HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 5 The Metering of Energy Tran...
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy *
- 3.2 Active Power *
- 3.3 Actual Metering Point ‡
- 3.4 Apparent Energy ‡
- 3.5 Apparent Power ‡
- 3.6 Boundary Point *
- 3.7 CTN ‡
- 3.8 CVA Customer †
- 3.9 De-Energised ‡
- 3.10 Defined Metering Point ‡
- 3.11 Demand Period ‡
- 3.12 Demand Values ‡
- 3.13 Electricity *
- 3.14 Export †
- 3.15 Import †
- 3.16 Interrogation Unit ‡
- 3.17 Licensed Distribution System Operator (LDSO) *
- 3.18 Maximum Demand †
- 3.19 Meter *
- 3.20 Metering Equipment *
- 3.21 Meter Register ‡
- 3.22 Offshore Platform
- 3.23 Offshore Power Park Module
- 3.24 Outstation *
- 3.25 Outstation System ‡
- 3.26 Password ‡
- 3.27 PSTN ‡
- 3.28 Rated Measuring Current ‡
- 3.29 Reactive Energy *
- 3.30 Reactive Power *
- 3.31 Registrant *
- 3.32 Settlement Instation ‡
- 3.33 Single Line Diagram (SLD)
- 3.34 Small Scale Third Party Generating Plant Limit *
- 3.35 Small Scale Third Party Generating Plant *
- 3.36 SVA Customer †
- 3.37 SVA Meter Operator Agent *
- 3.38 Systems Connection Point *
- 3.39 UTC *
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values for Metering Systems Registered in CMRS
- 4.1.1 Measured Quantities
- 4.1.2 Demand Values
- 4.2 Measured Quantities and Demand Values for Metering Systems Registered in SMRS
- 4.2.1 Measured Quantities
- 4.2.2 Demand Values
- 4.3 Accuracy Requirements
- 4.3.1 Overall Accuracy
- 4.3.2 Compensation for Measurement Transformer Error
- 4.3.3 Compensation for Power Transformer and Line Losses
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Measurement Transformers
- 5.1.1 Current Transformers
- 5.1.2 Voltage Transformers
- 5.1.3 Measurement Transformers Installed on Existing Circuits
- 5.2 Fusing and Testing Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant or Supplier Information
- 5.4.1 Displays
- 5.4.2 Facilities
- 5.5 Outstation
- 5.5.1 Data Storage
- 5.5.2 Time Keeping
- 5.5.3 Monitoring Facilities
- 5.6 Communications
- 5.6.1 Local Interrogation
- 5.6.2 Remote Interrogation
- 5.7 Appropriate Seals
- 5.8 Single Line Diagram
- 6. ASSOCIATED FACILITIES
- 6.1 Interrogation Unit
- 6.2 Additional Features
- 7. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
- APPENDIX B LABELLING OF METERS FOR IMPORT AND EXPORT
- APPENDIX C TYPICAL TESTING FACILITIES AND FUSING ARRANGEMENTS
- APPENDIX D PASSWORDS
- APPENDIX E OPTIONS FOR ENSURING METERS AND DISPLAYS CAN BE READ AND REMOTELY INTERROGATED
Code of Practice 5: The Metering of Energy Transfers with Maximum Demand of up to (and Including) 1MW for Settlement Purposes V22.0
Effective From Date:22/09/2025
Status:LIVE
Other versions
Download