 5.2.4 Calibration
- 5.2.5 In-service Accuracy Limits
- 5.2.6 Voltage supply for Current Transformer operated Meters
- 5.2.7 Access to Voltage Supply and Meter Terminals
- 5.2.8 Current Transformers Installed on New and Existing Circuits
- 5.2.9 Access to Current Transformers
- 5.2.10 Type Approval
- 6. METERING EQUIPMENT CRITERIA
- 6.1 Meters
- 6.1.1 Metering configuration
- 6.2 Current Transformers
- 6.3 Registers, Displays and Facilities
- 6.3.1 Meters and TeleMeters
- 6.3.2 Displays
- 6.3.3 Timeswitches and Internal Meter Time Clock
- 6.3.4 Teleswitches
- 6.3.5 Time Keeping Accuracy
- 7. INSTALLATION OF METERS
- 7.1 BSC Accreditation Requirements
- 7.2 Meter Operation Code of Practice Agreement (MOCOPA) Requirements
- 7.3 Appropriate Seals
- 8. DEFINED METERING POINTS AND POINT OF SUPPLY
- 8.1 Responsibilities
- 8.1.1 Distribution System Operator Responsibilities
- 8.1.2 Meter Operator Agent Responsibilities
- 8.2 Multi-rate Whole Current Meter – where the SVA Customer’s installation does not directly connect with the installed Meter(s).
- 8.2.1 Installations with an Isolating Switch
- 8.3 Other Requirements
- 8.3.1 Anti Fraud Devices
- 8.3.2 Outside Meter Cabinets
- 8.3.3 High Risers and Laterals
- 8.4 Current Transformer Operated Metering Equipment
- 8.4.1 Provision of Test and Isolation Facilities
- 8.4.2 Interface between Meter Operator Agent and Distribution System Operator
- 8.4.3 SVA Customer Cabling
- 9. PROVISION OF METERING EQUIPMENT
Code of Practice 9: The Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes V1.0
Effective From Date:01/04/2004
Status:SUPERSEDED
Other versions
Download