HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 1 The Metering of Circuits Wi...Code of Practice 1 The Metering of Circuits Wi... V 5 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy *
- 3.2 Active Power *
- 3.3 Actual Metering Point ‡
- 3.4 Apparent Energy ‡
- 3.5 Apparent Power ‡
- 3.6 Central Data Collection Agent (CDCA) *
- 3.7 CTN
- 3.8 CVA
- 3.9 CVA Customer
- 3.10 Defined Metering Point ‡
- 3.11 Demand Period ‡
- 3.12 Demand Values ‡
- 3.13 electricity *
- 3.14 Export †
- 3.15 Import †
- 3.16 Interrogation Unit ‡
- 3.17 Meter *
- 3.18 Metering Equipment *
- 3.19 Meter Register ‡
- 3.20 Outstation *
- 3.21 Outstation System ‡
- 3.22 PSTN ‡
- 3.23 Password ‡
- 3.24 Rated Measuring Current ‡
- 3.25 Reactive Energy *
- 3.26 Reactive Power *
- 3.27 Registrant *
- 3.28 Settlement Instation ‡
- 3.29 SVA ‡
- 3.30 SVA Customer *
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values
- 4.1.1 Measured Quantities
- 4.1.2 Demand Values
- 4.2 Accuracy Requirements
- 4.2.1 Overall Accuracy
- 4.2.2 Compensation for Measurement Transformer Error
- 4.2.3 Compensation for Power Transformer and Line Losses
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Measurement Transformers
- 5.1.1 Current Transformers
- 5.1.2 Voltage Transformers
- 5.1.3 Monitoring of Voltage Transformers
- 5.1.4 Measurement Transformers Installed on Existing Circuits
- 5.2 Testing Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant Information
- 5.4.1 Displays
- 5.4.2 Facilities
- 5.5 Outstation
- 5.5.1 Data storage
- 5.5.2 Time Keeping
- 5.5.3 Monitoring Facilities
- 5.6 Communications
- 5.6.1 Local Interrogation
- 5.6.2 Remote Interrogation
- 5.7 Sealing
- 6. ASSOCIATED FACILITIES
- 6.1 Interrogation Unit
- 6.2 Additional Features
- 7. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
- APPENDIX B LABELLING OF METERS FOR IMPORT AND EXPORT
- APPENDIX C FUSING
- APPENDIX D PASSWORDS
- APPENDIX E GUIDANCE FOR THE USE OF MULTI CORE METERING CABLES
Code of Practice 1: The Metering of Circuits with a Rated Capacity Exceeding 100 MVA for Settlement Purposes V5.0
Effective From Date:25/06/2009
Status:SUPERSEDED
Other versions
Download