HomeRulebook HomeBalancing and Settlement CodeCategory 3 DocumentsReplacement Reserve Schedule Methodology
CONTENTS
- 1 INTRODUCTION
- 1.1 Background
- 1.2 What is Project TERRE?
- 1.3 Why does the BSC require an RR Schedule?
- 1.4 What is the RR Schedule used for in Settlement?
- 1.4.1 Setting the baseline for settlement of subsequent BOAs
- 1.4.2 Calculation of Balancing Energy Deviation Volumes
- 1.4.3 Determination of Non-Delivery Volumes and Non-Delivery Charges
- 1.4.4 Determination of Imbalance Prices
- 1.4.5 Adjustment of Energy Imbalance Volumes
- 2 PRINCIPLES UNDERLYING THE RR SCHEDULE METHODOLOGY
- 2.1 General Principles
- 2.2 Principles relating to ramps
- 3 RR Schedule Methodology
- 3.1 Inputs and Outputs
- 3.2 Process for testing a candidate ramp duration
- 3.2.1 Treatment of Discontinuities in the RR Baseline
- 3.3 Procedure for Constructing RR Schedule
- 3.3.1 Step 1 – Derive RR Baseline
- 3.3.2 Step 2 – Create Ramps of Ten Minutes or Less (where possible)
- 3.3.3 Step 3 – Create An Initial Ramp of 11 to 30 minutes (where possible)
- 3.3.4 Step 4 – Create A Final Ramp
- 3.3.5 Step 5 – Create a straight ramp (without reference to Run-Up or Run-Down Rates)
- 3.3.6 Step 6 – Collate the RR Schedule
- 4 PROCESS FOR AMENDING THIS METHODOLOGY
- APPENDIX 1 – DEFINITIONS AND TERMS
- APPENDIX 2 – DETAILED LOGIC FOR TESTING CANDIDATE RAMP DURATION
- STEP 1 – Determine the profile P(t) to which the ramp must be added
- STEP2A – Model an Upwards Ramp
- STEP2B – Model a Downwards Ramp
- STEP 3 – Assess the candidate ramp
Replacement Reserve Schedule Methodology V2.0
Effective From Date:07/11/2019
Status:LIVE
Download