HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 1 The Metering of Circuits Wi...Code of Practice 1 The Metering of Circuits Wi... V 2 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy
- 3.2 Active Power
- 3.3 Actual Metering Point
- 3.4 Apparent Energy
- 3.5 Apparent Power
- 3.6 Central Data Collection Agent (CDCA)
- 3.7 CTN
- 3.8 CVA
- 3.9 Defined Metering Point
- 3.10 Demand Period
- 3.10 Demand Values
- 3.11 electricity
- 3.12 Export
- 3.13 Import
- 3.14 Interrogation Unit
- 3.15 Meter
- 3.16 Metering Equipment
- 3.17 Meter Register
- 3.1.8 Outstation
- 3.1.9 Outstation System
- 3.20 PSTN
- 3.21 Rated Measuring Current
- 3.22 Reactive Energy
- 3.23 Reactive Power
- 3.24 Registrant
- 3.25 Settlement Instation
- 3.26 SVA Customer
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values
- 4.1.1 Measured Quantities
- 4.1.2 Demand Values
- 4.2 Accuracy Requirements
- 4.2.1 Overall Accuracy
- 4.2.2 Compensation for Measurement Transformer Error
- 4.2.3 Compensation for Power Transformer and Line Losses
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Measurement Transformers
- 5.1.1 Current Transformers
- 5.1.2 Voltage Transformers
- 5.1.3 Measurement Transformers Installed on Existing Circuits
- 5.2 Testing Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant Information
- 5.4.1 Displays
- 5.4.2 Facilities
- 5.5 Outstation
- 5.5.1 Data storage
- 5.5.2 Time Keeping
- 5.5.3 Monitoring Facilities
- 5.6 Communications
- 5.6.1 Local Interrogation
- 5.6.2 Remote Interrogation
- 5.7 Sealing
- 6. ASSOCIATED FACILITIES
- 6.1 Interrogation Unit
- 6.2 Additional Features
- 7. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
- APPENDIX B
- APPENDIX C
Code of Practice 1: The Metering of Circuits with a Rated Capacity Exceeding 100 MVA for Settlement Purposes V2.0
Effective From Date:04/04/2005
Status:SUPERSEDED
Other versions
Download