HomeRulebook HomeBalancing and Settlement CodeCodes of PracticeCode of Practice 1 The Metering of Circuits Wi...Code of Practice 1 The Metering of Circuits Wi... V 10 0
CONTENTS
- 1. SCOPE
- 2. REFERENCES
- 3. DEFINITIONS AND INTERPRETATIONS
- 3.1 Active Energy *
- 3.2 Active Power *
- 3.3 Actual Metering Point ‡
- 3.4 Apparent Energy ‡
- 3.5 Apparent Power ‡
- 3.6 Central Data Collection Agent (CDCA) *
- 3.7 Communication Line ‡
- 3.8 CTN ‡
- 3.9 CVA ‡
- 3.10 CVA Customer †
- 3.11 Defined Metering Point ‡
- 3.12 Demand Period ‡
- 3.13 Demand Values ‡
- 3.14 electricity *
- 3.15 Export †
- 3.16 Import †
- 3.17 Interrogation Unit ‡
- 3.18 Meter *
- 3.19 Metering Equipment *
- 3.20 Meter Register ‡
- 3.21 Offshore Platform ‡
- 3.22 Offshore Power Park Module *
- 3.23 Outstation *
- 3.24 Outstation System ‡
- 3.25 PSTN ‡
- 3.26 Password ‡
- 3.27 Rated Measuring Current ‡
- 3.28 Reactive Energy *
- 3.29 Reactive Power *
- 3.30 Registrant *
- 3.31 Settlement Instation ‡
- 3.32 SVA ‡
- 3.33 SVA Customer *
- 4. MEASUREMENT CRITERIA
- 4.1 Measured Quantities and Demand Values for Metering Systems Registered in CMRS
- 4.1.1 Measured Quantities
- 4.1.2 Demand Values
- 4.2 Measured Quantities and Demand Values for Metering Systems Registered in SMRS
- 4.2.1 Measured Quantities
- 4.2.2 Demand Values
- 4.3 Accuracy Requirements
- 4.3.1 Overall Accuracy
- 4.3.2 Compensation for Measurement Transformer Error
- 4.3.3 Compensation for Power Transformer and Line Losses
- 5. METERING EQUIPMENT CRITERIA
- 5.1 Measurement Transformers
- 5.1.1 Current Transformers
- 5.1.2 Voltage Transformers
- 5.1.3 Monitoring of Voltage Transformers
- 5.1.4 Measurement Transformers Installed on Existing Circuits
- 5.2 Testing Facilities
- 5.3 Meters
- 5.4 Displays and Facilities for Registrant Information
- 5.4.1 Displays
- 5.4.2 Facilities
- 5.5 Outstation
- 5.5.1 Data storage
- 5.5.2 Time Keeping
- 5.5.3 Monitoring Facilities
- 5.6 Communications
- 5.6.1 Local Interrogation
- 5.6.2 Remote Interrogation
- 5.7 Sealing
- 6. ASSOCIATED FACILITIES
- 6.1 Interrogation Unit
- 6.2 Additional Features
- 7. ACCESS TO DATA
- APPENDIX A DEFINED METERING POINTS
- APPENDIX B LABELLING OF METERS FOR IMPORT AND EXPORT
- APPENDIX C FUSING
- APPENDIX D PASSWORDS
- APPENDIX E GUIDANCE FOR THE USE OF MULTI CORE METERING CABLES
- APPENDIX F: GUIDANCE FOR THE COMMUNICATION ARRANGEMENTS FOR METERING SYSTEMS LOCATED OFFSHORE AT OFFSHORE POWER PARK MODULES
Code of Practice 1: The Metering of Circuits with a Rated Capacity Exceeding 100 MVA for Settlement Purposes V10.0
Effective From Date:26/02/2015
Status:SUPERSEDED
Other versions
Download