CONTENTS

  • 1. FOREWORD
  • 2. SCOPE
  • 3. REFERENCES
  • 4. DEFINITIONS AND INTERPRETATIONS
    • 4.1 Active Energy *
    • 4.2 Active Power *
    • 4.3 Demand Period ‡
    • 4.4 Demand Values ‡
    • 4.5 Electricity *
    • 4.6 Energy Storage Device ‡
    • 4.7 Full Load ‡
    • 4.8 Import †
    • 4.9 Interrogation Unit ‡
    • 4.10 Maximum Demand †
    • 4.11 Meter *
    • 4.12 Metering Equipment *
    • 4.13 Meter Register ‡
    • 4.14 Outstation ‡
    • 4.15 Password ‡
    • 4.16 Outstation System ‡
    • 4.17 PSTN ‡
    • 4.18 Registrant *
    • 4.19 Settlement Instation ‡
    • 4.20 SVA Customer †
    • 4.21 UTC *
  • 5. MEASUREMENT CRITERIA
    • 5.1 Measured Quantities
    • 5.2 Accuracy Requirements
  • 6. METERING EQUIPMENT CRITERIA
    • 6.1 Meters
    • 6.2 Outstation
      • 6.2.1 Data Provision requirements
      • 6.2.2 Time Keeping
      • 6.2.3 Monitoring Facilities - Broadcast Clocks
    • 6.3 Displays and Facilities
    • 6.4 Communications
      • 6.4.1 Local Interrogation
      • 6.4.2 Remote Interrogation
      • 6.4.3 Standard Protocol
    • 6.5 Security Requirements
    • 6.6 Sealing
  • 7. ASSOCIATED FACILITIES
    • 7.1 Interrogation Unit
    • 7.2 Additional Features
  • 8. ACCESS TO DATA
  • 9. Appendix 1: Outline Data Structure and Formats
    • 9.1 Appendix 1a: Outline Data Structure
    • 9.2 Appendix 1b: Data Structure and Formats
      • 9.2.1 "TAG" Data Header Block
      • 9.2.2 Daily Header Block
      • 9.2.3 Data Block
      • 9.2.4 Data Authenticator
  • 10. Appendix 2a: Data Definitions and Descriptions
    • 10.1 Data Block
      • 10.1.1 General Definition
      • 10.1.2 Data Definition
    • 10.2 Meter Identifier - MID
      • 10.2.1 General Definition
      • 10.2.2 Data Definition
      • 10.2.3 Data Definition
    • 10.3 Date and Time of Reading Meter
      • 10.3.1 General Definition
      • 10.3.2 Data Definition
    • 10.4 kWh Cumulative Reading
      • 10.4.1 General Definition
      • 10.4.2 Data Definition
    • 10.5 Current kW Maximum Demand
      • 10.5.1 General Definition
      • 10.5.2 Data Definition
    • 10.6 Previous kW Maximum Demand
      • 10.6.1 General Definition
      • 10.6.2 Data Definition
    • 10.7 Cumulative Maximum Demand
      • 10.7.1 General Definition
      • 10.7.2 Data Definition
    • 10.8 Date Of Last MD Reset
      • 10.8.1 General Definition
      • 10.8.2 Data Definition
    • 10.9 Number Of Maximum Demand Resets
      • 10.9.1 General Definition
      • 10.9.2 Data Definition
    • 10.10 Multi-rate Energy Registers
      • 10.10.1 General Definition
      • 10.10.2 Data Definition
    • 10.11 Number of Days Data in Message
      • 10.11.1 General Definition
      • 10.11.2 Data Definition
    • 10.12 Profile Data
      • 10.12.1 General Definition
      • 10.12.2 Data Definition
    • 10.13 Authenticator
      • 10.13.1 General Definition
      • 10.13.2 Data Definition
    • 10.14 Authentication Key
      • 10.14.1 General Definition
      • 10.14.2 Data Definition
    • 10.15 Password
      • 10.15.1 General Definition
      • 10.15.2 Data Definition
    • 10.16 Date and Time Set
      • 10.16.1 General Definition
      • 10.16.2 Data Definition
    • 10.17 Time Adjust
      • 10.17.1 General Definition
      • 10.17.2 Data Definition
    • 10.18 Maximum Demand Reset
      • 10.18.1 General Definition
      • 10.18.2 Data Definition
    • 10.19 Free Format Field of Meter ID
      • 10.19.1 General Definition
      • 10.19.2 Data Definition
    • 10.20 Code of Practice Six Identifier
      • 10.20.1 General Definition
      • 10.20.2 Data Definition
  • 11. Appendix 2b: Transport Protocol and Examples
    • 11.1 Introduction
    • 11.2 BS EN 61107
      • 11.2.1 Read Selected Meters
      • 11.2.2 Password Security
      • 11.2.3 Reads
      • 11.2.4 Writes
    • 11.3 Read Data Block
    • 11.4 Authenticator
    • 11.5 Authentication Key
    • 11.6 Set Password
    • 11.7 Time and Date
    • 11.8 Time Adjust
    • 11.9 Reset MD
    • 11.10 Free Format Field of Meter ID (ppp)
    • 11.11 Code of Practice Six Identifier
  • 12. Appendix 3: Authentication
    • 12.1 Authentication Overview
    • 12.2 Authentication Process
  • 13. Appendix 4: Authenticator Calculation
  • 14. Appendix 5: Multi-rate Register Switching Regime
  • 15. Annex: Use of Code of Practice Six in CVA Settlements

Code of Practice 6: The Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes V10.0

Effective From Date:22/09/2025
Status:LIVE
Other versions
Download