HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 1 The Metering of Circuits Wi...Code of Practice 1 The Metering of Circuits Wi... V 17 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values for Metering Systems Registered in CMRS
- 4.2 Measured Quantities and Demand Values for Metering Systems Registered in SMRS
- 4.3 Accuracy Requirements
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Measurement Transformers
- Where circuits, other than those newly installed, are to be metered to this Code of Practice and where the installed measurement transformers do not comply fully with clauses 5.1.1 & 5.1.2, then such measurement transformers may be used providing the requirements in clauses 4.3.1 and 5.1.3 are met.5.2 Testing Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant Information
- 5.5 Outstation
- 5.6 Communications
- 5.7 Sealing
- 5.8 Single Line Diagram
- 6. ASSOCIATED FACILITIES
- 6.1 Interrogation Unit
- 6.2 Additional Features
- 7. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
- APPENDIX B LABELLING OF METERS FOR IMPORT AND EXPORT
- APPENDIX C FUSING
- APPENDIX D PASSWORDS
- APPENDIX E GUIDANCE FOR THE USE OF MULTI CORE METERING CABLES
- APPENDIX F: GUIDANCE FOR THE COMMUNICATION ARRANGEMENTS FOR METERING SYSTEMS LOCATED OFFSHORE AT OFFSHORE POWER PARK MODULES
- APPENDIX G: GUIDANCE FOR THE USE OF BUSBAR VOLTAGE TRANSFORMERS
Code of Practice 1: The Metering of Circuits with a Rated Capacity Exceeding 100 MVA for Settlement Purposes V17.0
Effective From Date:02/11/2023
Status:SUPERSEDED
Other versions
Download